Houseworks Enterprises Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Sep 2026
- Last 24 months
- 19 permits filed
327 permits since 2000: 267 completed, 10 in progress, 29 never finaled, 21 expired or cancelled.
Of the 29 never-finaled permits, 4 are 3 to 5 years old, 7 are 5 to 10 years old, 18 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 327.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress issued Oct 2026 | 2025 Anza St | build a new bedroom closet on the side of the house, not visible from the public right of way.address leaking siding and windows on the east elevation. install saloon style doors between the kichen and dining room.Details
build a new bedroom closet on the side of the house, not visible from the public right of way.address leaking siding and windows on the east elevation. install saloon style doors between the kichen and dining room. | $5,000 |
| Aug 27, 2026 | In progress issued Aug 2026 | 1 Newburg St | revision to pa# 202607215342 - structural scope modification due to found conditions.Details
revision to pa# 202607215342 - structural scope modification due to found conditions. | |
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 3219 Rivera St | remodel of g/f to connect the downstairs space to the main house with a new hallway between the foyer and bedroom. reconfigure the existing downstairs space to accomodate a bedrooom with closet and enlarge an existing bathroom. some structural work and relocation of mep equipment required per plans.Details
remodel of g/f to connect the downstairs space to the main house with a new hallway between the foyer and bedroom. reconfigure the existing downstairs space to accomodate a bedrooom with closet and enlarge an existing bathroom. some structural work and relocation of mep equipment required per plans. | $25,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 1 Newburg St | remodel kitchen w/ all new cabinets,fixtures,finishes,electrical & appliances. kitchen to have the same footprint but with expanded openings to the living room an breakfast room. expand/remodel a bathroom with new electricl, fixtures and finishes.Details
remodel kitchen w/ all new cabinets,fixtures,finishes,electrical & appliances. kitchen to have the same footprint but with expanded openings to the living room an breakfast room. expand/remodel a bathroom with new electricl, fixtures and finishes. | $25,000 |
| May 19, 2026 | In progress issued May 2026 | 1 Newburg St | demolish the interior fixture, finishes of the kitchen, & bathroom. defer submittal for renovation permit will be submitted following the analysis of the exposed structure.Details
demolish the interior fixture, finishes of the kitchen, & bathroom. defer submittal for renovation permit will be submitted following the analysis of the exposed structure. | $2,500 |
| Apr 2, 2026 | In progress issued Apr 2026 | 131 Alhambra St | all work to restore home in kind condition as described: reconstruct storage room demising walls at gr level rear yard (ref 202009265163) rebuild section of connecting stair at breezway less than 50%, reinstall 2 furnaces (gas) and 2 hotwater heaters (gas)Details
all work to restore home in kind condition as described: reconstruct storage room demising walls at gr level rear yard (ref 202009265163) rebuild section of connecting stair at breezway less than 50%, reinstall 2 furnaces (gas) and 2 hotwater heaters (gas) | $50,000 |
| Mar 26, 2026 | In progress issued Mar 2026 | 3107 Washington St | revision pa# 202512151802 per instructions from the field inspector to revise ap for the repair of the (e) stairs. more dry rot that anticipated was discovered require more replacement. these plans reflect that request. additional since we were doing additional enginerring our clinets asked forDetails
revision pa# 202512151802 per instructions from the field inspector to revise ap for the repair of the (e) stairs. more dry rot that anticipated was discovered require more replacement. these plans reflect that request. additional since we were doing additional enginerring our clinets asked for | $5,000 |
| Dec 15, 2025 | In progress issued Dec 2025 | 3107 Washington St | replace all existing sashes only in kind with igu panels. replace glass in front door with igu. replace dryrot ext stairs to roof deck less than 50%, replace 2 panels garage due to dryrot, install new drain trench at garage door, gas & power for new direct vent fireplace in living room, paint extDetails
replace all existing sashes only in kind with igu panels. replace glass in front door with igu. replace dryrot ext stairs to roof deck less than 50%, replace 2 panels garage due to dryrot, install new drain trench at garage door, gas & power for new direct vent fireplace in living room, paint ext | $25,000 |
| Oct 8, 2025 | In progress filed Oct 2025, not yet issued | 149 Prentiss St | 2nd/f unit: replace e) double hung window w/ a larger sliding winodw at rear of bldgDetails
2nd/f unit: replace e) double hung window w/ a larger sliding winodw at rear of bldg | $2,500 |
| Oct 1, 2025 | Completed final sign-off Feb 2026 | 289 San Marcos Av | replace 8 existing sliding doors in kind. none are facing the public right of way.Details
replace 8 existing sliding doors in kind. none are facing the public right of way. | $16,000 |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 518 Church St | replace existing plumbing fixtures and finishes in main bathroom, powder room.Details
