9 permits since 2000 (contractor on 9 permits, designer on 2 permits): 3 completed, 6 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2026 | In progress issued Jun 2026 | 1662 24th Av | Millwright Construction | porch & stairs to yard from lowerl level bedroomDetails
porch & stairs to yard from lowerl level bedroom | $5,000 |
| Nov 26, 2025 | In progress filed Nov 2025, not yet issued | 361 Brannan St | Millwright Construction | modify 4 toilets into 4 showers in a commercial (gym) property. no new fixtures. re-purpose existing.Details
modify 4 toilets into 4 showers in a commercial (gym) property. no new fixtures. re-purpose existing. | $18,000 |
| Sep 4, 2025 | In progress issued Nov 2025 | 1662 24th Av | Millwright Construction | conversion of a portion of the ground floor garage into habitable space including a den and bathroom; infill existing open ground floor space with new bedroom; about 70 linear feet of shallow, perimeter foundation and about 574 sq. ft. of new habitable space.Details
conversion of a portion of the ground floor garage into habitable space including a den and bathroom; infill existing open ground floor space with new bedroom; about 70 linear feet of shallow, perimeter foundation and about 574 sq. ft. of new habitable space. | $80,000 |
| Jul 29, 2025 | In progress issued Jul 2025 | 235 Lansdale Av | Millwright Construction | kitchen remodel. replace existing finishes in kind. no structural work.Details
kitchen remodel. replace existing finishes in kind. no structural work. | $70,000 |
| May 22, 2025 | In progress issued May 2025 | 235 Lansdale Av | Millwright Construction | 1/f demo 1 bathroom- remove tiles and fixtures and replace. no changes to layout/plumbing no structual change. no removal of walls. separte permit for remodelDetails
1/f demo 1 bathroom- remove tiles and fixtures and replace. no changes to layout/plumbing no structual change. no removal of walls. separte permit for remodel | $600 |
| Apr 10, 2025 | Completed final sign-off Jun 2026 | 564 Chenery St | Millwright Construction | upper floor: demo closet, casework, and existing bath finishes. interior demo only. (future pa# 202504013457)Details
upper floor: demo closet, casework, and existing bath finishes. interior demo only. (future pa# 202504013457) | $2,000 |
| Feb 19, 2025 | In progress filed Feb 2025, not yet issued | 1662 24th Av | Millwright Construction | frame new interior wall & closet, install new french door and window,install millwork in laundry area, new plugs, can lights,insulation and drywall.Details
frame new interior wall & closet, install new french door and window,install millwork in laundry area, new plugs, can lights,insulation and drywall. | $12,000 |
| Feb 19, 2025 | Completed final sign-off Aug 2025 | 1383 29th Av | Millwright Construction | 2/f: add 1 bathroom, new shower, new toilet and new vanity. move existing bath fixtures in current bathroom. relocate toilet. new closet primary bedroom.Details
2/f: add 1 bathroom, new shower, new toilet and new vanity. move existing bath fixtures in current bathroom. relocate toilet. new closet primary bedroom. | $25,000 |
| Sep 9, 2024 | Completed final sign-off Apr 2025 | 34 Greenview Ct | Millwright Construction | kitchen remodel: new cabinets, tile and lighting(replace existing in kind)Details
kitchen remodel: new cabinets, tile and lighting(replace existing in kind) | $20,000 |