Ly Construction
- Based in
- Castro Valley
- On San Francisco permits
- Aug 2012 to Aug 2026
- Last 24 months
- 6 permits filed
38 permits since 2000: 32 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 1528 Hudson Av | renew permits 202505156560 and dummyDetails
renew permits 202505156560 and dummy | |
| Jan 26, 2026 | Completed final sign-off Apr 2026 | 88 Godeus St | new pg&e service, main and meters. construct a meter closet add bearing wall and footing.Details
new pg&e service, main and meters. construct a meter closet add bearing wall and footing. | $8,000 |
| Dec 18, 2025 | In progress issued Dec 2025 | 88 Godeus St | minor revision to approved pa: 202505237135; relocate heat pump and water heater locations.Details
minor revision to approved pa: 202505237135; relocate heat pump and water heater locations. | |
| Oct 17, 2025 | Completed final sign-off Dec 2025 | 963 Pacific Av | 1)change of use & occupancy from b (office) to m(specialty grocery). 2) relocate lavatory. 3)add washable wall surface around service sink to meet cove base design. 4) new 34" height counter in staff rm. 5)nw display shelves & refrigeration in sale area. 6) existing lighting & heating system toDetails
1)change of use & occupancy from b (office) to m(specialty grocery). 2) relocate lavatory. 3)add washable wall surface around service sink to meet cove base design. 4) new 34" height counter in staff rm. 5)nw display shelves & refrigeration in sale area. 6) existing lighting & heating system to | $8,000 |
| May 23, 2025 | In progress issued Nov 2025 | 88 Godeus St | remodel entire apartment (88 godeus) 2nd/f. new heating system to replace electric baseboard. remodel kitchen & bathroom. new lighting, outlets, electric & sub panelDetails
remodel entire apartment (88 godeus) 2nd/f. new heating system to replace electric baseboard. remodel kitchen & bathroom. new lighting, outlets, electric & sub panel | $50,000 |
| Jan 9, 2025 | Completed final sign-off May 2026 | 95 Ravenwood Dr | legalize bedroom, full bath, and storage room at basement levelDetails
legalize bedroom, full bath, and storage room at basement level | $25,000 |
| Aug 19, 2024 | Completed final sign-off May 2025 | 110 32nd Av | revision to pa#'s 2016-0621-0534, 2022-0211-7868, 2021-0823-6921, 2020-0828-2848 & 2022-0329-1124 alter layout ground fl entry, kitchen & bathroom layout change, remove fire escape, replace patio door with windows on 2nd fl & solarium detailsDetails
revision to pa#'s 2016-0621-0534, 2022-0211-7868, 2021-0823-6921, 2020-0828-2848 & 2022-0329-1124 alter layout ground fl entry, kitchen & bathroom layout change, remove fire escape, replace patio door with windows on 2nd fl & solarium details | $15,000 |
| Jul 3, 2024 | Completed final sign-off May 2025 | 110 32nd Av | reroofing - ref bpa: 2016.0621.0534 and 2022.0329.1124Details
reroofing - ref bpa: 2016.0621.0534 and 2022.0329.1124 | $5,000 |
| Mar 20, 2024 | Completed final sign-off Nov 2024 | 246 Judah St | rev to pa# 2023-1107-0334; replace all windows in unit 1 & 3 keep the same size no changeDetails
rev to pa# 2023-1107-0334; replace all windows in unit 1 & 3 keep the same size no change | $30,000 |
| Jan 4, 2024 | Completed final sign-off Sep 2025 | 232 16th Av | 2/f, remodel (e) kitchen and bathrooms. remove (e) non bearing wall b/w kithcne and dining room. new light fixtures and outlets.Details
2/f, remodel (e) kitchen and bathrooms. remove (e) non bearing wall b/w kithcne and dining room. new light fixtures and outlets. | $88,700 |
| Nov 7, 2023 | Completed final sign-off Nov 2024 | 246 Judah St | remodeling of 2-dwelling units (#1 & #3) in an (e) 4-unit apt w/ commercial space. no new area outside of shell. no structural work. bedroom added to each unit. remodel of bath & kitchen @ each unit.Details
remodeling of 2-dwelling units (#1 & #3) in an (e) 4-unit apt w/ commercial space. no new area outside of shell. no structural work. bedroom added to each unit. remodel of bath & kitchen @ each unit. | $45,000 |
| Feb 28, 2023 | Completed final sign-off Jul 2024 | 2418 21st Av | revision to 202207208968. 1st fl: reconfigure layout (reduce scope of work). 2nd fl: minize 1 window at rear. 3rd fl: reconfigure bedroom layout. relocate skylight.Details
revision to 202207208968. 1st fl: reconfigure layout (reduce scope of work). 2nd fl: minize 1 window at rear. 3rd fl: reconfigure bedroom layout. relocate skylight. | |
| Jul 20, 2022 | Completed final sign-off Jul 2024 | 2418 21st Av | 1/f: add 1 den, office, media and 1.5 bathroom. 2/f & 3/f: complete interior remodel. front window alum clad wood.Details
