Suzan Swabacker
- Listed as
- architect
- On San Francisco permits
- Aug 2023 to Dec 2025
6 permits since 2000 (architect on 6 permits): 4 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 30, 2025 | Completed final sign-off Jun 2026 | 172 06th St | Freestone Reconstruction Inc | revision to pa#: 202407317662; move (e) sink to opposite side of community room; relocate (e) stove; create u-shape with counter, install (2) 45-minute fire-resistance rated fixed windows in a 1-hour occupancy separation wall.Details
revision to pa#: 202407317662; move (e) sink to opposite side of community room; relocate (e) stove; create u-shape with counter, install (2) 45-minute fire-resistance rated fixed windows in a 1-hour occupancy separation wall. | $4,500 |
| Jul 31, 2025 | In progress filed Jul 2025, not yet issued | 480 Ellis St | Freestone Reconstruction Inc | replace (e) secondary lobby entry system with (n) existing system has fob and buzzer and so will (n) systemDetails
replace (e) secondary lobby entry system with (n) existing system has fob and buzzer and so will (n) system | $90,000 |
| Jul 31, 2024 | In progress issued Aug 2024 | 125 06th St | Freestone Reconstruction Inc | create 3 communications units w/ fire strobes. convert (e) common bathrooms wtih tubs to (n) common bathrooms with roll in showers. modernize (e) elevators with (n) controls.Details
create 3 communications units w/ fire strobes. convert (e) common bathrooms wtih tubs to (n) common bathrooms with roll in showers. modernize (e) elevators with (n) controls. | $950,000 |
| Jul 31, 2024 | Completed final sign-off May 2025 | 172 06th St | Freestone Reconstruction Inc | correct nov# 202294452 - cover drywall areas on 3rd - 5th floors in laundry rooms. drywall @ laundry room on 3rd, 4th, 5th floor - approx 200 sq.sf. nothing visible from street view.Details
correct nov# 202294452 - cover drywall areas on 3rd - 5th floors in laundry rooms. drywall @ laundry room on 3rd, 4th, 5th floor - approx 200 sq.sf. nothing visible from street view. | $25,000 |
| Apr 18, 2024 | Completed final sign-off May 2025 | 172 06th St | Freestone Reconstruction Inc | install (n) interior electrified door for security opens by buzzer or fob; replace steel door @ street w/new steel door. work @ street level onlyDetails
install (n) interior electrified door for security opens by buzzer or fob; replace steel door @ street w/new steel door. work @ street level only | $30,000 |
| Aug 30, 2023 | Completed final sign-off Jun 2026 | 480 Ellis St | Freestone Reconstruction Inc | replace (e) secondary inter lobby entry system @ arlington w/new secondary inter lobby entry system, (e) assembly sys is operated w/door buzzer;new door/window assembly sys will also operate by buzzer or fob. ada approach & access is met w/(e) assembly system, new sys will meet ada approach & accessDetails
replace (e) secondary inter lobby entry system @ arlington w/new secondary inter lobby entry system, (e) assembly sys is operated w/door buzzer;new door/window assembly sys will also operate by buzzer or fob. ada approach & access is met w/(e) assembly system, new sys will meet ada approach & access | $90,000 |