Thornton Weiler
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Thornton Weiler Aia
- Based in
- Alameda
- On San Francisco permits
- Mar 2002 to Sep 2022
23 permits since 2000 (architect on 21 permits, authorized agent-others on 1 permit, engineer on 1 permit): 15 completed, 1 in progress, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2022 | Never finaled filed Sep 2022, never issued | 1213 Scott St | Krueger Bros Builders Inc. | new addition: kitchen remodel,new cabinetry,fixtures,electrical,windows,doors b.new stairs from kitchen to basement excavate & build (n)332 sf conditioned spaced for office,laundry & storage.build two story addition,adding 140 sq ft on each fl with (n)stairs.build a new 315 sf roof deckDetails
new addition: kitchen remodel,new cabinetry,fixtures,electrical,windows,doors b.new stairs from kitchen to basement excavate & build (n)332 sf conditioned spaced for office,laundry & storage.build two story addition,adding 140 sq ft on each fl with (n)stairs.build a new 315 sf roof deck | $215,000 |
| Jun 16, 2022 | Completed final sign-off Mar 2025 | 1945 Franklin St | Capomastro Group:Acalifornia Corp., Ryan Builders Inc | ref #202102084218 secure bldg. fire damage repair mostly in the rear of the building and includes: replace charred siding installed over new plywood sheating, localized repair to (e) woord framing, replace rear roof decking roofing, and guardrails and privacy screens, repair outdoor living area withDetails
ref #202102084218 secure bldg. fire damage repair mostly in the rear of the building and includes: replace charred siding installed over new plywood sheating, localized repair to (e) woord framing, replace rear roof decking roofing, and guardrails and privacy screens, repair outdoor living area with | $3,700,000 |
| Jan 4, 2022 | Never finaled issued Jun 2023, no final | 372 Baker St | Jones Real Estate Development Llc, Krueger Bros Builders Inc., Meneses Construction (Ck Id) | fire dmg repair & includes: new roof top mounted heat pumps to condition each unit to replace gas wall heaters, n wall ceiling & floor finishes; n plumbing fix., appliances, n cabinets, n wndws in unit 302 to dmg windows, struct. repair includes replacing localized charred rafter & ceiiling joist onDetails
fire dmg repair & includes: new roof top mounted heat pumps to condition each unit to replace gas wall heaters, n wall ceiling & floor finishes; n plumbing fix., appliances, n cabinets, n wndws in unit 302 to dmg windows, struct. repair includes replacing localized charred rafter & ceiiling joist on | $500,000 |
| Dec 7, 2021 | Never finaled issued Dec 2021, no final | 1213 Scott St | Krueger Bros Builders Inc. | fire repair to 2 town homes with some framing damage at 1215 scott st. includes localized wood framing replacement in the 1st fl. under the stairs and new stairs. nw windows to replace damaged wndws. the front window will be reglazed in the original wood sashes. in both 1213 & 1215 scott stDetails
fire repair to 2 town homes with some framing damage at 1215 scott st. includes localized wood framing replacement in the 1st fl. under the stairs and new stairs. nw windows to replace damaged wndws. the front window will be reglazed in the original wood sashes. in both 1213 & 1215 scott st | $800,000 |
| Sep 7, 2021 | In progress issued Aug 2024 | 5624 Anza St | Mannon Construction | construct new 648sqft accessory dwelling unit within first floor unfinished space, excavate about 44 cubic yards and install new slab, install new laundry closet with new hook up, install new on demand hot water heater, install ducted mini heat pump system, work in upper unit removing a window and..Details
construct new 648sqft accessory dwelling unit within first floor unfinished space, excavate about 44 cubic yards and install new slab, install new laundry closet with new hook up, install new on demand hot water heater, install ducted mini heat pump system, work in upper unit removing a window and.. | $150,000 |
| May 13, 2019 | Completed final sign-off Nov 2022 | 445 Noe St | S.E.A Construction | convert garages to (2) adu per ordinance 162-16.Details
convert garages to (2) adu per ordinance 162-16. | $224,000 |
| Jun 8, 2017 | Completed final sign-off Jul 2018 | 881 Clayton St | Mannon Construction | construct a new roof deck over an exisitng flat roof. also remove two windows in bedrooms 1 +2 & install new two single glass doors. install new glass guardrail, the new deck is 300 s.f.Details
construct a new roof deck over an exisitng flat roof. also remove two windows in bedrooms 1 +2 & install new two single glass doors. install new glass guardrail, the new deck is 300 s.f. | $30,000 |
| Apr 5, 2017 | Completed final sign-off Jan 2020 | 174 Hearst Av | Mannon Construction, Curran & Associates General Contractors | the proposal is to add a bedroom, bathroom, kitchen/dining area, open staircase & basement workroom by making a horizontal extension of 19 feet to the rear of the house. excavation of the basement will provide space for new storage/utility area.Details
the proposal is to add a bedroom, bathroom, kitchen/dining area, open staircase & basement workroom by making a horizontal extension of 19 feet to the rear of the house. excavation of the basement will provide space for new storage/utility area. | $250,000 |
