Kitchen remodel contractors in San Francisco
8,252 contractors have filed kitchen remodel permits in San Francisco since 2000. By permit record, the leaders are: Camp Roofing Ltd Dba Camp Construction (362 of 423 completed), Valex Construction (50 of 51 completed) and Sean M O'reilly (47 of 47 completed).
Ranked across every kitchen remodel permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Of the kitchen remodel contractors, the 400 that lead on this sort were read; the rest are not in this list. Showing contractors with a kitchen remodel permit in the last 5 years. Include inactive contractors
- 1Camp Roofing Ltd Dba Camp ConstructionLicense 1088923 423 permits: 362 completed, 55 in progress, 4 never finaled, 2 expired or cancelled. Last filed Sep 2026. Typically 70 days from permit to final inspection. Never finaled: 4 are 3 to 5 years old.
- 2Valex ConstructionLicense 809059 51 permits: 50 completed, 1 in progress. Last filed Jul 2026. Typically 128 days from permit to final inspection.
- 3Sean M O'reillyLicense 812877 47 permits: 47 completed. Last filed May 2026. Typically 77 days from permit to final inspection.
- 4Brady ConstructionLicense 539362 94 permits: 92 completed, 1 never finaled, 1 expired or cancelled. Last filed May 2026. Typically 83 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 5He & Kuang IncLicense 892144 43 permits: 39 completed, 4 in progress. Last filed Jul 2026. Typically 221 days from permit to final inspection.
- 6Yiu's Construction CoLicense 802681 127 permits: 122 completed, 1 in progress, 4 never finaled. Last filed Jul 2026. Typically 83 days from permit to final inspection. Never finaled: 3 are 5 to 10 years old, 1 is over 10 years old.
- 7Sure, Inc.License 561658 727 permits: 678 completed, 8 in progress, 23 never finaled, 18 expired or cancelled. Last filed Aug 2026. Typically 92 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 16 are 5 to 10 years old, 6 are over 10 years old.
- 8B R S ConstructionLicense 896799 32 permits: 32 completed. Last filed Jan 2024. Typically 86 days from permit to final inspection.
- 9Caruso Construction Inc.License 710510 53 permits: 51 completed, 1 in progress, 1 expired or cancelled. Last filed Dec 2025. Typically 255 days from permit to final inspection.
- 10Jason Liu Construction CompanyLicense 662067 30 permits: 30 completed. Last filed Sep 2022. Typically 246 days from permit to final inspection.
- 11North Bay ConstructionLicense 896978 55 permits: 50 completed, 4 in progress, 1 expired or cancelled. Last filed Jul 2026. Typically 207 days from permit to final inspection.
- 12Darc Ventures Inc Dba Spl Construction SLicense 938513 70 permits: 67 completed, 1 in progress, 2 expired or cancelled. Last filed Aug 2026. Typically 179 days from permit to final inspection.
- 13Urban Builder General Contracting IncLicense 869710 51 permits: 49 completed, 1 in progress, 1 never finaled. Last filed Jul 2025. Typically 206 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 14Custom Construction EnterprisesLicense 830244 30 permits: 29 completed, 1 in progress. Last filed Dec 2025. Typically 240 days from permit to final inspection.
- 15Yefa Construction IncLicense 1047719 31 permits: 28 completed, 3 in progress. Last filed Feb 2026. Typically 290 days from permit to final inspection.
- 16Kells Construction Inc.License 746714 29 permits: 28 completed, 1 in progress. Last filed Aug 2026. Typically 90 days from permit to final inspection.
- 17J. Ho Construction IncLicense 680425 169 permits: 158 completed, 2 in progress, 7 never finaled, 2 expired or cancelled. Last filed Apr 2026. Typically 84 days from permit to final inspection. Never finaled: 2 are 5 to 10 years old, 5 are over 10 years old.
