Velox Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Nov 2019
- Last 24 months
- 0 permits filed
71 permits since 2000: 56 completed, 12 never finaled, 3 expired or cancelled.
Of the 12 never-finaled permits, 9 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 5, 2019 | Completed final sign-off Jan 2020 | 614 Pine St | 3rd demo & remodel leaking showers. new water proof pan & walking shower, new water proof walls & new subfloorDetails
3rd demo & remodel leaking showers. new water proof pan & walking shower, new water proof walls & new subfloor | $25,000 |
| Oct 25, 2019 | Completed final sign-off Apr 2022 | 777 Haight St | replace siding w like kind. paint rear of building same color. siding to be wood, approx 1200 sq ftDetails
replace siding w like kind. paint rear of building same color. siding to be wood, approx 1200 sq ft | $20,000 |
| Sep 27, 2019 | Completed final sign-off Dec 2021 | 125 Topaz Wy | replace horizontal t-11 siding with hardiplank horizontal sidingDetails
replace horizontal t-11 siding with hardiplank horizontal siding | $150,000 |
| Sep 25, 2019 | Completed final sign-off Dec 2021 | 107 Topaz Wy | replace (e) all around building exterior siding of fill with horizontal hardy where (e) plywood sheating exist and replace with same t-111 where no plywood sheeathing exist.Details
replace (e) all around building exterior siding of fill with horizontal hardy where (e) plywood sheating exist and replace with same t-111 where no plywood sheeathing exist. | $150,000 |
| Aug 28, 2019 | Completed final sign-off Nov 2020 | 720 Haight St | seismic stregthening first floor soft story ord 66-13Details
seismic stregthening first floor soft story ord 66-13 | $90,000 |
| Aug 21, 2019 | Completed final sign-off Apr 2022 | 775 Haight St | work to be done at 777 haight street apt 3: new kitchen layout, no framing modification-non-structural only. replace receptacles,/lights with like in-kind. new otilet, new vanity &* paint only for bathroom.Details
work to be done at 777 haight street apt 3: new kitchen layout, no framing modification-non-structural only. replace receptacles,/lights with like in-kind. new otilet, new vanity &* paint only for bathroom. | $15,000 |
| Aug 15, 2019 | Completed final sign-off Sep 2019 | 1 Lombard St | remodel kitchen in kind 2nd fl, suite 202 new cabinets and countertopsDetails
remodel kitchen in kind 2nd fl, suite 202 new cabinets and countertops | $10,000 |
| Jul 3, 2019 | Completed final sign-off Oct 2019 | 790 California St | unit 44: kitchen and bath remodel: new lights to be ledDetails
unit 44: kitchen and bath remodel: new lights to be led | $25,000 |
| Jun 12, 2019 | Completed final sign-off Sep 2019 | 4158 25th St | remodel two (e) bathrooms(half bath, approx 3x7/full bath 5x8). install (1) new shower pan in full bath. install (2) new light fixturesDetails
remodel two (e) bathrooms(half bath, approx 3x7/full bath 5x8). install (1) new shower pan in full bath. install (2) new light fixtures | $18,000 |
| May 17, 2019 | Never finaled issued May 2019, no final | 81 Santa Marina St | no change to use, egress, or occupancy. bathroom & kitchen renovation in (e) location. elec panel upgrade, removal of gravity furnace and replacement w/ hi efficiency heat pump. remove/replace water heater w/tankless. new skylightDetails
no change to use, egress, or occupancy. bathroom & kitchen renovation in (e) location. elec panel upgrade, removal of gravity furnace and replacement w/ hi efficiency heat pump. remove/replace water heater w/tankless. new skylight | $98,500 |
| May 16, 2019 | Never finaled issued Sep 2020, no final | 1929 Laguna St | conversion of unoccupied area in (e) ground floor to an adu (accessory dwelling unit). plumbing fixtures, electrical, mechanical work per ordinance #162-16Details
