Opus Pacific Development
- Based in
- Daly City
- On San Francisco permits
- Apr 2015 to May 2026
- Last 24 months
- 5 permits filed
20 permits since 2000: 12 completed, 4 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2026 | In progress issued May 2026 | 1670 11th Av | remodel ground floor for new media room, office, bathroom, laundry and storage.Details
remodel ground floor for new media room, office, bathroom, laundry and storage. | $197,663 |
| Jul 22, 2025 | In progress issued Jul 2025 | 2444 Taraval St | revision to approved application #201911227980. a) change storage room to be full bath and add 1 powder room at 1st floor. b) relocate bath room and toiletroom, add laundry room at 2nd floor.Details
revision to approved application #201911227980. a) change storage room to be full bath and add 1 powder room at 1st floor. b) relocate bath room and toiletroom, add laundry room at 2nd floor. | $20,000 |
| May 22, 2025 | Completed final sign-off Dec 2025 | 732 33rd Av | 2nd fl/ remodel kitchen and enlarge opening between kitchen and dining roomDetails
2nd fl/ remodel kitchen and enlarge opening between kitchen and dining room | $51,594 |
| Apr 25, 2025 | In progress issued Apr 2025 | 49 Telegraph Pl | revision to pa 202410102723 replace in-kind (e) 4"x12" header and install a (n) door. (e) header in dryrot to replace on top floor (rear)Details
revision to pa 202410102723 replace in-kind (e) 4"x12" header and install a (n) door. (e) header in dryrot to replace on top floor (rear) | $1,000 |
| Oct 10, 2024 | In progress issued Oct 2024 | 49 Telegraph Pl | for top flr- residential kitchen and flooring remodel. replace (e) powder room door. (n) tile (n) railing, and (n) waterproofing for balcony.Details
for top flr- residential kitchen and flooring remodel. replace (e) powder room door. (n) tile (n) railing, and (n) waterproofing for balcony. | $30,000 |
| Dec 7, 2023 | Completed final sign-off Sep 2025 | 16 Sherwood Ct | 2/f remove wall between kitchen & dining/ living areas, remodel kitchen, new exterior folding door to new rear yard deck & stairs to grade.Details
2/f remove wall between kitchen & dining/ living areas, remodel kitchen, new exterior folding door to new rear yard deck & stairs to grade. | $80,759 |
| Sep 12, 2023 | Completed final sign-off Apr 2024 | 327 Jersey St | 1st fl voluntary shear wall (n) heat pump 2nd fl. remodel and enlarge kithen 2'-0" towards pantry wall change the (e) door opening to the rear yard to a single frnch door w/side lightsDetails
1st fl voluntary shear wall (n) heat pump 2nd fl. remodel and enlarge kithen 2'-0" towards pantry wall change the (e) door opening to the rear yard to a single frnch door w/side lights | $73,400 |
| Aug 15, 2023 | Completed final sign-off Jun 2024 | 435 Fair Oaks St | 1st fl: lower slab of storage room & convert to media room. add window, relocate furnace. add counter top & cooktop to (e) kitchenette. 2nd & 3rd fls-no work.Details
1st fl: lower slab of storage room & convert to media room. add window, relocate furnace. add counter top & cooktop to (e) kitchenette. 2nd & 3rd fls-no work. | $76,775 |
| Mar 7, 2023 | Completed final sign-off Oct 2023 | 342 Los Palmos Dr | 2nd fl - remoel (e) kitchen, replace (e) door & window @ rear yard; remove interior wallDetails
2nd fl - remoel (e) kitchen, replace (e) door & window @ rear yard; remove interior wall | $47,500 |
| May 19, 2022 | Completed final sign-off Oct 2023 | 1763 20th Av | revision to pa# 202007170364. basement add secondary kitchen to rec room. 2nd fl change 2 fron windows to fiberglass.Details
revision to pa# 202007170364. basement add secondary kitchen to rec room. 2nd fl change 2 fron windows to fiberglass. | $4,000 |
| Mar 8, 2022 | Never finaled issued Mar 2022, no final | 288 Juanita Wy | revision to pa# 202112134242. 1st fl: replace (e) front exterior stairs in-kind. 2nd fl: extend roof to create cover over front porch.Details
revision to pa# 202112134242. 1st fl: replace (e) front exterior stairs in-kind. 2nd fl: extend roof to create cover over front porch. | $11,389 |
