Brenes Construction
- Based in
- Daly City
- On San Francisco permits
- Dec 2025 to Oct 2026
- Last 24 months
- 6 permits filed
6 permits since 2000: 2 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2026 | In progress issued Oct 2026 | 250 King St | remodel 2 existing bathrooms in kind. replace tile finishes and vanities. kitchen: replace countertops in kind. no change to existing layout. no structural work, no wall removed or relocated. plumb, elec remain. all existing accessible features to be maintainedDetails
remodel 2 existing bathrooms in kind. replace tile finishes and vanities. kitchen: replace countertops in kind. no change to existing layout. no structural work, no wall removed or relocated. plumb, elec remain. all existing accessible features to be maintained | $9,000 |
| Aug 11, 2026 | In progress issued Aug 2026 | 1585 08th Av | address correction to change permit 202608066212 from 1583 to 1585 8th aveDetails
address correction to change permit 202608066212 from 1583 to 1585 8th ave | |
| Aug 6, 2026 | In progress issued Aug 2026 | 1583 08th Av | in kind ktichen remodel , laundry relocate washer drain, add toilet and sink to bathroomDetails
in kind ktichen remodel , laundry relocate washer drain, add toilet and sink to bathroom | $26,000 |
| May 29, 2026 | Completed final sign-off Jun 2026 | 1254 Fell St | to comply with his nov 202655114 item #3. repair (less than 50%) wood deteriorating rear existing common area stairs in kind.Details
to comply with his nov 202655114 item #3. repair (less than 50%) wood deteriorating rear existing common area stairs in kind. | $7,500 |
| Mar 26, 2026 | In progress issued Mar 2026 | 61 Dorado Tr | kitchen & 2 bathrooms remodeling in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating.Details
kitchen & 2 bathrooms remodeling in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating. | $29,500 |
| Dec 30, 2025 | Completed final sign-off Feb 2026 | 211 Cornwall St | unit #3: replace kitchen cabinets, install new electrical circuits, new flooring, new shower trim, new angle stops for the kitchen.Details
unit #3: replace kitchen cabinets, install new electrical circuits, new flooring, new shower trim, new angle stops for the kitchen. | $13,000 |