conversion of unoccupied area in (e) ground floor to an adu (accessory dwelling unit). plumbing fixtures, electrical, mechanical work per ordinance #162-16 | $100,000 |
| Mar 20, 2019 | Never finaled issued Mar 2019, no final | 614 Pine St | to comply with complaint # 201934931 unit 218- units 218 & 411: replace sink wiht vanity sink. replace light switches and outlets.Details
to comply with complaint # 201934931 unit 218- units 218 & 411: replace sink wiht vanity sink. replace light switches and outlets. | $2,000 |
| Feb 27, 2019 | Completed final sign-off May 2020 | 620 Haight St | voluntary strengthening of walls at the garage level incl partial foundation replacement, addition of hardy panel, plywood sheating, anchor bolts, hold downs and shear clipsDetails
voluntary strengthening of walls at the garage level incl partial foundation replacement, addition of hardy panel, plywood sheating, anchor bolts, hold downs and shear clips | $80,000 |
| Feb 6, 2019 | Never finaled issued Feb 2019, no final | 1875 Union St | sign, "hollow cow". wall painted, non-electric, removing old wooden signDetails
sign, "hollow cow". wall painted, non-electric, removing old wooden sign | $500 |
| Dec 14, 2018 | Completed final sign-off Oct 2019 | 911 Divisadero St | renovation 3rd floor, add dormer, relocate bath, relocate skylight, replace rear windows.Details
renovation 3rd floor, add dormer, relocate bath, relocate skylight, replace rear windows. | $100,000 |
| Dec 6, 2018 | Completed final sign-off Oct 2020 | 306 Pope St | revision to permit 201802020279, repair dryrot, reframe all walls, new exterior pw, siding.Details
revision to permit 201802020279, repair dryrot, reframe all walls, new exterior pw, siding. | $60,000 |
| Dec 4, 2018 | Completed final sign-off Feb 2019 | 718 Shrader St | bath remodel, replace bathtub, repalce wall tile, replace vanity, replace light fixture.Details
bath remodel, replace bathtub, repalce wall tile, replace vanity, replace light fixture. | $28,000 |
| Dec 4, 2018 | Completed final sign-off Mar 2019 | 260 King St | unit 1009: kitchen remodel, replace countertop w/sink replace floorDetails
unit 1009: kitchen remodel, replace countertop w/sink replace floor | $13,000 |
| Nov 16, 2018 | Completed final sign-off Oct 2020 | 306 Pope St | revision to pa#201802070279. replace siding on rear of building, dry rot found.Details
revision to pa#201802070279. replace siding on rear of building, dry rot found. | $20,000 |
| Sep 27, 2018 | Never finaled issued Sep 2018, no final | 2575 Washington St | unit 1: kitchen and bathroom remodel w/like kind, no structoral work no wall modification (framing)Details
unit 1: kitchen and bathroom remodel w/like kind, no structoral work no wall modification (framing) | $15,000 |
| Sep 6, 2018 | Completed final sign-off Oct 2020 | 306 Pope St | revision to permit #201802020279. foundation detail and support beam revision.Details
revision to permit #201802020279. foundation detail and support beam revision. | $10,000 |
| Aug 21, 2018 | Expired or cancelled cancelled Jan 2019 | 1565 Washington St | exploratory demo/dry wall repairs in units #2, #7, #12Details
exploratory demo/dry wall repairs in units #2, #7, #12 | $2,500 |
| Aug 10, 2018 | Completed final sign-off Oct 2018 | 776 41st Av | in revision to pa 2017-0913-7941 revision to s4.1 no foundation under shear wall. moved to line b at entry. no foundation found under shear wall between lines 2 & 3 poured 2' concrete footingDetails
in revision to pa 2017-0913-7941 revision to s4.1 no foundation under shear wall. moved to line b at entry. no foundation found under shear wall between lines 2 & 3 poured 2' concrete footing | |