| Oct 28, 2015 | Completed final sign-off Nov 2017 | 515 Alabama St | Krueger Bros Builders Inc. | construct a new mezzanine approximately 760 sq ft and 1st floor accessible restroom. also install new entry doors at bldg entrance not visible from street. n/a for maher.Details
construct a new mezzanine approximately 760 sq ft and 1st floor accessible restroom. also install new entry doors at bldg entrance not visible from street. n/a for maher. | $25,000 |
| Aug 31, 2015 | Completed final sign-off May 2018 | 50 Ashbury Tr | Mannon Construction | this project is a vertical addition - construct a new bedroom addition on an existing 3rd floor roof deck for a new bedroom addition. the floor area of the new addition is 179 square feet.Details
this project is a vertical addition - construct a new bedroom addition on an existing 3rd floor roof deck for a new bedroom addition. the floor area of the new addition is 179 square feet. | $50,000 |
| May 12, 2015 | Completed final sign-off Jun 2016 | 1250 42nd Av | D Squared Construction | remove and construct new kitchen in front room. remove load bearing walls and install new beams. add new half bath and new master bath. add new dumb waiter. add new furnace, ductwork, and on demand hot water heater. replace all windows. add new landing and stairs at rear.Details
remove and construct new kitchen in front room. remove load bearing walls and install new beams. add new half bath and new master bath. add new dumb waiter. add new furnace, ductwork, and on demand hot water heater. replace all windows. add new landing and stairs at rear. | $80,000 |
| Jul 24, 2014 | Completed final sign-off Jun 2015 | 1367 Masonic Av | Mannon Construction | revision to app#201404304607. ceiling beams. new furnace shed on roof. gas line reviseDetails
revision to app#201404304607. ceiling beams. new furnace shed on roof. gas line revise | $6,000 |
| Jun 17, 2014 | Expired or cancelled expired May 2016 | 1280 02nd Av | Mannon Construction | remodel existing kitchen with new cabinets, appliances, finishes, remodel & construct new bath. electrical upgrade (partial)-new 125 amp panel, new outlets, lighting + switches where indicated on plans.Details
remodel existing kitchen with new cabinets, appliances, finishes, remodel & construct new bath. electrical upgrade (partial)-new 125 amp panel, new outlets, lighting + switches where indicated on plans. | $30,000 |
| Mar 12, 2014 | Expired or cancelled cancelled Feb 2017 | 212 Edgewood Av | new curb cut and sidewalk repairDetails
new curb cut and sidewalk repair | $5,000 | |
| Mar 5, 2014 | Never finaled issued Mar 2014, no final | 212 Edgewood Av | Bevilacqua & Sons | demolish existing retaining wall and driveway. widen new driveway and construct new retaining wallDetails
demolish existing retaining wall and driveway. widen new driveway and construct new retaining wall | $50,000 |
| Oct 28, 2013 | Completed final sign-off Jul 2014 | 30 Santa Ana Av | Mannon Construction | remodel existing kitchen and 3 2nd fl baths. install new beam at kitchen where headers are removed. new skylight and family room to replace existing. insulation and new gypsum bd over ceiling joists at family roomDetails
remodel existing kitchen and 3 2nd fl baths. install new beam at kitchen where headers are removed. new skylight and family room to replace existing. insulation and new gypsum bd over ceiling joists at family room | $75,000 |
| May 21, 2012 | Completed final sign-off Jun 2012 | 330 Frederick St | Mannon Construction | revision to pa# 2010-0623-5158-s1/r1-demolish upper deck & roof overhang. the firewall is revised for lower height as a result of the demolitionDetails
revision to pa# 2010-0623-5158-s1/r1-demolish upper deck & roof overhang. the firewall is revised for lower height as a result of the demolition | $150 |
| Jun 20, 2011 | Never finaled issued Jul 2011, no final | 330 Ellis St | West Point Builders Inc | 5th floor - interior storefront partitions & casework, new flooring.Details
5th floor - interior storefront partitions & casework, new flooring. | $115,000 |
| Dec 4, 2009 | Completed final sign-off Jan 2010 | 1966 Lombard St | Krueger Bros Builders Inc. | demolish part of (e) storefront & install new windows & accessible door. install grab bars & signage in restrooms.Details
demolish part of (e) storefront & install new windows & accessible door. install grab bars & signage in restrooms. | $5,000 |
| Nov 19, 2008 | Completed final sign-off Apr 2010 | 95 Winding Wy | Mannon Construction | demolish a 1 story, 1 car garage.Details
demolish a 1 story, 1 car garage. | $1,536 |
| Jul 7, 2008 | Completed final sign-off Apr 2010 | 95 Winding Wy | vertical/horizotnal addition - constructing a new 2-story addition with garage and deck. the addition includes a new bedroom & bath over garage. the existing garage will be demolished.Details
vertical/horizotnal addition - constructing a new 2-story addition with garage and deck. the addition includes a new bedroom & bath over garage. the existing garage will be demolished. | $120,000 | |
| Feb 14, 2006 | Completed final sign-off Apr 2018 | 1731 Grove St | new master bath & closet addition with balcony on the 3rd floor. 1st & 2nd floor addition under approved pa# 2005/04/13/9927.Details
new master bath & closet addition with balcony on the 3rd floor. 1st & 2nd floor addition under approved pa# 2005/04/13/9927. | $50,000 | |
| Mar 13, 2002 | Completed final sign-off Jul 2002 | 95 Winding Wy | install new bathroom & closetDetails
install new bathroom & closet | $20,000 |