| Dec 13, 2021 | Never finaled issued Dec 2021, no final | 288 Juanita Wy | 1/f: convert portion of garage and remodel (e) office to new office/bedroom and new full bath. 2/f: remove wall between breakfast romm and kitchen for new larger kitchen. enlarge and remodel (e) bath, new 2/f deck and stairs at rear yard.Details
1/f: convert portion of garage and remodel (e) office to new office/bedroom and new full bath. 2/f: remove wall between breakfast romm and kitchen for new larger kitchen. enlarge and remodel (e) bath, new 2/f deck and stairs at rear yard. | $159,029 |
| Mar 24, 2021 | Completed final sign-off Mar 2024 | 466 Country Club Dr | add 500 sf adu at ground floor. no change to existing 2nd floor, no changes that can be seen from the street.Details
add 500 sf adu at ground floor. no change to existing 2nd floor, no changes that can be seen from the street. | $87,822 |
| Jul 17, 2020 | Completed final sign-off Oct 2023 | 1763 20th Av | basement: expand/excavate bedroom under (e) house. reconstruct interior connecting stair. flr '1': renovate kit/liv/din/study. flr '2': create second story addition with (4) bdrms / (2) baths + washer/dryerDetails
basement: expand/excavate bedroom under (e) house. reconstruct interior connecting stair. flr '1': renovate kit/liv/din/study. flr '2': create second story addition with (4) bdrms / (2) baths + washer/dryer | $300,000 |
| Nov 22, 2019 | Never finaled issued Nov 2019, no final | 2444 Taraval St | revision to app#201906062652: to comply with nov #201931601. remodel 3 story residence: remodel kitchen, 2 bathroom, powder room, winodw replacement, seismic structural upgrades and foundation work. new stairs to rear yard.Details
revision to app#201906062652: to comply with nov #201931601. remodel 3 story residence: remodel kitchen, 2 bathroom, powder room, winodw replacement, seismic structural upgrades and foundation work. new stairs to rear yard. | $450,000 |
| Aug 12, 2019 | Completed final sign-off May 2022 | 438 Melrose Av | vertical addition to 3rd floor. 765 sq. ft. to include 2 bedrooms & 2 bathrooms. add a roof deck over 2nd floor @ front of house. new interior stair from 2nd to 3rd floor. interior remodel @ 2nd floor inlcludes kitchen, window replacements.Details
vertical addition to 3rd floor. 765 sq. ft. to include 2 bedrooms & 2 bathrooms. add a roof deck over 2nd floor @ front of house. new interior stair from 2nd to 3rd floor. interior remodel @ 2nd floor inlcludes kitchen, window replacements. | $227,112 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 2444 Taraval St | per nov 201931601. replace in kind e front entry staircaseDetails
per nov 201931601. replace in kind e front entry staircase | $7,200 |
| Jun 15, 2018 | Completed final sign-off Sep 2019 | 2218 Lyon St | revisions to ba # 201504032798. eliminate new post footing for proposed deck. maher n/aDetails
revisions to ba # 201504032798. eliminate new post footing for proposed deck. maher n/a | |
| Mar 21, 2017 | Completed final sign-off Oct 2020 | 68 Agua Wy | ground floor to be developed for new bedrooms. bathrooms & office. horizontal addition to the rer, new 2nd floor wood deck & 1st floor patio, kitchen remodel.Details
ground floor to be developed for new bedrooms. bathrooms & office. horizontal addition to the rer, new 2nd floor wood deck & 1st floor patio, kitchen remodel. | $260,000 |
| Apr 3, 2015 | Completed final sign-off Sep 2019 | 2218 Lyon St | (e) kitchen renovation, addition habitable space for dining area on 2nd floor connecting with (n) wood decking, works including (n) french door, (n) double slider door between dining area and wood deck; a wooden stair , etc. ** maher: compliance with ordinance no# 155-13 not required **Details
(e) kitchen renovation, addition habitable space for dining area on 2nd floor connecting with (n) wood decking, works including (n) french door, (n) double slider door between dining area and wood deck; a wooden stair , etc. ** maher: compliance with ordinance no# 155-13 not required ** | $25,000 |