- 18Saturn Construction CoLicense 861233 66 permits: 61 completed, 3 in progress, 2 never finaled. Last filed Jun 2026. Typically 232 days from permit to final inspection. Never finaled: 1 is 5 to 10 years old, 1 is over 10 years old.
- 19Nelson T Lewis Const Co Inc.License 195866 81 permits: 75 completed, 3 in progress, 3 expired or cancelled. Last filed Sep 2026. Typically 87 days from permit to final inspection.
- 20Reliable Construction IncLicense 983658 106 permits: 89 completed, 13 in progress, 3 never finaled, 1 expired or cancelled. Last filed Jul 2026. Typically 191 days from permit to final inspection. Never finaled: 1 is 3 to 5 years old, 2 are 5 to 10 years old.
- 21Toni's Construction IncLicense 551504 45 permits: 44 completed, 1 expired or cancelled. Last filed Jan 2026. Typically 135 days from permit to final inspection.
- 22Winder Construction Inc.License 1033654 30 permits: 25 completed, 5 in progress. Last filed Aug 2026. Typically 312 days from permit to final inspection.
- 23Jin Qing Construction Corp.License 1030182 27 permits: 25 completed, 2 in progress. Last filed Aug 2026. Typically 275 days from permit to final inspection.
- 24C J Reed Construction CoLicense 712090 43 permits: 42 completed, 1 never finaled. Last filed Dec 2025. Typically 66 days from permit to final inspection. Never finaled: 1 is over 10 years old.
- 25MrccLicense 821253 25 permits: 24 completed, 1 in progress. Last filed May 2026. Typically 170 days from permit to final inspection.
- 26D N ConstructionLicense 945873 24 permits: 24 completed. Last filed Jan 2026. Typically 119 days from permit to final inspection.
- 27Katz GroupLicense 1074133 24 permits: 23 completed, 1 in progress. Last filed Aug 2026. Typically 113 days from permit to final inspection.
- 28Hubert PennyLicense 809333 94 permits: 86 completed, 3 in progress, 3 never finaled, 2 expired or cancelled. Last filed Sep 2026. Typically 92 days from permit to final inspection. Never finaled: 2 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
- 29We Do Construction Inc.License 1096552 36 permits: 22 completed, 14 in progress. Last filed Oct 2026. Typically 190 days from permit to final inspection.
- 30Great Ocean Construction Inc.License 1103304 25 permits: 22 completed, 3 in progress. Last filed Jul 2026. Typically 160 days from permit to final inspection.
- 31John Woo ConstructionllcLicense 765131 23 permits: 22 completed, 1 in progress. Last filed Aug 2026. Typically 185 days from permit to final inspection.
- 32The Sustainable Cbo Inc Dba Oliver MackiLicense 988725 22 permits: 22 completed. Last filed Apr 2025. Typically 152 days from permit to final inspection.
- 33Robison Nieri White ConstructionLicense 796298 78 permits: 74 completed, 2 never finaled, 2 expired or cancelled. Last filed Sep 2024. Typically 217 days from permit to final inspection. Never finaled: 2 are over 10 years old.
- 34E B W Builders IncLicense 794942 38 permits: 36 completed, 1 in progress, 1 expired or cancelled. Last filed Dec 2025. Typically 142 days from permit to final inspection.
- 35Hang C Construction IncLicense 760153 38 permits: 36 completed, 1 in progress, 1 expired or cancelled. Last filed May 2025. Typically 162 days from permit to final inspection.
- 36Paul K VouLicense 415124 22 permits: 21 completed, 1 in progress. Last filed Dec 2024. Typically 167 days from permit to final inspection.
- 37Benjamin ShawLicense 646136 21 permits: 21 completed. Last filed May 2022. Typically 141 days from permit to final inspection.
- 38Macrobuild CorporationLicense 1024387 21 permits: 21 completed. Last filed May 2022. Typically 288 days from permit to final inspection.
