Stephen Andrews
- Listed as
- architect, engineer
- Firm
- Eag Studio
- Based in
- Sf
- On San Francisco permits
- Feb 2018 to Sep 2026
12 permits since 2000 (architect on 11 permits, engineer on 1 permit): 5 completed, 2 in progress, 5 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress issued Sep 2026 | 1501 Grove St | Wooley Landscapes | revision to 202307121975: issued to rebuild an e) play structure, remove slide from original scope of work, add guardrail where slide was, slide was never installedDetails
revision to 202307121975: issued to rebuild an e) play structure, remove slide from original scope of work, add guardrail where slide was, slide was never installed | |
| Apr 23, 2025 | In progress issued Apr 2025 | 2609 California St | bathroom remodel. enclosed laundry and utility room in garage. new sauna at ground flDetails
bathroom remodel. enclosed laundry and utility room in garage. new sauna at ground fl | $250,000 | |
| Jul 23, 2024 | Completed final sign-off Dec 2024 | 706 Mission St | Baxter Construction | revision to pa# 2023-0823-5060 provide drawings that show new partition wallsDetails
revision to pa# 2023-0823-5060 provide drawings that show new partition walls | |
| May 6, 2022 | Never finaled filed May 2022, never issued | 2569 Greenwich St | Houseworks Enterprises Inc. | demolition of (e) deck at level 2. reconstruct (n) deck at level 2. install (n) handrail at deck level 2. install new simpson ties at level 2 deck to (e) house.Details
demolition of (e) deck at level 2. reconstruct (n) deck at level 2. install (n) handrail at deck level 2. install new simpson ties at level 2 deck to (e) house. | $20,000 |
| Apr 5, 2022 | Completed final sign-off Jul 2023 | 289 San Marcos Av | Houseworks Enterprises Inc. | replace (e) wood decking w/ (n) trex decking. replace (e) wood deck rail w/ (n) steel cable rail. add light strip to top rail. less than 50%.Details
replace (e) wood decking w/ (n) trex decking. replace (e) wood deck rail w/ (n) steel cable rail. add light strip to top rail. less than 50%. | $41,000 |
| May 24, 2021 | Completed final sign-off Jun 2022 | 2740 Divisadero St | Jeff King And Company Inc | 3rd fl - (n) bathroom in master bedroom, remove and replace 2 windows in kind (not visible from st), remove wood burning fire place; in media room remove 1 window, relocate (e) gas fireplace, repair (e) flfoor, add sink. add 2 skylights to (n) bathroomDetails
3rd fl - (n) bathroom in master bedroom, remove and replace 2 windows in kind (not visible from st), remove wood burning fire place; in media room remove 1 window, relocate (e) gas fireplace, repair (e) flfoor, add sink. add 2 skylights to (n) bathroom | $32,500 |
| Jul 24, 2019 | Never finaled issued Sep 2019, no final | 4 Windsor Pl | Tombay Construction | facade remodel. replace (e) curtain panel system at front w/ operable sliding doors, guardrails, apply (n) stucco surface and architectural decorative features. replace (e) rain screen at side w/ (n) louvered rainscreenDetails
facade remodel. replace (e) curtain panel system at front w/ operable sliding doors, guardrails, apply (n) stucco surface and architectural decorative features. replace (e) rain screen at side w/ (n) louvered rainscreen | $50,000 |
| May 8, 2019 | Completed final sign-off Apr 2025 | 64 Beaver St | Citywest Construction Inc. | level 1- convert garage storage areas into conditioned space for lower unit. infill west lightwell at level 1 only. level 2- reconfigure sq footage and windows in lightwells and at rear. level 3- reconfigure interior layout to upper unit. (n) roof deck to upper unit. facade- replace windows in-kindDetails
level 1- convert garage storage areas into conditioned space for lower unit. infill west lightwell at level 1 only. level 2- reconfigure sq footage and windows in lightwells and at rear. level 3- reconfigure interior layout to upper unit. (n) roof deck to upper unit. facade- replace windows in-kind | $350,000 |
| Oct 23, 2018 | Never finaled issued Jan 2019, no final | 2320 Union St | Citywest Construction Inc. | new roof deck on level 3 and level 4. infill at lower level south lightwell. interior reconfiguration of unit1&2 on all levels new bathroom, bedroom & media room on level 1, move garage door to be recessed from front 1'-6"Details
new roof deck on level 3 and level 4. infill at lower level south lightwell. interior reconfiguration of unit1&2 on all levels new bathroom, bedroom & media room on level 1, move garage door to be recessed from front 1'-6" | $350,000 |
| Sep 26, 2018 | Completed final sign-off Aug 2020 | 435 Marina Bl | Citywest Construction Inc. | add neighboring setback to scope of work to correct app#201511061988. pull back window wall and front decks to neighboring average setbackDetails
add neighboring setback to scope of work to correct app#201511061988. pull back window wall and front decks to neighboring average setback | |
| Feb 22, 2018 | Never finaled issued Feb 2018, no final | 1849 Golden Gate Av | Pacific Construction & Design**See Notes | unit 2: replace (e) post to beam connectors made of plywood & nails with new simpson pre engineered connectors, for positive connection @ ext. deck. maher naDetails
unit 2: replace (e) post to beam connectors made of plywood & nails with new simpson pre engineered connectors, for positive connection @ ext. deck. maher na | $1,000 |
| Feb 16, 2018 | Never finaled issued Feb 2018, no final | 1849 Golden Gate Av | Pacific Construction & Design**See Notes | enclose existing patio storefront glass. patio is located under existing overhang. maher n/aDetails
enclose existing patio storefront glass. patio is located under existing overhang. maher n/a | $10,000 |