| Aug 6, 2018 | Completed final sign-off Sep 2018 | 292 14th St | unit #6 -revision to 201804267538 install header across span in kitchen, per plans.Details
unit #6 -revision to 201804267538 install header across span in kitchen, per plans. | |
| Jul 31, 2018 | Completed final sign-off Oct 2018 | 1115 Polk St | for administrative purposes only to document that rooms on 2nd & 3rd flrs, room #20 & #30 are to be used as guest rooms per sf water records dated 07/7/1999. the rooms were inadvertently labeled store rooms on po.72903-3 dated 6/23/1943. no work on this permit.Details
for administrative purposes only to document that rooms on 2nd & 3rd flrs, room #20 & #30 are to be used as guest rooms per sf water records dated 07/7/1999. the rooms were inadvertently labeled store rooms on po.72903-3 dated 6/23/1943. no work on this permit. | |
| Jun 29, 2018 | Never finaled issued Dec 2018, no final | 1086 Fulton St | unit #3. interior remodel. relocate kitchen, relocate bedroom.Details
unit #3. interior remodel. relocate kitchen, relocate bedroom. | $60,000 |
| Apr 26, 2018 | Completed final sign-off Sep 2018 | 292 14th St | unit 6: kitchen & bathroom remodel with like-kind. maher ord 155-13 naDetails
unit 6: kitchen & bathroom remodel with like-kind. maher ord 155-13 na | $15,000 |
| Apr 18, 2018 | Completed final sign-off Nov 2018 | 3800 Scott St | unit 3. kitchen and bath remodel. closet wall to be removed and new 12 foot header to be installed. calcs for the design of the new 8 x 4 x 5/16 hss steel header & 2 new posts in living room areaDetails
unit 3. kitchen and bath remodel. closet wall to be removed and new 12 foot header to be installed. calcs for the design of the new 8 x 4 x 5/16 hss steel header & 2 new posts in living room area | $25,000 |
| Feb 9, 2018 | Completed final sign-off Jul 2018 | 3679 17th St | revision to 201708235616 for future adusDetails
revision to 201708235616 for future adus | |
| Feb 8, 2018 | Completed final sign-off Oct 2018 | 124 Waverly Pl | admin permit to document rooms on 2nd flr room #5,6,7 are to be used as res guest rooms per pa 198067-9/13/57. the rooms were inadvertently labeled as storage rooms on pa 403424-12/30/71. bld fully sprinklered. no wk on this permit.hotel will now contain 29 res g/r.Details
admin permit to document rooms on 2nd flr room #5,6,7 are to be used as res guest rooms per pa 198067-9/13/57. the rooms were inadvertently labeled as storage rooms on pa 403424-12/30/71. bld fully sprinklered. no wk on this permit.hotel will now contain 29 res g/r. | |
| Feb 2, 2018 | Completed final sign-off Dec 2020 | 306 Pope St | alterations to ground floor: add afull bathroom conditioned space.Details
alterations to ground floor: add afull bathroom conditioned space. | $60,000 |
| Feb 1, 2018 | Completed final sign-off Apr 2021 | 159 Castro St | installation of 1 new dwelling unit (adu) per ordinance 162-16. convert one storage space, add bath, one bedroom.Details
installation of 1 new dwelling unit (adu) per ordinance 162-16. convert one storage space, add bath, one bedroom. | $42,000 |
| Jan 3, 2018 | Completed final sign-off Feb 2018 | 645 44th Av | revision to bpa #201712075861, remodel bathroom, install shower panDetails
revision to bpa #201712075861, remodel bathroom, install shower pan | $8,000 |
| Dec 7, 2017 | Completed final sign-off Feb 2018 | 645 44th Av | kitchen remodel: upgade of electical (k&t) & upgrade of plumbing for kitchen area of unit.Details
kitchen remodel: upgade of electical (k&t) & upgrade of plumbing for kitchen area of unit. | $25,000 |