replace existing plumbing fixtures and finishes in main bathroom, powder room. | $25,000 |
| Aug 18, 2025 | Completed final sign-off Dec 2025 | 38 Sydney Wy | ground floor - interior remodel with the addition of an office/study room. enlarge existing bedroom closet. reconfigure existing laundry area and replace existing side door in the garage with a double hung window.Details
ground floor - interior remodel with the addition of an office/study room. enlarge existing bedroom closet. reconfigure existing laundry area and replace existing side door in the garage with a double hung window. | $15,000 |
| Aug 13, 2025 | Completed final sign-off Jul 2026 | 1408 Noe St | enclose existing 2nd fl balcony servicing 2 bedrooms, with the intentions to enlarge area of those bdrms by 57sf. enclosure will have 2 bump outs to comply with the sf planning guidelines and egress window per each bedroom. the wood picket guardrails on 2 flrs above will be replaced w new metalDetails
enclose existing 2nd fl balcony servicing 2 bedrooms, with the intentions to enlarge area of those bdrms by 57sf. enclosure will have 2 bump outs to comply with the sf planning guidelines and egress window per each bedroom. the wood picket guardrails on 2 flrs above will be replaced w new metal | $35,000 |
| Jun 13, 2025 | Completed final sign-off Nov 2025 | 738 Joost Av | rebuild wood deck & wood stairs in rear yard. same size as e), raise deck +/- 7". add 1-hr rated deck gaurdwalls @ side property lines where shown on plansDetails
rebuild wood deck & wood stairs in rear yard. same size as e), raise deck +/- 7". add 1-hr rated deck gaurdwalls @ side property lines where shown on plans | $25,000 |
| Apr 23, 2025 | Completed final sign-off Nov 2025 | 738 Joost Av | kitchen reno in (e) location; replace 1 rear exterior door; replace 1 rear window w/exterior door; replace 2 windows in-kind (not visible from st); replace 1 interior door w/pocket door; replace vanity & add exhaust fan in bathrm;Details
kitchen reno in (e) location; replace 1 rear exterior door; replace 1 rear window w/exterior door; replace 2 windows in-kind (not visible from st); replace 1 interior door w/pocket door; replace vanity & add exhaust fan in bathrm; | $75,000 |
| Mar 7, 2025 | Completed final sign-off Jun 2025 | 24 Costa St | renovations to include a new tub in the primary bathroom; removal of existing wll between 2nd floor bedroom and den; modification to existing storage loft accessDetails
renovations to include a new tub in the primary bathroom; removal of existing wll between 2nd floor bedroom and den; modification to existing storage loft access | $20,000 |
| Feb 20, 2025 | Completed final sign-off Aug 2025 | 666 Rockdale Dr | remodeling/expanision of the kitchen in the (e) location. adjacent interior walls to be removed/opened up. addition of (n) skylight. (e) kitchen window, not facing street, to be replaced in kind. no change to building envelope or square footage.Details
remodeling/expanision of the kitchen in the (e) location. adjacent interior walls to be removed/opened up. addition of (n) skylight. (e) kitchen window, not facing street, to be replaced in kind. no change to building envelope or square footage. | $75,000 |
| Dec 13, 2024 | Completed final sign-off Dec 2025 | 2627 Turk Bl | enclosure of a center atrium space and incorporation of that space into a kitchen renovation. remodel 3 bathrooms, relocation of laundry w/d. replacement of 4 street facing windows in kind. replacement of 10 rear facing windows in kind. replacement of 3 (e) skylights. add 2 skylights in kitchenDetails
enclosure of a center atrium space and incorporation of that space into a kitchen renovation. remodel 3 bathrooms, relocation of laundry w/d. replacement of 4 street facing windows in kind. replacement of 10 rear facing windows in kind. replacement of 3 (e) skylights. add 2 skylights in kitchen | $100,000 |
| Oct 21, 2024 | In progress filed Oct 2024, not yet issued | 326 Lexington St | field revisions to permit 202308285370. new non-structural interior modification, and new structural blocking.Details
field revisions to permit 202308285370. new non-structural interior modification, and new structural blocking. | $40,000 |
| Sep 13, 2024 | Completed final sign-off May 2025 | 328 Lexington St | revision to pa # 202308285370: remove a 3' non-load bearing wall between a powder room and closet and infill the closet door in order to incorporate the closet space into the powder room.Details
revision to pa # 202308285370: remove a 3' non-load bearing wall between a powder room and closet and infill the closet door in order to incorporate the closet space into the powder room. | $600 |
| Aug 30, 2024 | Expired or cancelled cancelled Nov 2025 | 2543 Diamond St | replace 11 original aluminum windows w/new marvin ultimate alum. clad wood windows.8 windows face the public right of way and 3 windows face the rear yard. all to be replaced in kind w/ the exception of 1 street facing window to have sill raise roughly 10" to align with all the other windows inkindDetails
replace 11 original aluminum windows w/new marvin ultimate alum. clad wood windows.8 windows face the public right of way and 3 windows face the rear yard. all to be replaced in kind w/ the exception of 1 street facing window to have sill raise roughly 10" to align with all the other windows inkind | $12,000 |
