Xie Xing
- Listed as
- architect, engineer
- On San Francisco permits
- Mar 2023 to Apr 2025
11 permits since 2000 (architect on 10 permits, engineer on 1 permit): 9 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 28, 2025 | Completed final sign-off Oct 2025 | 469 Ivy St | Shiny Home Builders & Development Inc | for both units. interior remodel (1st flr and 2nd fl per plans; remodel (e) kitchen and add half bath) at first floor. remodel (e) bath, new full bath, laundry at 2nd floor.Details
for both units. interior remodel (1st flr and 2nd fl per plans; remodel (e) kitchen and add half bath) at first floor. remodel (e) bath, new full bath, laundry at 2nd floor. | $180,950 |
| Jan 23, 2025 | Completed final sign-off Jul 2026 | 3020 25th St | Environs Design Build | 1/f: excavate to 8' ceiling and infill overhang at side, below (e) conditioned space, and modify the space to new habitable floor space. 2/f: remodel (e) habitable space, infill east lightwell, new skylights, and replace all (e) windows.Details
1/f: excavate to 8' ceiling and infill overhang at side, below (e) conditioned space, and modify the space to new habitable floor space. 2/f: remodel (e) habitable space, infill east lightwell, new skylights, and replace all (e) windows. | $295,000 |
| Sep 3, 2024 | Completed final sign-off Feb 2025 | 813 York St | K L Construction & Remodeling | 1/f: convert (e) den into (n) kitchen, remodel (e) kitchen into (n) media room, remodel (e) living room to be bedroom. remodel (e) bathroom.Details
1/f: convert (e) den into (n) kitchen, remodel (e) kitchen into (n) media room, remodel (e) living room to be bedroom. remodel (e) bathroom. | $45,000 |
| Aug 12, 2024 | Completed final sign-off Feb 2025 | 147 Gladeview Wy | Aero Living Inc | at 1/f: remodel (e) work shop space into (n) bedroom, remodel (e) laundry and (e) bathroom. at 2/f remodel (e) kitchen and (e) bathrooms.Details
at 1/f: remodel (e) work shop space into (n) bedroom, remodel (e) laundry and (e) bathroom. at 2/f remodel (e) kitchen and (e) bathrooms. | $98,000 |
| Jul 26, 2024 | Completed final sign-off May 2025 | 69 Keystone Wy | Hyan Construction Company | at 1/f: provide (n) bedrooms, (n) laundry, (n) media room with wet bar and (n) bathroom. revising 2/f bathroom area remodel (permit #202406255247).Details
at 1/f: provide (n) bedrooms, (n) laundry, (n) media room with wet bar and (n) bathroom. revising 2/f bathroom area remodel (permit #202406255247). | $180,700 |
| Mar 27, 2024 | Completed final sign-off Oct 2024 | 137 11th Av | Environs Design Build | revision to pa# 202312212964 and complaint# 202420814: replace (e) 2nd floor rear roof due to dryrot and align south roof with north roof in height per plan. raised roofDetails
revision to pa# 202312212964 and complaint# 202420814: replace (e) 2nd floor rear roof due to dryrot and align south roof with north roof in height per plan. raised roof | $5,000 |
| Jan 4, 2024 | Completed final sign-off Sep 2025 | 232 16th Av | Ly Construction | 2/f, remodel (e) kitchen and bathrooms. remove (e) non bearing wall b/w kithcne and dining room. new light fixtures and outlets.Details
2/f, remodel (e) kitchen and bathrooms. remove (e) non bearing wall b/w kithcne and dining room. new light fixtures and outlets. | $88,700 |
| Jan 4, 2024 | In progress filed Jan 2024, not yet issued | 3462 Mission St | to comply w/ abe entrance 51-16, abe# 202211015202; per item 3 and 5 of the category checklist compliance form, there is an (e) ramp with more than 8% slope at entry that is technically infeasible to comply. install power door controller at entrance door per da-04/05. install 36" ht handrail at bothDetails
to comply w/ abe entrance 51-16, abe# 202211015202; per item 3 and 5 of the category checklist compliance form, there is an (e) ramp with more than 8% slope at entry that is technically infeasible to comply. install power door controller at entrance door per da-04/05. install 36" ht handrail at both | $5,000 | |
| Nov 8, 2023 | In progress issued May 2024 | 24 Fairmount St | Bay C T Construction Inc. | revision to approved permit# 202206287317: replace the rear pop-out three story structure in kind due to deterioration by dry rot; infill first floor area for storage.Details
revision to approved permit# 202206287317: replace the rear pop-out three story structure in kind due to deterioration by dry rot; infill first floor area for storage. | $135,000 |
| Sep 22, 2023 | Completed final sign-off Aug 2024 | 1532 Ocean Av | D K I Construction Co | comply w/ nov #202312724 and 202310114: tenant improvement - remodel (e) retail space, work included replacing (e) dryrot floor sleeper w/ (n) finished, modify (e) front ramp, upgrade (e) restroom, and new sink; remove front gate graffiti.Details
comply w/ nov #202312724 and 202310114: tenant improvement - remodel (e) retail space, work included replacing (e) dryrot floor sleeper w/ (n) finished, modify (e) front ramp, upgrade (e) restroom, and new sink; remove front gate graffiti. | $10,000 |
| Mar 8, 2023 | Completed final sign-off May 2023 | 2971 23rd Av | Kelun Construction | revision to pa 202203230704 - remove new skylight from scope of work.Details
revision to pa 202203230704 - remove new skylight from scope of work. |