| Oct 25, 2017 | Expired or cancelled expired Mar 2026 | 945 Minnesota St | demo of walls & ceiling sheetrock & replace drywallfor upgrde of plumbing and elec. replace 100amp subpanel/electrical & plumbing pipes & new fixtures repair in kind.Details
demo of walls & ceiling sheetrock & replace drywallfor upgrde of plumbing and elec. replace 100amp subpanel/electrical & plumbing pipes & new fixtures repair in kind. | $30,000 |
| Sep 19, 2017 | Completed final sign-off Dec 2017 | 85 Richland Av | open walls around windows in units 85.5, 6, & 7 and repair dry rot with like kind.Details
open walls around windows in units 85.5, 6, & 7 and repair dry rot with like kind. | $5,000 |
| Sep 13, 2017 | Completed final sign-off Aug 2018 | 778 41st Av | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $75,000 |
| Sep 13, 2017 | Completed final sign-off Oct 2018 | 776 41st Av | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $75,000 |
| Sep 13, 2017 | Completed final sign-off Feb 2021 | 1929 Laguna St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $65,000 |
| Sep 5, 2017 | Completed final sign-off Jun 2019 | 2430 Lake St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $70,000 |
| Aug 25, 2017 | Completed final sign-off Sep 2019 | 769 Haight St | soft story retrofit per sfebc chapter 4d: other rational design.Details
soft story retrofit per sfebc chapter 4d: other rational design. | $100,000 |
| Aug 24, 2017 | Completed final sign-off Sep 2017 | 3456 Sacramento St | comply w/ nov 201797581 -exterior rear staircase - replace 12 stair treads w/ new, ; replace 16 kickstops, paint to match. not > 50%Details
comply w/ nov 201797581 -exterior rear staircase - replace 12 stair treads w/ new, ; replace 16 kickstops, paint to match. not > 50% | $5,700 |
| Aug 23, 2017 | Completed final sign-off Jul 2018 | 3679 17th St | soft story retrofit sfbc 34c 2012 iebc appendix a4Details
soft story retrofit sfbc 34c 2012 iebc appendix a4 | $30,000 |
| Aug 9, 2017 | Completed final sign-off Mar 2018 | 1490 Francisco St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $75,000 |
| Jul 27, 2017 | Completed final sign-off Apr 2021 | 191 Henry St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $80,000 |
| Jun 26, 2017 | Completed final sign-off Oct 2017 | 575 Pierce St | unit #201: remodel kitchen and bathroom like kind. expand kitchen "removal of non-structural walls" upgrade electrical and plumbing. maher naDetails
unit #201: remodel kitchen and bathroom like kind. expand kitchen "removal of non-structural walls" upgrade electrical and plumbing. maher na | $68,000 |
| May 26, 2017 | Completed final sign-off Oct 2017 | 85 Richland Av | unit 2 & 4: dry rot repair like kind, repair bay windowsDetails
unit 2 & 4: dry rot repair like kind, repair bay windows | $15,000 |
| May 10, 2017 | Completed final sign-off Jan 2018 | 1369 Hyde St | unit #71: upgrade plumbing and electrical. remodel 2 bathrooms and 1 kitchen. in kind.Details
unit #71: upgrade plumbing and electrical. remodel 2 bathrooms and 1 kitchen. in kind. | $62,000 |
| May 4, 2017 | Never finaled issued May 2017, no final | 364 Eddy St | apt 401: window upgrade /replacement in-kind due to fire damagne per complaint #201770251.Details
apt 401: window upgrade /replacement in-kind due to fire damagne per complaint #201770251. | $4,000 |
| Apr 28, 2017 | Completed final sign-off Aug 2017 | 575 Pierce St | unit #306: remodel kitchen and bathroom. expand kitchen by removing a non-structural wall. construction of new wall. upgrade electrical and plumbing. new cabinets, appliances, plumbing fixtures and finishes. maher n/a.Details
unit #306: remodel kitchen and bathroom. expand kitchen by removing a non-structural wall. construction of new wall. upgrade electrical and plumbing. new cabinets, appliances, plumbing fixtures and finishes. maher n/a. | $52,000 |