| Jun 4, 2024 | Completed final sign-off Feb 2025 | 565 Arkansas St | revision to pa# 2023-0629-1174 add new fixed skylight (u-factor .48) at proposed kitchen. replace (e) security bar of one window with (n) egress compliant security barDetails
revision to pa# 2023-0629-1174 add new fixed skylight (u-factor .48) at proposed kitchen. replace (e) security bar of one window with (n) egress compliant security bar | $1,000 |
| May 2, 2024 | Completed final sign-off Sep 2024 | 1463 Hayes St | remodel one kitchen in kind. no floor plan changes or structural work. update plmg and elec. per code. add 6 led recessed lights. replace rear yard facing door and window in kind. same style and size.Details
remodel one kitchen in kind. no floor plan changes or structural work. update plmg and elec. per code. add 6 led recessed lights. replace rear yard facing door and window in kind. same style and size. | $20,000 |
| Apr 18, 2024 | Completed final sign-off Nov 2024 | 900 Carolina St | work on the 3rd level. repair existing deck at front of the house. remove and reinstall door & door pan. remove and reinstall tile. replace deck membraneDetails
work on the 3rd level. repair existing deck at front of the house. remove and reinstall door & door pan. remove and reinstall tile. replace deck membrane | $5,000 |
| Dec 28, 2023 | Completed final sign-off Mar 2025 | 565 Arkansas St | revision to pa#202306291174. add owner supplied prefab swim spa with decking around it. provide power and drainage & relocate door at the extg mancave/proposed spa room at rear of the house. enlarge width & height of the door to deck on level 2. change type/size of 4 non street-facing windows.Details
revision to pa#202306291174. add owner supplied prefab swim spa with decking around it. provide power and drainage & relocate door at the extg mancave/proposed spa room at rear of the house. enlarge width & height of the door to deck on level 2. change type/size of 4 non street-facing windows. | |
| Aug 28, 2023 | Completed final sign-off May 2025 | 326 Lexington St | residential interior improvements-bathroom remodel, new cabinets, new finish flooring. no exterior work.Details
residential interior improvements-bathroom remodel, new cabinets, new finish flooring. no exterior work. | $100,000 |
| Aug 23, 2023 | Completed final sign-off Feb 2024 | 47 Inverness Dr | kitchen remodel with capture of additional fl space from closet in the adj rm & center atrium (new r13 insul in the new walls & r19 in the new ceiling). convert fireplace from wood burning to electric (fireplace to receive ul listed elec insert). replace windows with in-kind: (3) street facing,Details
kitchen remodel with capture of additional fl space from closet in the adj rm & center atrium (new r13 insul in the new walls & r19 in the new ceiling). convert fireplace from wood burning to electric (fireplace to receive ul listed elec insert). replace windows with in-kind: (3) street facing, | $25,000 |
| Jul 17, 2023 | Completed final sign-off Feb 2024 | 2177 09th Av | full primary bathroom and guest bathroom remodel. install new exhaust fan in both bathroomsDetails
full primary bathroom and guest bathroom remodel. install new exhaust fan in both bathrooms | $50,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2025 | 565 Arkansas St | interior remodel of 2 story sfr to convert 3 bedroom 2 bath to a 4 bedroom 3 bath home inclding full foundation replacement at the front of the house. new door and window at the side and the rear of the house and kitchen remodel. all work to be done under (e) bldg envelope.Details
interior remodel of 2 story sfr to convert 3 bedroom 2 bath to a 4 bedroom 3 bath home inclding full foundation replacement at the front of the house. new door and window at the side and the rear of the house and kitchen remodel. all work to be done under (e) bldg envelope. | $250,000 |
| Jun 29, 2023 | Completed final sign-off Aug 2023 | 1040 Chenery St | replace a leaking 19"w x 35"h casement window facing elk street with in kind aluminum clad wood. max u-factor 0.30.Details
replace a leaking 19"w x 35"h casement window facing elk street with in kind aluminum clad wood. max u-factor 0.30. | $500 |
| Jun 29, 2023 | Completed final sign-off Aug 2023 | 354 Moultrie St | repair/replace siding in-kind with new wood siding along south wall of building. not street facing. wood siding.Details
repair/replace siding in-kind with new wood siding along south wall of building. not street facing. wood siding. | $5,000 |
| Jun 8, 2023 | Completed final sign-off Dec 2023 | 2 Edgehill Wy | remodel (e) bathroom on the second floor. replace finishes and fixtures with in kind.Details
remodel (e) bathroom on the second floor. replace finishes and fixtures with in kind. | $25,000 |
| May 23, 2023 | Expired or cancelled cancelled Jan 2026 | 3035 22nd Av | revisions to previously approved permit 202206166516. add new fixed skylight installed within the existing roof framing.Details
revisions to previously approved permit 202206166516. add new fixed skylight installed within the existing roof framing. | $5,000 |
| May 18, 2023 | Completed final sign-off Jun 2023 | 3035 22nd Av | revision to bpa#202206166516, add new fixed skylight installed w/in (e) roof framing, new parapet adjcent to skylight.Details
revision to bpa#202206166516, add new fixed skylight installed w/in (e) roof framing, new parapet adjcent to skylight. | $5,000 |
| May 18, 2023 | Completed final sign-off Apr 2024 | 51 28th St | revision to pa# 202303274449. front entrance will have 1 riser instead of 2. tradesman alley door will have 2 risers instead of 4. garage entrance will no longer have a riser. stairwell door will have 2 risers instead of 1.Details