- 39Patrick Coakley ConstructionLicense 819320 21 permits: 21 completed. Last filed Nov 2022. Typically 141 days from permit to final inspection.
- 40Peninsula Custom Construction IncLicense 880303 53 permits: 48 completed, 3 in progress, 2 never finaled. Last filed May 2025. Typically 104 days from permit to final inspection. Never finaled: 2 are 3 to 5 years old.
How long kitchen remodel permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent kitchen remodel permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 675 28th St | interior kitchen remodel at 2nd floor. no expansion of building envelope or exterior work.Details
interior kitchen remodel at 2nd floor. no expansion of building envelope or exterior work. | $62,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 519 Arkansas St | convert 538 sq of storage/garage area to conditioned live space. new all electric hvac. replace front windows in kind. replace front windows in kind. replace rear windows. interior stair rebuild. kitchen and bath remodel. minor structural work. no work outside (e) foot print. no change to use.Details
convert 538 sq of storage/garage area to conditioned live space. new all electric hvac. replace front windows in kind. replace front windows in kind. replace rear windows. interior stair rebuild. kitchen and bath remodel. minor structural work. no work outside (e) foot print. no change to use. | $125,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2298 Pacific Av | provide interior non-structural remodel: relocate kitchen, remodel / reconfigure 2 bath and 1 powder room, new finishes where required to achieve remodeling and match (e) adjacent.Details
provide interior non-structural remodel: relocate kitchen, remodel / reconfigure 2 bath and 1 powder room, new finishes where required to achieve remodeling and match (e) adjacent. | $98,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 3126 Santiago St | horizontal addition to 1st floor: addition of 2 bedrooms & closet spaces. addition of 2 bathrooms. 2nd floor: kitchen remodel. addition of 1 bedroom & closet space. addition of 1 bathroom.Details
horizontal addition to 1st floor: addition of 2 bedrooms & closet spaces. addition of 2 bathrooms. 2nd floor: kitchen remodel. addition of 1 bedroom & closet space. addition of 1 bathroom. | $180,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 5 Porter St | remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage.Details
remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage. | $250,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 522 Edinburgh St | interior remodeling: (e) kitchen to be remodeled; (e) 3rd floor bathroom to be remodeled; new roof for addingnew dormer for the bathroom expansionDetails
interior remodeling: (e) kitchen to be remodeled; (e) 3rd floor bathroom to be remodeled; new roof for addingnew dormer for the bathroom expansion | $50,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 17 Ora Wy | interior remodel with new door and windows (at rear) and a 32sqft infill at the back on the top level. the (e) crawl space behind the garage will be built out to create an unconditioned space for storage and equipment. the (e) 2nd floor will be reconfigured to expand the kitchen. the 3rd floor will.Details
interior remodel with new door and windows (at rear) and a 32sqft infill at the back on the top level. the (e) crawl space behind the garage will be built out to create an unconditioned space for storage and equipment. the (e) 2nd floor will be reconfigured to expand the kitchen. the 3rd floor will. | $450,000 | |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 75 Santa Ana Av | Del Rio Stone Dba: Del Rio Stone Constr. | kitchen remodel, converting and connecting garage 1/2 only into livable space, 1 bathroom will be demoed, and an addition/replacing a glass sunroom into a regular roof converting the space into a dining room.Details
kitchen remodel, converting and connecting garage 1/2 only into livable space, 1 bathroom will be demoed, and an addition/replacing a glass sunroom into a regular roof converting the space into a dining room. | $180,000 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2765 Greenwich St | Cs Construction Co | remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room.Details
remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room. | $249,069 |
| Oct 2, 2026 | In progress issued Oct 2026 | 1450 Hawes St | We Do Construction Inc. | repair approx. 180 sq. ft. of existing fire-damaged drywall and insulation. install one new electrical outlet and replace the existing kitchen faucet. no structural changes.Details
