9 permits since 2000: 3 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2026 | In progress issued Jun 2026 | 1662 24th Av | porch & stairs to yard from lowerl level bedroomDetails
porch & stairs to yard from lowerl level bedroom | $5,000 |
| Nov 26, 2025 | In progress filed Nov 2025, not yet issued | 361 Brannan St | modify 4 toilets into 4 showers in a commercial (gym) property. no new fixtures. re-purpose existing.Details
modify 4 toilets into 4 showers in a commercial (gym) property. no new fixtures. re-purpose existing. | $18,000 |
| Sep 4, 2025 | In progress issued Nov 2025 | 1662 24th Av | conversion of a portion of the ground floor garage into habitable space including a den and bathroom; infill existing open ground floor space with new bedroom; about 70 linear feet of shallow, perimeter foundation and about 574 sq. ft. of new habitable space.Details
conversion of a portion of the ground floor garage into habitable space including a den and bathroom; infill existing open ground floor space with new bedroom; about 70 linear feet of shallow, perimeter foundation and about 574 sq. ft. of new habitable space. | $80,000 |
| Jul 29, 2025 | In progress issued Jul 2025 | 235 Lansdale Av | kitchen remodel. replace existing finishes in kind. no structural work.Details
kitchen remodel. replace existing finishes in kind. no structural work. | $70,000 |
| May 22, 2025 | In progress issued May 2025 | 235 Lansdale Av | 1/f demo 1 bathroom- remove tiles and fixtures and replace. no changes to layout/plumbing no structual change. no removal of walls. separte permit for remodelDetails
1/f demo 1 bathroom- remove tiles and fixtures and replace. no changes to layout/plumbing no structual change. no removal of walls. separte permit for remodel | $600 |
| Apr 10, 2025 | Completed final sign-off Jun 2026 | 564 Chenery St | upper floor: demo closet, casework, and existing bath finishes. interior demo only. (future pa# 202504013457)Details
upper floor: demo closet, casework, and existing bath finishes. interior demo only. (future pa# 202504013457) | $2,000 |
| Feb 19, 2025 | In progress filed Feb 2025, not yet issued | 1662 24th Av | frame new interior wall & closet, install new french door and window,install millwork in laundry area, new plugs, can lights,insulation and drywall.Details
frame new interior wall & closet, install new french door and window,install millwork in laundry area, new plugs, can lights,insulation and drywall. | $12,000 |
| Feb 19, 2025 | Completed final sign-off Aug 2025 | 1383 29th Av | 2/f: add 1 bathroom, new shower, new toilet and new vanity. move existing bath fixtures in current bathroom. relocate toilet. new closet primary bedroom.Details
2/f: add 1 bathroom, new shower, new toilet and new vanity. move existing bath fixtures in current bathroom. relocate toilet. new closet primary bedroom. | $25,000 |
| Sep 9, 2024 | Completed final sign-off Apr 2025 | 34 Greenview Ct | kitchen remodel: new cabinets, tile and lighting(replace existing in kind)Details