revision to pa# 202303274449. front entrance will have 1 riser instead of 2. tradesman alley door will have 2 risers instead of 4. garage entrance will no longer have a riser. stairwell door will have 2 risers instead of 1. | |
| May 1, 2023 | Expired or cancelled cancelled Nov 2024 | 1640 Hayes St | add a new dormer over the footprint of e closet to match the look of adjacent dormer. relocate he mep and sprinkler head as required and change e existing door to blind dorrDetails
add a new dormer over the footprint of e closet to match the look of adjacent dormer. relocate he mep and sprinkler head as required and change e existing door to blind dorr | $5,000 |
| Apr 4, 2023 | Completed final sign-off Jul 2023 | 35 Sunview Dr | revision to pa# 202208261391, remove the existing wood trim, panels and planter on the front facade and replace trim w/new trim to match existing, install new stucco across the entire front elevation, horizontal band details to remain, replace the garage door in-kind.Details
revision to pa# 202208261391, remove the existing wood trim, panels and planter on the front facade and replace trim w/new trim to match existing, install new stucco across the entire front elevation, horizontal band details to remain, replace the garage door in-kind. | $10,000 |
| Mar 27, 2023 | Expired or cancelled cancelled Jan 2026 | 3035 22nd Av | rev to pa# 202206166516, add 1 new skylightDetails
rev to pa# 202206166516, add 1 new skylight | $10,000 |
| Mar 27, 2023 | Completed final sign-off Apr 2024 | 51 28th St | rev to pa# 202212229013, lvl1-furr out all exterior walls to cover the visible exposed foundation at the interior except garage where the foundation will be exposed. lvl2-omit removal of all interior walls except the wall btw the existing kitchen & existing office and wall btw kitchen and closet.Details
rev to pa# 202212229013, lvl1-furr out all exterior walls to cover the visible exposed foundation at the interior except garage where the foundation will be exposed. lvl2-omit removal of all interior walls except the wall btw the existing kitchen & existing office and wall btw kitchen and closet. | $5,000 |
| Mar 14, 2023 | Completed final sign-off Apr 2024 | 243 Caselli Av | replace 7 exterior french door with in kind french doors. convert two exterior french door to fixed windows (to match existing door style), and replace two single exterior door with in kind. all 9 doors and 2 windows will be metal clad wood (previously wood clad). windows replacing door to be temperDetails
replace 7 exterior french door with in kind french doors. convert two exterior french door to fixed windows (to match existing door style), and replace two single exterior door with in kind. all 9 doors and 2 windows will be metal clad wood (previously wood clad). windows replacing door to be temper | $10,000 |
| Mar 3, 2023 | Completed final sign-off Jul 2023 | 35 Sunview Dr | revision to pa#202208261391. replace kitchen countertop, faucet, backsplash, and stove. new outlet (electrical and trade permits by others). replace door between foyer and garage with new 20 minute rated door. replace door to side yard from garage. replace drywall approx 50 sf at interior stairwell.Details
revision to pa#202208261391. replace kitchen countertop, faucet, backsplash, and stove. new outlet (electrical and trade permits by others). replace door between foyer and garage with new 20 minute rated door. replace door to side yard from garage. replace drywall approx 50 sf at interior stairwell. | $15,000 |
| Jan 24, 2023 | Completed final sign-off Jun 2023 | 1427 Fulton St | remodel (e) kitchen, demo (e) door to breakfast room and repalce (3) windows and (1) door with in-kind in the kitchen and the breakfast area.Details
remodel (e) kitchen, demo (e) door to breakfast room and repalce (3) windows and (1) door with in-kind in the kitchen and the breakfast area. | $50,000 |
| Dec 22, 2022 | Completed final sign-off Apr 2024 | 51 28th St | 1)revision bpa#200607075941 & 202210144414. 2)renovation of extg garage on 1st lvl to add nw master bedrm, guest bedrm, nw office, nw bathroom & nw laundry rm. 3)demo extg stair to the rear yard & provide nw enclosed stair connecting lvl 1 & lvl 2 within envelope of the previously approvedDetails
1)revision bpa#200607075941 & 202210144414. 2)renovation of extg garage on 1st lvl to add nw master bedrm, guest bedrm, nw office, nw bathroom & nw laundry rm. 3)demo extg stair to the rear yard & provide nw enclosed stair connecting lvl 1 & lvl 2 within envelope of the previously approved | $150,000 |
| Nov 14, 2022 | Completed final sign-off Nov 2022 | 118 Brewster St | rev to pa# 202108186616 the closet is to be on the left side of the bathroom instead of the right side of the bathroomDetails
rev to pa# 202108186616 the closet is to be on the left side of the bathroom instead of the right side of the bathroom | $71,000 |
| Oct 14, 2022 | Completed final sign-off Apr 2024 | 51 28th St | recommencement and completion of work approved under pa# 200607075941.Details
recommencement and completion of work approved under pa# 200607075941. | $40,000 |
| Oct 11, 2022 | Expired or cancelled cancelled Jan 2026 | 170 King St | in kind kitchen and two bathrooms remodel. replacement of cabinets, finishes, fixtures with in kind like materials. no structural work or removal of walls. no change in openings.Details