| Apr 12, 2017 | Never finaled issued Apr 2017, no final | 390 Bartlett St | unit #5: kitchen and bathroom remodel. no windows. no load bearing walls.Details
unit #5: kitchen and bathroom remodel. no windows. no load bearing walls. | $27,000 |
| Apr 11, 2017 | Completed final sign-off Dec 2017 | 4904 03rd St | comply w/ nov 201768311 - repair 3' x 8' lightwell common area.Details
comply w/ nov 201768311 - repair 3' x 8' lightwell common area. | $4,000 |
| Dec 9, 2016 | Completed final sign-off Apr 2017 | 4914 03rd St | complet work approved under permit application # 201411131419.Details
complet work approved under permit application # 201411131419. | $25,000 |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 4908 03rd St | complet work approved under permit application # 201411131423.Details
complet work approved under permit application # 201411131423. | $25,000 |
| Nov 3, 2016 | Completed final sign-off Dec 2017 | 308 Presidio Av | soft story wood frame seismic retrofit program. add 1 steel frame and shear wall on gr fl. 2012 iebc appendix a-4Details
soft story wood frame seismic retrofit program. add 1 steel frame and shear wall on gr fl. 2012 iebc appendix a-4 | $10,000 |
| Nov 1, 2016 | Completed final sign-off Nov 2016 | 2430 Lake St | unit #3: remodel one existing kitchen and two full bathrooms for job evaluation correction of $30,000. revision to app. #2016-08-30-6404. no alteration of wall, window or door.Details
unit #3: remodel one existing kitchen and two full bathrooms for job evaluation correction of $30,000. revision to app. #2016-08-30-6404. no alteration of wall, window or door. | $30,000 |
| Aug 31, 2016 | Never finaled issued Sep 2016, no final | 1875 Union St | revision to bpa 201608175309 - revised restroom layout.Details
revision to bpa 201608175309 - revised restroom layout. | |
| Aug 30, 2016 | Completed final sign-off Nov 2016 | 2430 Lake St | #3- remove all damaged drywell, open up walls between kitchen and living room, install new 5/8th fire rated type x drywall fasten with 2-1/4" type s drywall screw 7" on center through out unit, trench additional wall for electrical upgrade. no structural work. kitchen and bathroom only.Details
#3- remove all damaged drywell, open up walls between kitchen and living room, install new 5/8th fire rated type x drywall fasten with 2-1/4" type s drywall screw 7" on center through out unit, trench additional wall for electrical upgrade. no structural work. kitchen and bathroom only. | $12,000 |
| Aug 17, 2016 | Never finaled issued Aug 2016, no final | 1875 Union St | ada improvements, barrier removalDetails
ada improvements, barrier removal | $16,000 |
| Aug 16, 2016 | Completed final sign-off Oct 2016 | 2200 Leavenworth St | repair fire & water damage at common area hallway. 1st fl to 6th fl. insulation and sheetrock, to comply with violation #201609742, 201607991, 201623411Details
repair fire & water damage at common area hallway. 1st fl to 6th fl. insulation and sheetrock, to comply with violation #201609742, 201607991, 201623411 | $50,000 |
| Aug 8, 2016 | Completed final sign-off Sep 2016 | 3571 16th St | apt 3: rebuild fire damanged unit, insulate open wall cavites. repalce p-traps in bathroom and angle stops.Details
apt 3: rebuild fire damanged unit, insulate open wall cavites. repalce p-traps in bathroom and angle stops. | $5,000 |
| Aug 2, 2016 | Completed final sign-off Mar 2019 | 2575 Washington St | soft story retrofit per sfbc chapter 4d engineering criteria 2016 iebc appendix a-4Details
soft story retrofit per sfbc chapter 4d engineering criteria 2016 iebc appendix a-4 | $58,500 |
| Jun 16, 2016 | Completed final sign-off Aug 2016 | 7630 Geary Bl | unit #305: bathroom and kitchen remodel, in kind.Details