repair approx. 180 sq. ft. of existing fire-damaged drywall and insulation. install one new electrical outlet and replace the existing kitchen faucet. no structural changes. | $7,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 745 Lakeview Av | addition & alterations to (e) one story, sfd. new basement. great room addition at 1st floor & kitchen remodel. 2nd floor addition with new bedroom & bathrooms. approximatly 80 cu. ft. to be excavated for new basement below proposed addition.Details
addition & alterations to (e) one story, sfd. new basement. great room addition at 1st floor & kitchen remodel. 2nd floor addition with new bedroom & bathrooms. approximatly 80 cu. ft. to be excavated for new basement below proposed addition. | $199,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 3620 Balboa St | upgrade electrical and title 24 for temporary kitchen approved under 202511149684 due to fire damageDetails
upgrade electrical and title 24 for temporary kitchen approved under 202511149684 due to fire damage | $10,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 148 Caine Av | to comply with nov# 202657051. 1/f: add media room, 2 bedroom and 1 full bath. 2/f: remodel kitchen and bathroom. add new exterior stair at rear, replace garage door with in kind (w00d) replace front windows with kind (vinyl).Details
to comply with nov# 202657051. 1/f: add media room, 2 bedroom and 1 full bath. 2/f: remodel kitchen and bathroom. add new exterior stair at rear, replace garage door with in kind (w00d) replace front windows with kind (vinyl). | $180,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 36 College Av | 1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs.Details
1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs. | $80,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1620 Jones St | units 5 & 7 kitchen & bathroom remodel. structural reinforcing of joists @ (n) family areaDetails
units 5 & 7 kitchen & bathroom remodel. structural reinforcing of joists @ (n) family area | $90,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 738 Elizabeth St | revision to pa# 202010106301 for a kitchen renovation. changes include updated window and door configuration of rear of house.Details
revision to pa# 202010106301 for a kitchen renovation. changes include updated window and door configuration of rear of house. | ||
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1972 Green St | add adu: (e) studio to be legalized per nov #202540513. addition includes kitchen, bathroom and sleeping area. legalizing stair to unit and habitable space w/in (e) attic.Details
add adu: (e) studio to be legalized per nov #202540513. addition includes kitchen, bathroom and sleeping area. legalizing stair to unit and habitable space w/in (e) attic. | $85,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 2072 Ellis St | 1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit.Details
1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit. | $550,000 | |
| Oct 1, 2026 | In progress issued Oct 2026 | 250 King St | Brenes Construction | remodel 2 existing bathrooms in kind. replace tile finishes and vanities. kitchen: replace countertops in kind. no change to existing layout. no structural work, no wall removed or relocated. plumb, elec remain. all existing accessible features to be maintainedDetails
remodel 2 existing bathrooms in kind. replace tile finishes and vanities. kitchen: replace countertops in kind. no change to existing layout. no structural work, no wall removed or relocated. plumb, elec remain. all existing accessible features to be maintained | $9,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 3916 18th St | Custom Tile Works | top fl: remodel kitchen: remove 2 bisecting nonload bearing walls new appliances, fill 2 windows, install 1 new window, replace new skylight @ living room, new cabinets, new on demand 8 relocate water heater, sister new 2x6 to (e) 2x4 cicling joist @ kitchen, move (e) kitchen sink over 18" , 6 new..Details
top fl: remodel kitchen: remove 2 bisecting nonload bearing walls new appliances, fill 2 windows, install 1 new window, replace new skylight @ living room, new cabinets, new on demand 8 relocate water heater, sister new 2x6 to (e) 2x4 cicling joist @ kitchen, move (e) kitchen sink over 18" , 6 new.. | $98,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 2412 22nd Av | Kearney Construction Llc | demo and remove (e) deck and patio at rear yard. selective demo of (e) house for new addition. add new adu of 605sqft at ground lvl in rear yard, wood framing on concrete slab on grade w/ new bathroom and kitchen. add new master bedroom and bath addition to rear of (e) house above new adu. remodelDetails