in kind kitchen and two bathrooms remodel. replacement of cabinets, finishes, fixtures with in kind like materials. no structural work or removal of walls. no change in openings. | $110,000 |
| Sep 26, 2022 | Completed final sign-off Mar 2023 | 360 Steiner St | removal and replacement of concrete garage floor high point which prevent cars from entering the garage replacement of a skylight and addition of two solar tubesDetails
removal and replacement of concrete garage floor high point which prevent cars from entering the garage replacement of a skylight and addition of two solar tubes | $10,000 |
| Aug 26, 2022 | Completed final sign-off Aug 2023 | 35 Sunview Dr | replace 6 windows in kind. new windows (pella impervia fiberglass) to have same function and will use the same rough opening (3) units face public right of way.Details
replace 6 windows in kind. new windows (pella impervia fiberglass) to have same function and will use the same rough opening (3) units face public right of way. | $10,000 |
| Aug 10, 2022 | Never finaled issued Sep 2023, no final | 1420 Hudson Av | rear horizontal additions to the two exisitng floors & rear vertical addition to add a basement level.the additions include roof decks @ the two (e) floors.minor changes to the front facade to remove pebbles and replace the grage door.no change to use or height.Details
rear horizontal additions to the two exisitng floors & rear vertical addition to add a basement level.the additions include roof decks @ the two (e) floors.minor changes to the front facade to remove pebbles and replace the grage door.no change to use or height. | $250,000 |
| Aug 1, 2022 | Completed final sign-off Jan 2023 | 1040 Chenery St | remodel (e) powder room in the garage and move the doorway to the (e) powder from garage to (e) office. install new ceiling lights in the office, new insulatoin and drywall in the office and new sheetrock in the garage.Details
remodel (e) powder room in the garage and move the doorway to the (e) powder from garage to (e) office. install new ceiling lights in the office, new insulatoin and drywall in the office and new sheetrock in the garage. | $25,000 |
| Jul 8, 2022 | Completed final sign-off Jun 2023 | 3035 22nd Av | reconfigure int walls and 1 year yard facing ext wdw and 1 door opening.demo (e) stair serving door to rear yard that is being removed and install (n) 42in high guardrail w/ 1in rails that are no more than 4in apart at the ext side of (n) in-swing french doors that are being installed.1 solar tubeDetails
reconfigure int walls and 1 year yard facing ext wdw and 1 door opening.demo (e) stair serving door to rear yard that is being removed and install (n) 42in high guardrail w/ 1in rails that are no more than 4in apart at the ext side of (n) in-swing french doors that are being installed.1 solar tube | $10,000 |
| Jun 16, 2022 | Completed final sign-off Jun 2023 | 3035 22nd Av | replace kitchen, primary bathroom, and guest bathroom in kind. new cabinets, counter, flooring, plumbing fixtures.Details
replace kitchen, primary bathroom, and guest bathroom in kind. new cabinets, counter, flooring, plumbing fixtures. | $50,000 |
| May 6, 2022 | Never finaled filed May 2022, never issued | 2569 Greenwich St | demolition of (e) deck at level 2. reconstruct (n) deck at level 2. install (n) handrail at deck level 2. install new simpson ties at level 2 deck to (e) house.Details
demolition of (e) deck at level 2. reconstruct (n) deck at level 2. install (n) handrail at deck level 2. install new simpson ties at level 2 deck to (e) house. | $20,000 |
| Apr 21, 2022 | Completed final sign-off Nov 2022 | 118 Brewster St | replace 1 non-street visible sliding door at (e) bedroom & 1 non-street visible sliding window at (e) bedroom with double glazed marvin clad or equivalent single door & sliding windows.Details
replace 1 non-street visible sliding door at (e) bedroom & 1 non-street visible sliding window at (e) bedroom with double glazed marvin clad or equivalent single door & sliding windows. | $5,000 |
| Apr 5, 2022 | Completed final sign-off Jul 2023 | 289 San Marcos Av | replace (e) wood decking w/ (n) trex decking. replace (e) wood deck rail w/ (n) steel cable rail. add light strip to top rail. less than 50%.Details
replace (e) wood decking w/ (n) trex decking. replace (e) wood deck rail w/ (n) steel cable rail. add light strip to top rail. less than 50%. | $41,000 |
| Mar 28, 2022 | Expired or cancelled cancelled Jan 2026 | 53 Miramar Av | removal of low stucco wall, portions of an iron fence, hard and soft scaping in the front yard as well as the sidewalk and curb in order to create a concrete parking area with planting the front yard. street trees to be installed/planted. new curb cut application under 202109027732.Details
removal of low stucco wall, portions of an iron fence, hard and soft scaping in the front yard as well as the sidewalk and curb in order to create a concrete parking area with planting the front yard. street trees to be installed/planted. new curb cut application under 202109027732. | $15,000 |
| Mar 22, 2022 | Never finaled issued Mar 2022, no final | 3035 22nd Av | replace 9 windows, wood/aluminumn clad material, front facadeDetails
replace 9 windows, wood/aluminumn clad material, front facade | $5,000 |
