Shaun David Landman
- Listed as
- engineer
- On San Francisco permits
- Jul 2015 to Feb 2025
5 permits since 2000 (engineer on 5 permits): 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 27, 2025 | Completed final sign-off Dec 2025 | 2 Lake St | Plant Construction Co, Lp | installation of exterior building lighting at the temple house facade on lake st & the sanctuary facade facing the interior courtyardDetails
installation of exterior building lighting at the temple house facade on lake st & the sanctuary facade facing the interior courtyard | $15,000 |
| Aug 13, 2024 | Expired or cancelled withdrawn Sep 2024 | 2 Lake St | Plant Construction Co, Lp | revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes.Details
revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes. | |
| Apr 17, 2019 | Completed final sign-off Jan 2020 | 222 02nd St | Dome Construction Corp | 23/f: full floor ti w/new partitions, ceiling, finishes, millwork, furniture, lighting, plumbing, mech, & elec including employee cafeteria w/limited prep/mostly pre-packaged food, some prep such as loose dry goods, packaged good and/or expanded beverage services (drinks & espresso). maher naDetails
23/f: full floor ti w/new partitions, ceiling, finishes, millwork, furniture, lighting, plumbing, mech, & elec including employee cafeteria w/limited prep/mostly pre-packaged food, some prep such as loose dry goods, packaged good and/or expanded beverage services (drinks & espresso). maher na | $1,500,000 |
| Apr 17, 2019 | Completed final sign-off Jan 2020 | 222 02nd St | Dome Construction Corp | 25/f: full floor ti w/new partitions, ceilings, finishes, illwork, furniture, lighting, plumbing, mechanical, electrical including employee cafeteria w/ltd prep (mostly prepackaged food, some prep as some loosedry goods, prepackaged goods and/or beverage service-espresso)Details
25/f: full floor ti w/new partitions, ceilings, finishes, illwork, furniture, lighting, plumbing, mechanical, electrical including employee cafeteria w/ltd prep (mostly prepackaged food, some prep as some loosedry goods, prepackaged goods and/or beverage service-espresso) | $1,500,000 |
| Jul 28, 2015 | Completed final sign-off Mar 2016 | 100 California St | Principal Builders Inc. | 4th & 8th floor- mechanical title 24 to upgrade equipment & fixtures. refer to t.i. #2015.0615.8990 (4th flr) & 2015.0615.8994 (8th flr) for ti work. n/a maher ordinanceDetails
4th & 8th floor- mechanical title 24 to upgrade equipment & fixtures. refer to t.i. #2015.0615.8990 (4th flr) & 2015.0615.8994 (8th flr) for ti work. n/a maher ordinance | $544,800 |