1/f: add 1 den, office, media and 1.5 bathroom. 2/f & 3/f: complete interior remodel. front window alum clad wood. | $190,000 |
| Jun 2, 2022 | In progress issued Mar 2024 | 1528 Hudson Av | erect new 3-story 2 unit family dwelling under sb-09Details
erect new 3-story 2 unit family dwelling under sb-09 | $1,200,000 |
| May 24, 2022 | Completed final sign-off Apr 2023 | 1378 Portola Dr | kitchen remodeling. relocate pantry door. remove wall in between kitchen & dining room. add new wine cellar. replace window at kitchen.Details
kitchen remodeling. relocate pantry door. remove wall in between kitchen & dining room. add new wine cellar. replace window at kitchen. | $20,000 |
| Mar 29, 2022 | Completed final sign-off Sep 2025 | 110 32nd Av | commencement of pa #201606210534-s. horizontal addition (solarium) at penthouse floor. remove (2) chimneys. refinish (e) penthouse roof deck & replace damaged gutters & downspout.Details
commencement of pa #201606210534-s. horizontal addition (solarium) at penthouse floor. remove (2) chimneys. refinish (e) penthouse roof deck & replace damaged gutters & downspout. | $38,600 |
| Feb 25, 2022 | Expired or cancelled cancelled Aug 2022 | 170 Pfeiffer St | 3/f: new 42in high glass guardrail on terrace.Details
3/f: new 42in high glass guardrail on terrace. | $1,000 |
| Feb 11, 2022 | Completed final sign-off May 2025 | 110 32nd Av | facade alterations, remove extg horizontal siding and replace with stucco, modify extg window locations at front facade. ref approved pa #201606210535 and 202108236921Details
facade alterations, remove extg horizontal siding and replace with stucco, modify extg window locations at front facade. ref approved pa #201606210535 and 202108236921 | $22,000 |
| Dec 8, 2021 | Completed final sign-off Sep 2022 | 170 Pfeiffer St | 1/f: add interior stairs to garage. replace 3/f windows in kind.Details
1/f: add interior stairs to garage. replace 3/f windows in kind. | $50,000 |
| Oct 5, 2021 | Completed final sign-off Mar 2022 | 271 Vicente St | remodel existing kitchen. replace existing cabinets, countertop, sink and flooring in kind. upgrade electrical and plumbing.Details
remodel existing kitchen. replace existing cabinets, countertop, sink and flooring in kind. upgrade electrical and plumbing. | $10,000 |
| Aug 23, 2021 | Completed final sign-off Sep 2025 | 110 32nd Av | interior remodel of kitchen; 2 bathrooms and 1/2 bath. selective demolition of extg brick chimney provide new furnace and relocate tankless water heater. replace all windows in kind; add one side window in basement.Details
interior remodel of kitchen; 2 bathrooms and 1/2 bath. selective demolition of extg brick chimney provide new furnace and relocate tankless water heater. replace all windows in kind; add one side window in basement. | $170,000 |
| Jun 18, 2021 | Completed final sign-off Aug 2022 | 170 Pfeiffer St | remodel kitchen in kind in unit a & b,remodel powder room in kind in pethouse, remodel master bath & hallway bath in kind in pethouse. no structural work, remodel unit a: one bathroom and kitchen finishes replaced. remodel unit b: one bathroom & kitchen finishes replaced.Details
remodel kitchen in kind in unit a & b,remodel powder room in kind in pethouse, remodel master bath & hallway bath in kind in pethouse. no structural work, remodel unit a: one bathroom and kitchen finishes replaced. remodel unit b: one bathroom & kitchen finishes replaced. | $65,000 |
| Nov 20, 2020 | Completed final sign-off Mar 2022 | 271 Vicente St | remodel 1st floor to convert existing space to one bedroom, a family room, and 1-1/2 bathroom.Details
remodel 1st floor to convert existing space to one bedroom, a family room, and 1-1/2 bathroom. | $80,000 |
| Aug 28, 2020 | Completed final sign-off May 2025 | 110 32nd Av | replace 1200 sq ft of failing stucco at south & east elevation at rearDetails
replace 1200 sq ft of failing stucco at south & east elevation at rear | $10,000 |
| Oct 3, 2017 | Completed final sign-off Mar 2018 | 35 17th Av | to comply with nov#201700961: remove non-permitted lightwell infill and restore original lightwell.Details
to comply with nov#201700961: remove non-permitted lightwell infill and restore original lightwell. | $5,000 |
| Jun 9, 2017 | Completed final sign-off Aug 2017 | 3079 Broderick St | repair of guardrail on existing roof area. less than 50% repair. guardrail is for architectural purpose onlyDetails