| Mar 14, 2022 | Never finaled issued Mar 2022, no final | 90 Wawona St | minor changes to 1st fl foyer closet to reduce width. change door & add seating. minor changes to 2nd fl family room closet to remove a wetbar. widen closet, & change swinging door into pocket door. add a door to (e) opening between 2nd fl primary bedroom & bathroom.Details
minor changes to 1st fl foyer closet to reduce width. change door & add seating. minor changes to 2nd fl family room closet to remove a wetbar. widen closet, & change swinging door into pocket door. add a door to (e) opening between 2nd fl primary bedroom & bathroom. | $5,000 |
| Mar 10, 2022 | Completed final sign-off Nov 2022 | 118 Brewster St | construct a new post and beam wood balcony on the north side of the home with access from the third floor.Details
construct a new post and beam wood balcony on the north side of the home with access from the third floor. | $5,000 |
| Feb 28, 2022 | Completed final sign-off Jul 2022 | 90 Wawona St | replacement in kind of 8, non street/public right of way facing windows. no change to location, size or operation. new windows to be insulated glass units. removal of drywall as required in the same room in order to add r-19 insulation to the walls and r-30 to the ceilings. topfloor room receivingDetails
replacement in kind of 8, non street/public right of way facing windows. no change to location, size or operation. new windows to be insulated glass units. removal of drywall as required in the same room in order to add r-19 insulation to the walls and r-30 to the ceilings. topfloor room receiving | $20,000 |
| Jan 28, 2022 | Completed final sign-off Mar 2023 | 360 Steiner St | scope of work: replace all existing ground and upper floor windows with new windows; relocate two street facing upper floor windows, in-fill one upper floor window facing page st. convert rear yard facing upper fl. bedroom windows to be egress compliant, replace the existing window...Details
scope of work: replace all existing ground and upper floor windows with new windows; relocate two street facing upper floor windows, in-fill one upper floor window facing page st. convert rear yard facing upper fl. bedroom windows to be egress compliant, replace the existing window... | $35,000 |
| Dec 15, 2021 | Completed final sign-off Mar 2023 | 360 Steiner St | in kind interior remodel of kitchen, bathrooms, no wall removal and alterationDetails
in kind interior remodel of kitchen, bathrooms, no wall removal and alteration | $10,000 |
| Nov 3, 2021 | Completed final sign-off Apr 2022 | 2642 40th Av | add an en-suite bathroom and closet to an (e) bedroom and replace the window with a new emergency egress compliant bay windowDetails
add an en-suite bathroom and closet to an (e) bedroom and replace the window with a new emergency egress compliant bay window | $30,000 |
| Aug 18, 2021 | Completed final sign-off Nov 2022 | 118 Brewster St | remodel (e) master bath, hall bath & powder room. convert (e) storage room into bedroom with en-suite bathroom.Details
remodel (e) master bath, hall bath & powder room. convert (e) storage room into bedroom with en-suite bathroom. | $60,000 |
| Apr 13, 2021 | Never finaled issued Apr 2021, no final | 170 King St | unit #201: kitchen and 2 bathrooms remodel in kind. replace cabinets, finishes, fixtures. no structural work or wall removal/openings.Details
unit #201: kitchen and 2 bathrooms remodel in kind. replace cabinets, finishes, fixtures. no structural work or wall removal/openings. | $110,000 |
| Apr 13, 2021 | Completed final sign-off Mar 2022 | 1118 Church St | unit #3: kitchen remodel in kind. replace cabinets, finishes, fixtures. no structural work or wall removal/openings.Details
unit #3: kitchen remodel in kind. replace cabinets, finishes, fixtures. no structural work or wall removal/openings. | $60,000 |
| Mar 31, 2021 | Completed final sign-off Oct 2021 | 77 Carmelita St | perform emergecy repairs and exteriror restoration due to fire damage including replace damaged exterior siding, stucco, and trim, and replace (3) doors with new like and kind material to match (e) no structural scopeDetails
perform emergecy repairs and exteriror restoration due to fire damage including replace damaged exterior siding, stucco, and trim, and replace (3) doors with new like and kind material to match (e) no structural scope | $100,000 |
| Mar 31, 2021 | Completed final sign-off Oct 2021 | 77 Carmelita St | replace (7) windows with like materials to match (e), fire repair and restoration work, materials to be wood and mach hung/operation type, siding to match (e)Details
replace (7) windows with like materials to match (e), fire repair and restoration work, materials to be wood and mach hung/operation type, siding to match (e) | $3,500 |
| Mar 17, 2021 | Completed final sign-off Feb 2023 | 2272 17th Av | expand kitchen & breakfast room into (e) lightwell at 2nd fl & remodel. remodel half bath & full bath. replace windows in kind with double glazed custom wood windows or marvin clad exterior + wood interior windows.Details
expand kitchen & breakfast room into (e) lightwell at 2nd fl & remodel. remodel half bath & full bath. replace windows in kind with double glazed custom wood windows or marvin clad exterior + wood interior windows. | $200,000 |
| Mar 1, 2021 | Never finaled issued Mar 2021, no final | 1696 09th Av | in kind bathroom remodel: the remodel of (2) existing (e) bathrooms. replacement of cabinets, finishes, fixtures with in-kind like materials; no removal of wallsDetails