unit #305: bathroom and kitchen remodel, in kind. | $30,000 |
| Mar 17, 2016 | Completed final sign-off Jun 2016 | 48 Sumner St | addition of (n) bathroom, remodel (e) kitchen and (e) bathroom - change of layoutDetails
addition of (n) bathroom, remodel (e) kitchen and (e) bathroom - change of layout | $10,000 |
| Mar 16, 2016 | Completed final sign-off Mar 2016 | 115 Haight St | add to perviously issued permit # 201601157270, install small bathroom , window, replacing old with like in kind, 5 feet above finsihed floor, unit # 14Details
add to perviously issued permit # 201601157270, install small bathroom , window, replacing old with like in kind, 5 feet above finsihed floor, unit # 14 | $500 |
| Mar 11, 2016 | Never finaled issued Mar 2016, no final | 308 Turk St | additional work for pa# 201512034102 renovate unit #5 kitchen&bathroom upgrade electrical & plumbing,install living room window (not facing the street)t meet current code requirements.renovate bathroon in unit #3 upgrade plumbing&electrical upgrade shower pan,replace kitchen cabinets all new lightsDetails
additional work for pa# 201512034102 renovate unit #5 kitchen&bathroom upgrade electrical & plumbing,install living room window (not facing the street)t meet current code requirements.renovate bathroon in unit #3 upgrade plumbing&electrical upgrade shower pan,replace kitchen cabinets all new lights | $48,950 |
| Mar 11, 2016 | Completed final sign-off Mar 2016 | 1010 Bush St | additional work for pa# 201509046269 in units 307 & 311, trench walls in preperation for upgrade electrical ,close walls with finish in kind, install new mc light fixtures, outlets switches, heaters repalce vanity w/like in kind, (n) lights shall be ledDetails
additional work for pa# 201509046269 in units 307 & 311, trench walls in preperation for upgrade electrical ,close walls with finish in kind, install new mc light fixtures, outlets switches, heaters repalce vanity w/like in kind, (n) lights shall be led | $5,000 |
| Feb 1, 2016 | Expired or cancelled cancelled May 2016 | 42 Sumner St | remodel kitchen with like kind, upgrade electrical & plumbing. install counter top, appliances, cabinets etc. no wall modification. remodel bathroom with like kind upgrade electricalk, plumbing, new toilet, sink tile & general patch & paint throughout.Details
remodel kitchen with like kind, upgrade electrical & plumbing. install counter top, appliances, cabinets etc. no wall modification. remodel bathroom with like kind upgrade electricalk, plumbing, new toilet, sink tile & general patch & paint throughout. | $20,000 |
| Feb 1, 2016 | Completed final sign-off Feb 2017 | 7630 Geary Bl | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $40,000 |
| Jan 15, 2016 | Completed final sign-off Mar 2016 | 115 Haight St | apt 14: remodelingkitchen & bathroom with like kind. upgrade plumbig & electrical. kitchen: install new counter top, appliances, cabinets etc upgrade. bathroom: install celing exhaust fan, vanity, sink, bathtub.Details
apt 14: remodelingkitchen & bathroom with like kind. upgrade plumbig & electrical. kitchen: install new counter top, appliances, cabinets etc upgrade. bathroom: install celing exhaust fan, vanity, sink, bathtub. | $20,000 |
| Apr 3, 2015 | Completed final sign-off Jan 2017 | 7630 Geary Bl | legalization of unwarranted unit for a total of 19. unit is on the ground floor and includes (2) bed and (2) bath. per ordinance no 43-14. sprinklers under separate permit.Details
legalization of unwarranted unit for a total of 19. unit is on the ground floor and includes (2) bed and (2) bath. per ordinance no 43-14. sprinklers under separate permit. | $60,000 |