repair of guardrail on existing roof area. less than 50% repair. guardrail is for architectural purpose only | $3,500 |
| Jul 28, 2016 | Completed final sign-off Mar 2017 | 2318 Quintara St | 1st floor - (n) bathroom, family, home office, bedroom and laundry room. new recessed entry door and infill (e) lightwell @ (e) stair; 2nd floor - (n) bathroom, remodl (e) bathroom & kitchen, replace front & rear windows and infill (e) stair opening, (n) media room on the 2nd floor.Details
1st floor - (n) bathroom, family, home office, bedroom and laundry room. new recessed entry door and infill (e) lightwell @ (e) stair; 2nd floor - (n) bathroom, remodl (e) bathroom & kitchen, replace front & rear windows and infill (e) stair opening, (n) media room on the 2nd floor. | $49,000 |
| May 16, 2016 | Completed final sign-off Oct 2017 | 3301 Cabrillo St | new half bath and hobby room in 1/f. no work on 2nd & 3rd floor.Details
new half bath and hobby room in 1/f. no work on 2nd & 3rd floor. | $17,000 |
| Aug 7, 2015 | Completed final sign-off Nov 2015 | 230 16th Av | revision to appl #2015.0713.1276 - set back new deck 3'-0" from property line, eliminated proposed 1-hr rated wall.Details
revision to appl #2015.0713.1276 - set back new deck 3'-0" from property line, eliminated proposed 1-hr rated wall. | |
| Jul 13, 2015 | Completed final sign-off Nov 2015 | 230 16th Av | at rear yard, replace deteriorated (e) stair and deck in kind. replace all front windows with alumi. cladded wood window in kind. construct one level new wood deck 5'6" above grade.Details
at rear yard, replace deteriorated (e) stair and deck in kind. replace all front windows with alumi. cladded wood window in kind. construct one level new wood deck 5'6" above grade. | $8,000 |
| May 7, 2015 | Completed final sign-off Oct 2017 | 3301 Cabrillo St | interior renovations, new furnace, electrical service upgrade, new lighting in remodel area, provide gyp. board over exposed framing in garage.Details
interior renovations, new furnace, electrical service upgrade, new lighting in remodel area, provide gyp. board over exposed framing in garage. | $30,000 |
| Nov 24, 2014 | Completed final sign-off Aug 2015 | 3040 25th Av | remodel (e) kitchen and dining; remodel (e) bathroom, new bathroom for master bedroom, and convert (e) dining to bedroom new light fixtures and outlets.Details
remodel (e) kitchen and dining; remodel (e) bathroom, new bathroom for master bedroom, and convert (e) dining to bedroom new light fixtures and outlets. | $30,000 |
| Sep 19, 2014 | Completed final sign-off Feb 2015 | 706 Spruce St | 1)amendment to application #201406239166. 2)provide missing footing at extg partition. replace dryrot framing members.Details
1)amendment to application #201406239166. 2)provide missing footing at extg partition. replace dryrot framing members. | $5,000 |
| Jun 23, 2014 | Completed final sign-off Feb 2015 | 706 Spruce St | interior alterations, remodel kitchen and bathroom, add 1 bathroom, install new furnace & water heater.Details
interior alterations, remodel kitchen and bathroom, add 1 bathroom, install new furnace & water heater. | $32,000 |
| Sep 9, 2013 | Completed final sign-off Dec 2013 | 105 03rd Av | renovation of existing 2 bathrooms , kitchen and add 25 recessed lights,Details
renovation of existing 2 bathrooms , kitchen and add 25 recessed lights, | $25,000 |
| Apr 12, 2013 | Completed final sign-off Aug 2013 | 230 16th Av | at 3rd floor-alterative (e) floor layout including remove & construct interior walls, new fixtures & outlets, new full bathroom, remodel (e) kitchen & bathroom, replace rear windowsDetails
at 3rd floor-alterative (e) floor layout including remove & construct interior walls, new fixtures & outlets, new full bathroom, remodel (e) kitchen & bathroom, replace rear windows | $30,000 |
| Nov 26, 2012 | Never finaled issued Aug 2015, no final | 372 Sussex St | 2 story rear addition. 2 (n) bedrooms, 1 (n) master bedroom, 1 (n) bath, rear porch deck, roof deck.Details
2 story rear addition. 2 (n) bedrooms, 1 (n) master bedroom, 1 (n) bath, rear porch deck, roof deck. | $40,000 |
| Aug 21, 2012 | Completed final sign-off Mar 2013 | 2824 24th St | renovation of e store.remove and replace e entrance door and store front. relocate e toilet room, remove and replace e slab. new counters and shelves.Details
renovation of e store.remove and replace e entrance door and store front. relocate e toilet room, remove and replace e slab. new counters and shelves. | $70,000 |