in kind bathroom remodel: the remodel of (2) existing (e) bathrooms. replacement of cabinets, finishes, fixtures with in-kind like materials; no removal of walls | $60,000 |
| Mar 1, 2021 | Completed final sign-off Aug 2021 | 1112 Fulton St | in kind kitchen remodel. remodel of (e) existing kitchen. replace cabinets, finishes, fixtures with in-kind like materials: no removal of wallsDetails
in kind kitchen remodel. remodel of (e) existing kitchen. replace cabinets, finishes, fixtures with in-kind like materials: no removal of walls | $50,000 |
| Dec 21, 2020 | Completed final sign-off Jul 2021 | 743 04th Av | add new office & new bathroom at ground floor only. ref pa# 202005127422.Details
add new office & new bathroom at ground floor only. ref pa# 202005127422. | |
| Nov 3, 2020 | Completed final sign-off Jun 2021 | 21 Nahua Av | renovate (e) den at ground fl. add (n) bathroom within existing building envelope at ground fl. replace (e) garage door with 20-min fire rated door.Details
renovate (e) den at ground fl. add (n) bathroom within existing building envelope at ground fl. replace (e) garage door with 20-min fire rated door. | $50,000 |
| Sep 24, 2020 | Never finaled issued Oct 2020, no final | 1925 Anza St | rev to pa201911227986: (e) skylight in (e) floor plan to remain in scope of work.Details
rev to pa201911227986: (e) skylight in (e) floor plan to remain in scope of work. | |
| Sep 1, 2020 | Completed final sign-off May 2021 | 469 Yale St | in-kind kitchen remodel - remodel of (e) kitchen replace cabinets, finishes and fixtures with in-kind like materialsDetails
in-kind kitchen remodel - remodel of (e) kitchen replace cabinets, finishes and fixtures with in-kind like materials | $35,000 |
| Jul 9, 2020 | Completed final sign-off Jul 2020 | 428 Gold Mine Dr | dry rot repair at garage, replacing dry rotted framing members with new. same size and type as existing.replacing dry rotted framing members with new. same size and type as existing.Details
dry rot repair at garage, replacing dry rotted framing members with new. same size and type as existing.replacing dry rotted framing members with new. same size and type as existing. | $2,000 |
| May 21, 2020 | Never finaled issued Aug 2020, no final | 1237 27th Av | widening and reconfiguring of existing interior stair from basement level to first floor.Details
widening and reconfiguring of existing interior stair from basement level to first floor. | $15,000 |
| May 12, 2020 | Completed final sign-off Jul 2021 | 743 04th Av | perform emergency repairs due to fire to remove hazardous materials that pose a health risk. including: exterior siding & windows damaged by fire and smoke; interior wall, floor, ceiling & finishes to expose damaged framing. shore where necessary. treat smoke, fire & water damaged structureDetails
perform emergency repairs due to fire to remove hazardous materials that pose a health risk. including: exterior siding & windows damaged by fire and smoke; interior wall, floor, ceiling & finishes to expose damaged framing. shore where necessary. treat smoke, fire & water damaged structure | $30,000 |
| May 12, 2020 | Completed final sign-off Feb 2021 | 354 Moultrie St | remodeling of (e) kitchen, enclose portion of light well at 2/f to enlarge and convert (e) 1/2 bathroom to full bathroom, convert breakfast room and study into office.Details
remodeling of (e) kitchen, enclose portion of light well at 2/f to enlarge and convert (e) 1/2 bathroom to full bathroom, convert breakfast room and study into office. | $75,000 |
| Mar 12, 2020 | Completed final sign-off Aug 2020 | 483 Molimo Dr | ref to pa201910245544: dry rot interior repair of 10lf of partitian wall & put trim in window openings to fit smaller window. infill 1 interior rear door. not visable from street.Details
ref to pa201910245544: dry rot interior repair of 10lf of partitian wall & put trim in window openings to fit smaller window. infill 1 interior rear door. not visable from street. | $2,500 |
| Feb 19, 2020 | Completed final sign-off May 2020 | 401 Euclid Av | flood damage repair. replace finish & fixtures in kind.Details
flood damage repair. replace finish & fixtures in kind. | $15,000 |
| Nov 22, 2019 | Never finaled issued Aug 2020, no final | 1925 Anza St | replace (e) rear flat roof w/ sloped roof to closely match original roof. reroof (n) sloped roof w/ comp shingles to closely match (e). replace (e) gutters w/ aluminum seamless gutters ties into (e) drain pipes.Details
replace (e) rear flat roof w/ sloped roof to closely match original roof. reroof (n) sloped roof w/ comp shingles to closely match (e). replace (e) gutters w/ aluminum seamless gutters ties into (e) drain pipes. | $25,000 |
| Nov 5, 2019 | Completed final sign-off Jan 2021 | 51 Massasoit St | revision to pa#201906123170 to add stucco at west wall, currently siding not visible from street. approximately 500 sq. ft.Details
revision to pa#201906123170 to add stucco at west wall, currently siding not visible from street. approximately 500 sq. ft. | $2,500 |
| Oct 31, 2019 | Completed final sign-off Mar 2020 | 289 San Marcos Av | revision to pa#201910245547: change floor joist framing direction/design to avoid interference w/(e) concrete wallDetails
revision to pa#201910245547: change floor joist framing direction/design to avoid interference w/(e) concrete wall | |
| Oct 25, 2019 | Completed final sign-off Jul 2020 | 760 Darien Wy | revision to 2019-0619-3861 structural work due to substandard condidionsDetails
revision to 2019-0619-3861 structural work due to substandard condidions | |
