Susan Son
- Listed as
- architect
- Firm
- Susan Son Architect
- On San Francisco permits
- Jun 2018 to Dec 2024
7 permits since 2000 (architect on 7 permits): 6 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 26, 2024 | Completed final sign-off Nov 2025 | 115 Topaz Wy | D3 Construction | kitchen remodel: relocate non structural wall relocate fridge, sink, range, installed recessed downlights no added fixtures bathroom: relocation on main fl. relocate (e) full bath to (e) storage room space on same fl. no added fixtures no structural work.Details
kitchen remodel: relocate non structural wall relocate fridge, sink, range, installed recessed downlights no added fixtures bathroom: relocation on main fl. relocate (e) full bath to (e) storage room space on same fl. no added fixtures no structural work. | $32,000 |
| Jun 7, 2024 | Completed final sign-off Jul 2025 | 260 Montana St | D3 Construction | add ext door to backyard to garage. add 2 (n) skylights. replace 5 windows and door (street facing). replace existing bathroom fixtures & add tub to fl 1 bathroom, reconfiguration for the upstairs bedrooms. relocate interior staircase. relocate washer & dryer. renovate (e) kitchenDetails
add ext door to backyard to garage. add 2 (n) skylights. replace 5 windows and door (street facing). replace existing bathroom fixtures & add tub to fl 1 bathroom, reconfiguration for the upstairs bedrooms. relocate interior staircase. relocate washer & dryer. renovate (e) kitchen | $420,000 |
| Oct 14, 2022 | Completed final sign-off Oct 2023 | 565 Oxford St | removal of non-structural walls in kitchen and powder. relocation of powder room sink and toilet. addition of dishwasher and glass filler. no change to use, egress, or occupancy.Details
removal of non-structural walls in kitchen and powder. relocation of powder room sink and toilet. addition of dishwasher and glass filler. no change to use, egress, or occupancy. | $50,000 | |
| Sep 4, 2020 | Completed final sign-off Jul 2021 | 127 Beverly St | D3 Construction | revision to pa #2019-1224-0436: interior renovation work 2nd floor only. remove existing shower and tub replace with shower/tub combo. relocate toilet and sink. add powder room.Details
revision to pa #2019-1224-0436: interior renovation work 2nd floor only. remove existing shower and tub replace with shower/tub combo. relocate toilet and sink. add powder room. | $4,000 |
| Dec 24, 2019 | Completed final sign-off Jul 2021 | 127 Beverly St | D3 Construction | interior renovation w/fl 1 bathroom, kitchen sink & dishwasher location, replace (e) st windows, no change to opening. enlarge fl 1 rear windows, add hydronic. radiant fl heating w/combi. boiler & remove furnace & tank water heater. remove & replace (e) skylight. add gas line for future range.Details
interior renovation w/fl 1 bathroom, kitchen sink & dishwasher location, replace (e) st windows, no change to opening. enlarge fl 1 rear windows, add hydronic. radiant fl heating w/combi. boiler & remove furnace & tank water heater. remove & replace (e) skylight. add gas line for future range. | $290,000 |
| May 17, 2019 | Never finaled issued May 2019, no final | 81 Santa Marina St | Velox Construction | no change to use, egress, or occupancy. bathroom & kitchen renovation in (e) location. elec panel upgrade, removal of gravity furnace and replacement w/ hi efficiency heat pump. remove/replace water heater w/tankless. new skylightDetails
no change to use, egress, or occupancy. bathroom & kitchen renovation in (e) location. elec panel upgrade, removal of gravity furnace and replacement w/ hi efficiency heat pump. remove/replace water heater w/tankless. new skylight | $98,500 |
| Jun 29, 2018 | Completed final sign-off Jun 2023 | 1300 Mariposa St | D3 Construction | vertical addition. construct new 3/fl.relocate kitchen to 3/fl.add new mstr bath on 2/fl&pwdr rm on 3/fl. r/r (e)windows. restucco exterior.upgrade elec as eq. upgrade/reinforce structure as req.Details
vertical addition. construct new 3/fl.relocate kitchen to 3/fl.add new mstr bath on 2/fl&pwdr rm on 3/fl. r/r (e)windows. restucco exterior.upgrade elec as eq. upgrade/reinforce structure as req. | $350,000 |