Freestone Reconstruction Inc
- Based in
- Hayden
- On San Francisco permits
- Oct 2019 to Sep 2026
- Last 24 months
- 5 permits filed
39 permits since 2000: 30 completed, 5 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old. 1 was filed but never issued.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress issued Sep 2026 | 243 Rey St | like in kind maintenance & repair of decks coatings @ 15 units-237 rey, 257 rey, 271 rey, 273 rey, 281 rey, 295 rey, 298 schwerin + 256,228, 208 schwerin, 1075 sunnydale, 15 garrison, 11 towerside, 21 heritage. | $65,000 |
| Jul 30, 2026 | In progress issued Jul 2026 | 21 Columbia Square St | units 416, 414, 413, 407, 402, 310, 307, 303, 301, 216, 207, 102, 101: replace (13) (e) bathroom exhaust fans w/ whisper sense humidity sensor | $23,582 |
| Dec 30, 2025 | Completed final sign-off Jun 2026 | 172 06th St | revision to pa#: 202407317662; move (e) sink to opposite side of community room; relocate (e) stove; create u-shape with counter, install (2) 45-minute fire-resistance rated fixed windows in a 1-hour occupancy separation wall. | $4,500 |
| Jul 31, 2025 | In progress filed Jul 2025, not yet issued | 480 Ellis St | replace (e) secondary lobby entry system with (n) existing system has fob and buzzer and so will (n) system | $90,000 |
| Jul 10, 2025 | Completed final sign-off Jun 2026 | 1075 Le Conte Av | 2nd and 5th floors: like in kind kitchen refresh @ studio units @ 15 units 2nd and 5th floors. cabinets, counter tops, appliances no floor plan changes. | $248,168 |
| Jul 31, 2024 | In progress issued Aug 2024 | 125 06th St | create 3 communications units w/ fire strobes. convert (e) common bathrooms wtih tubs to (n) common bathrooms with roll in showers. modernize (e) elevators with (n) controls. | $950,000 |
| Jul 31, 2024 | Completed final sign-off Jun 2026 | 172 06th St | modernize community room, basment complete repair of struc damage misc exterior repaint | $450,000 |
| Jul 31, 2024 | Completed final sign-off May 2025 | 172 06th St | correct nov# 202294452 - cover drywall areas on 3rd - 5th floors in laundry rooms. drywall @ laundry room on 3rd, 4th, 5th floor - approx 200 sq.sf. nothing visible from street view. | $25,000 |
| Jun 5, 2024 | Completed final sign-off Jul 2025 | 125 06th St | install 2nd entry door at reception area and reconfigure reception area layout. no exterior work. | $75,000 |
| Apr 18, 2024 | Completed final sign-off May 2025 | 172 06th St | install (n) interior electrified door for security opens by buzzer or fob; replace steel door @ street w/new steel door. work @ street level only | $30,000 |
| Sep 26, 2023 | In progress issued Dec 2023 | 55 Columbus Av | interior tenant improvement on portions of the 1st flr and basement. in-kind replacement of more energy efficient fixtures and furnitures. partial demolition or non-load bearing interior partitions. no changes of occupancy and use. | $350,000 |
| Aug 30, 2023 | Completed final sign-off Jun 2026 | 480 Ellis St | replace (e) secondary inter lobby entry system @ arlington w/new secondary inter lobby entry system, (e) assembly sys is operated w/door buzzer;new door/window assembly sys will also operate by buzzer or fob. ada approach & access is met w/(e) assembly system, new sys will meet ada approach & access | $90,000 |
| Apr 12, 2023 | Completed final sign-off Jan 2024 | 833 Bryant St | drywall flooring and paint on partial 2nd, 3rd, 4th floors; repair in kind drywal at hallways at floors 2, 3, 4. 5280sq ft at 2nd flr, 5280sq ft at 3rd flr, 864 sq ft at 4th floor. | $203,107 |
| Mar 14, 2022 | Never finaled filed Mar 2022, never issued | 652 Clarendon Av | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather dummy | $4,000 |
| Mar 14, 2022 | Completed final sign-off Mar 2024 | 618 Clarendon Av | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Mar 14, 2022 | Completed final sign-off Mar 2024 | 630 Clarendon Av | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Mar 14, 2022 | Completed final sign-off Apr 2024 | 660 Clarendon Av | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Mar 14, 2022 | Completed final sign-off Mar 2024 | 640 Clarendon Av | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Mar 14, 2022 | Completed final sign-off Mar 2024 | 636 Clarendon Av | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Mar 14, 2022 | Completed final sign-off Mar 2024 | 648 Clarendon Av | remove existing cantilevered wood balcony on front of residence. cut exisitng cantilevered floor joists flush with framing and install new plywood sheathing same thickness as adjacent sheathing. apply weather resistive barrier over sheathing and seal to existing weather barrier. install new infill | $4,000 |