| Oct 24, 2019 | Never finaled issued Oct 2019, no final | 289 San Marcos Av | create new opening to adjoin 2 rooms in lower level of home. add stairs to accomodate height change in floors. new utility roomDetails
create new opening to adjoin 2 rooms in lower level of home. add stairs to accomodate height change in floors. new utility room | $15,000 |
| Oct 24, 2019 | Completed final sign-off Aug 2020 | 483 Molimo Dr | replace 9 windows w/ new of like kind (marvin ultimate clad) at front and back of house. replace in-kind, alum wood clad. remodel and kitchen and powder room at main level and bathroom at 2nd level. new finishes and fixtures of like kind to existing.Details
replace 9 windows w/ new of like kind (marvin ultimate clad) at front and back of house. replace in-kind, alum wood clad. remodel and kitchen and powder room at main level and bathroom at 2nd level. new finishes and fixtures of like kind to existing. | $35,000 |
| Sep 13, 2019 | Completed final sign-off Dec 2019 | 71 Garcia Av | install new rear patio door - replace (e), like for like. make repairs to water damage at ceiling. relocate laundry from ground floor to 2nd floor bathroom closetDetails
install new rear patio door - replace (e), like for like. make repairs to water damage at ceiling. relocate laundry from ground floor to 2nd floor bathroom closet | $15,000 |
| Jun 19, 2019 | Completed final sign-off Jul 2020 | 760 Darien Wy | remodel master bedroom, bathroom and closet @ 1st level. replace 1 rear door and window, same size & configuration. perform voluntary seismic upgrade @ ground levelDetails
remodel master bedroom, bathroom and closet @ 1st level. replace 1 rear door and window, same size & configuration. perform voluntary seismic upgrade @ ground level | $50,000 |
| Jun 12, 2019 | Completed final sign-off Jun 2020 | 51 Massasoit St | dry rot repair- replace siding at west wall of property. work not visible from street.Details
dry rot repair- replace siding at west wall of property. work not visible from street. | $5,000 |
| Jun 12, 2019 | Completed final sign-off Oct 2019 | 3236 Broderick St | remodel 2 bathrooms at 1st floor. replace all finishes and fixtures in kind.Details
remodel 2 bathrooms at 1st floor. replace all finishes and fixtures in kind. | $15,000 |
| Jun 12, 2019 | Completed final sign-off Nov 2019 | 20 Agnon Av | remodel 1 bathrooms at 1st floor. replace all finishes and fixtures in kind.Details
remodel 1 bathrooms at 1st floor. replace all finishes and fixtures in kind. | $10,000 |
| Apr 24, 2019 | Completed final sign-off Oct 2019 | 3720 Broderick St | kitchen remodel- replace cabinets, countertop, sheetrock and lighting in kind. like for like.Details
kitchen remodel- replace cabinets, countertop, sheetrock and lighting in kind. like for like. | $10,000 |
| Mar 15, 2019 | Completed final sign-off Sep 2019 | 655 Hampshire St | remodel kitchen & bathroom. replce finishes & fixtures in-kind.Details
remodel kitchen & bathroom. replce finishes & fixtures in-kind. | $35,000 |
| Mar 8, 2019 | Never finaled issued Mar 2019, no final | 2569 Greenwich St | frech door replacement onto deck at master bedroom to deck.Details
frech door replacement onto deck at master bedroom to deck. | $3,000 |
| Sep 4, 2018 | Completed final sign-off Aug 2019 | 174 Staples Av | remodel 2nd level bathroom-replace finishes and fixtures in like kind. renovate lower level - convert storage into 2 bedrooms, laundry, bath, relocate connecting stairDetails
remodel 2nd level bathroom-replace finishes and fixtures in like kind. renovate lower level - convert storage into 2 bedrooms, laundry, bath, relocate connecting stair | $150,000 |
| Jul 18, 2018 | Completed final sign-off Jun 2020 | 428 Gold Mine Dr | modify pa 2018-0425-7398 to include: dry rot repair and structural reinforcement to rear 1st story and spa deck. add bathtub to ground level bathroom, convert family room to bedroom. relocate fireplace at 1st fl. voluntary seismic improvements & replacement of non street facing windowDetails
modify pa 2018-0425-7398 to include: dry rot repair and structural reinforcement to rear 1st story and spa deck. add bathtub to ground level bathroom, convert family room to bedroom. relocate fireplace at 1st fl. voluntary seismic improvements & replacement of non street facing window | $15,000 |
| Jun 1, 2018 | Completed final sign-off Mar 2021 | 29 Oakwood St | interior apartments. add lights and switches at 2 bedrooms, office, living room. replace fireplace surround. add built -ins at office closet and desk. replace ddoor to office.Details
interior apartments. add lights and switches at 2 bedrooms, office, living room. replace fireplace surround. add built -ins at office closet and desk. replace ddoor to office. | $5,000 |
| Apr 25, 2018 | Completed final sign-off Jun 2020 | 428 Gold Mine Dr | bathroom & kitchen remodel. replace all finishes & fixtures in-kind. new floors & wall finishes. no structural work or walls removed.Details
bathroom & kitchen remodel. replace all finishes & fixtures in-kind. new floors & wall finishes. no structural work or walls removed. | $38,837 |
| Jan 3, 2018 | Completed final sign-off Aug 2018 | 134 Alhambra St | interior improvements - new vanity, new tile at entry. new kitchen counters & backsplash. no change of (e) layout. maher n/a.Details
interior improvements - new vanity, new tile at entry. new kitchen counters & backsplash. no change of (e) layout. maher n/a. | $15,000 |