William Harrision
- Listed as
- architect, engineer
- Firm
- William Harrison Consulting
- Based in
- San Francisco
- On San Francisco permits
- Nov 2021 to May 2026
5 permits since 2000 (engineer on 4 permits, architect on 1 permit): 2 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2026 | In progress issued May 2026 | 2002 Bush St | Eg Construction Inc | revision to 202604089126. inspector requested structural plans for in kind stringer replacement due to dryrot.Details
revision to 202604089126. inspector requested structural plans for in kind stringer replacement due to dryrot. | $750 |
| Sep 25, 2025 | Expired or cancelled cancelled Oct 2025 | 581 Belvedere St | 1st floor/basemt: convert (e) rooms to adu per state adu; adu sq ft is 656 total (180 of that is new); new 37 sf deck @ rear yard for ladder pathway; voluntary lateral strengthening. (e) building is not sprinklered & does not have a manual fire alarm system. building will remain unsprinklered.Details
1st floor/basemt: convert (e) rooms to adu per state adu; adu sq ft is 656 total (180 of that is new); new 37 sf deck @ rear yard for ladder pathway; voluntary lateral strengthening. (e) building is not sprinklered & does not have a manual fire alarm system. building will remain unsprinklered. | $45,984 | |
| Oct 25, 2022 | Completed final sign-off Jun 2024 | 3830 Judah St | Rua Woods Construction Inc | unit legalization per 43-14. at 1st flr, reconfigure (e) bathroom, add kitchen cabinets, add bedroom closet to legalize unit. reconfigure rear yard stairs to comply with code. extend deck landings for bedroom egress/rescure.Details
unit legalization per 43-14. at 1st flr, reconfigure (e) bathroom, add kitchen cabinets, add bedroom closet to legalize unit. reconfigure rear yard stairs to comply with code. extend deck landings for bedroom egress/rescure. | $110,442 |
| Mar 8, 2022 | Never finaled issued Mar 2022, no final | 288 Juanita Wy | Opus Pacific Development | revision to pa# 202112134242. 1st fl: replace (e) front exterior stairs in-kind. 2nd fl: extend roof to create cover over front porch.Details
revision to pa# 202112134242. 1st fl: replace (e) front exterior stairs in-kind. 2nd fl: extend roof to create cover over front porch. | $11,389 |
| Nov 15, 2021 | Completed final sign-off Jun 2022 | 671 Madrid St | remove existing window and walls at light well. build new wall over (e) lightwell floor. relocate (e) toilet. replace sink in kind & add skylightDetails
remove existing window and walls at light well. build new wall over (e) lightwell floor. relocate (e) toilet. replace sink in kind & add skylight | $10,000 |