| Oct 29, 2021 | Completed final sign-off Jan 2023 | 1269 Dolores St | work @ continueous deck that connect the enrey door to 2nd fl units. demo and dispose tiles and plywood substract down to framing @ 1st & 2nd fl. install new substrate and waterproof membrane @ 1st & 2nd fl walkways. restore finishes and paint to metch exsting. (invisible from street) | $50,000 |
| Sep 1, 2021 | Expired or cancelled cancelled Jan 2026 | 662 Clarendon Av | less than 50% repair of dryrot damage to (e) wood deck. remove and replace 9e) 4x4 & 4x6 post at deck guardrail. repair in-kind | $2,310 |
| Jul 1, 2021 | Never finaled issued Jul 2021, no final | 1279 41st Av | remove and replace 12 windows. all facing street. remove and replace stucco from front elevation (approx 650 sq ft) paint | $45,000 |
| May 5, 2021 | Completed final sign-off May 2023 | 608 Clarendon Av | replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings. | $10,000 |
| Apr 22, 2021 | Completed final sign-off May 2023 | 666 Clarendon Av | replace (e) cantilevered exterior wood deck that has been structurally compromised by dryrot, install new wood support beam and posts with concrete footings | $15,000 |
| Apr 22, 2021 | Completed final sign-off May 2023 | 610 Clarendon Av | replace existing cantilevered exterior deck that has been structually compromised by dryout. install new wood support beam and posts w/ concrete footings. no change in egress or deck area. | $15,000 |
| Dec 23, 2020 | Completed final sign-off May 2023 | 658 Clarendon Av | install (n) wood support beam, posts, diagonal bracing and concrete footings at exterior wood deck | $29,250 |
| Nov 9, 2020 | Completed final sign-off May 2023 | 654 Clarendon Av | install new wood support beam and posts at exterior wood deck. | $15,000 |
| Oct 17, 2020 | Never finaled issued Nov 2022, no final | 172 06th St | remove existing wood bench. build new reception area & mailbox. replace existing entrance doors w/ new doors and hardware. existing gate to remain. | $15,000 |
| Oct 14, 2020 | Completed final sign-off May 2023 | 668 Clarendon Av | replace existing cantilevered exterior wood deck that has been structurally compromised by dryrot. install new wood support beam and posts with concrete footings. | $15,000 |
| Oct 13, 2020 | Completed final sign-off May 2023 | 656 Clarendon Av | install new wood support beam and posts with concrete footings at exterior wood deck. diagonal bracing between posts. | $5,000 |
| Sep 24, 2020 | Completed final sign-off May 2023 | 664 Clarendon Av | install new wood support beam, posts with concrete footings & diagonal bracing at existing front exterior wood deck | $20,000 |
| Sep 10, 2020 | Completed final sign-off May 2023 | 660 Clarendon Av | install new wood support beam, posts, diagonal bracing, & concrete footins at exterior wood deck. | $26,980 |
| Aug 19, 2020 | Completed final sign-off Mar 2021 | 121 Steuart St | ground flr. light construction, floor coring, switch light fixtures, add electrical. all work at first flr. ground flr to remain publically accessible community space accessory to office use above. | $20,500 |
| May 27, 2020 | Completed final sign-off Feb 2021 | 690 Clarendon Av | less than 50% in-kind replacement of rear deck | $1,250 |
| Oct 7, 2019 | Completed final sign-off Feb 2021 | 612 Clarendon Av | deck replacement utilizing wood ledger on the bld wall and post and beam to support the outter ends of the joists. work per engineers plans, work is like for like | $13,200 |
| Oct 7, 2019 | Completed final sign-off Feb 2021 | 604 Clarendon Av | install new post and bean to retrofit the (e) decks work is like for like work per engineers plans | $4,400 |
| Oct 7, 2019 | Completed final sign-off Apr 2021 | 602 Clarendon Av | install new post and beam to retrofit the (e) decks work is like for like work per engineers plans | $4,400 |
| Oct 7, 2019 | Completed final sign-off Feb 2021 | 670 Clarendon Av | deck replacement utilizing wood ledger on the bld wall and post and beam to support the outter ends of the joists. work per engineers plans, work is like for like | $13,200 |