demo and remove (e) deck and patio at rear yard. selective demo of (e) house for new addition. add new adu of 605sqft at ground lvl in rear yard, wood framing on concrete slab on grade w/ new bathroom and kitchen. add new master bedroom and bath addition to rear of (e) house above new adu. remodel | $120,000 |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 267 Bright St | new adu per ca govt code. at 1/f: modify (e) floor space with 1 new bedroom and bathroom, kitchen and laundry.Details
new adu per ca govt code. at 1/f: modify (e) floor space with 1 new bedroom and bathroom, kitchen and laundry. | $85,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 1736 Larkin St | vertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access...Details
vertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access... | $500,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 341 Avila St | expansion at (e) 3rd floor. vertical expansion 3'-5", horizontal addition at rear yard 1'-5". replace interior stair. renovate kitchen. renovate 3 full bathrooms, add 1 full bathroom & 1 half bath. project is subject to ab112 all-electric ordinance.Details
expansion at (e) 3rd floor. vertical expansion 3'-5", horizontal addition at rear yard 1'-5". replace interior stair. renovate kitchen. renovate 3 full bathrooms, add 1 full bathroom & 1 half bath. project is subject to ab112 all-electric ordinance. | $744,000 | |
| Sep 30, 2026 | In progress issued Sep 2026 | 3232 Buchanan St | Yellow Zone Construction | to comply with nov#202652319 (item 9) & 202657825, kitchen & bath remodel like kind, unit #3, install disconnect for sub-panel; install water heater; install drain and trap vent in tradesman corridor and legalize unpermitted laundry area in garage. to comply with nov #202652063Details
to comply with nov#202652319 (item 9) & 202657825, kitchen & bath remodel like kind, unit #3, install disconnect for sub-panel; install water heater; install drain and trap vent in tradesman corridor and legalize unpermitted laundry area in garage. to comply with nov #202652063 | $10,000 |
| Sep 30, 2026 | In progress issued Sep 2026 | 1849 Church St | Hrvc Construction Inc | kitchen, bathroom and laundry-elec room remodel. (apartments 1 & 3) all work in-kind, no layout changes and replace all plumbing fixtures. no removal of walls.Details
kitchen, bathroom and laundry-elec room remodel. (apartments 1 & 3) all work in-kind, no layout changes and replace all plumbing fixtures. no removal of walls. | $120,240 |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 555 Pacific Av | B-Side Inc. | core & shell permit: scope of work is limited to the basement(full)& portion of first flr basement, new kitchenette (e) accessible restroom blocs. 1st flr (1) new accessible kitchenette, accessible restroom, and new open interior stairwell, connecting to basement. general: new non-bearing partitionsDetails
core & shell permit: scope of work is limited to the basement(full)& portion of first flr basement, new kitchenette (e) accessible restroom blocs. 1st flr (1) new accessible kitchenette, accessible restroom, and new open interior stairwell, connecting to basement. general: new non-bearing partitions | $200,000 |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 663 09th Av | new plan configuration: move existing kitchen and 2 bathrooms for the new layout and remodel them. remove load bearing wall in the kitchen. replace the existing fire egress stair ladder with new stairs and landing in the rear.Details
new plan configuration: move existing kitchen and 2 bathrooms for the new layout and remodel them. remove load bearing wall in the kitchen. replace the existing fire egress stair ladder with new stairs and landing in the rear. | $160,000 | |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 114 Jasper Pl | new adu on 1/f including kitchen, 1 media room, sleeping area, & 1 3-fixture bathroom.Details
new adu on 1/f including kitchen, 1 media room, sleeping area, & 1 3-fixture bathroom. | $50,000 | |
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 2929 19th St | legalize existing kitchen. no new constructionDetails
legalize existing kitchen. no new construction |