12 permits since 2000 (engineer on 11 permits, architect on 2 permits): 5 completed, 3 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 29, 2026 | In progress issued Jul 2026 | 2428 Union St | Brendan Lalor Construction | revise pa# 202506239264 to document the widening of the previously approved roof deck, layout of various rooms on floors 1 & 2, addition of a sauna room to the ground floor habitable space, and structural framing to accomodate those revisions.Details
revise pa# 202506239264 to document the widening of the previously approved roof deck, layout of various rooms on floors 1 & 2, addition of a sauna room to the ground floor habitable space, and structural framing to accomodate those revisions. | $55,000 |
| Feb 2, 2026 | Completed final sign-off Aug 2026 | 2480 Fulton St | Trejo Construction | unit 4: to remove and replace existing kitchen and existing laundry which was present at the time of purchase in order to reinforce the existing 2 structural studs which were cut as per the structural drawings / notes. (to comply with complaint 202545915)Details
unit 4: to remove and replace existing kitchen and existing laundry which was present at the time of purchase in order to reinforce the existing 2 structural studs which were cut as per the structural drawings / notes. (to comply with complaint 202545915) | $1,500 |
| Dec 27, 2024 | In progress issued Jun 2025 | 2524 Post St | Barcci Builders Inc | remodel e) kitchen & bathroom on top fl unit. removel of wall btw kitchen & dining room, removal currently abandoned flues. moving 1 bathroom window & other associated adjustment to interior door. a new sub panel is to be installed for all updated & new circuitsDetails
remodel e) kitchen & bathroom on top fl unit. removel of wall btw kitchen & dining room, removal currently abandoned flues. moving 1 bathroom window & other associated adjustment to interior door. a new sub panel is to be installed for all updated & new circuits | $40,000 |
| Sep 26, 2024 | In progress issued May 2025 | 2428 Union St | Trejo Construction, Brendan Lalor Construction | unit 2- (e) garage celing height to be increased as per structural drawings/caluclations. proposed north (back) elevation to include (n) garage door and (n) swing outdoor. no work in front.Details
unit 2- (e) garage celing height to be increased as per structural drawings/caluclations. proposed north (back) elevation to include (n) garage door and (n) swing outdoor. no work in front. | $100,000 |
| Sep 9, 2024 | Completed final sign-off May 2025 | 979 Rhode Island St | Ehline Construction Inc. | 2/f: modification to interior space through selective demolition to extend a dining room to the perimeter of the building envelope.Details
2/f: modification to interior space through selective demolition to extend a dining room to the perimeter of the building envelope. | $30,000 |
| Dec 4, 2023 | Completed final sign-off Oct 2024 | 1238 44th Av | Ehline Construction Inc. | selective demolition and modifications to interior space, adding new partions to convert an (e) storage area into a new family room and bathroom.Details
selective demolition and modifications to interior space, adding new partions to convert an (e) storage area into a new family room and bathroom. | $125,000 |
| Aug 14, 2023 | Never finaled issued Aug 2023, no final | 220 Montgomery St | Principal Builders Inc. | deferred structural permit for 2022-1219-8630. trellis, shelving, reception hutDetails
deferred structural permit for 2022-1219-8630. trellis, shelving, reception hut | $200,000 |
| May 17, 2022 | Never finaled issued Aug 2022, no final | 1995 Evans Av | Atthowe Transportation Cooperative Corp | installation of city owned public art work, entry plaza sfpd building ref 201712217096 for reference onlyDetails
installation of city owned public art work, entry plaza sfpd building ref 201712217096 for reference only | $50,000 |
| Sep 30, 2021 | Never finaled issued Nov 2021, no final | 55 Music Concourse Dr | Jungsten Construction Inc | install 1 electric single faced wall sign on face of the building: "lift every voice"Details
install 1 electric single faced wall sign on face of the building: "lift every voice" | $10,000 |
| Apr 16, 2021 | Completed final sign-off Oct 2022 | 1955 42nd Av | Ehline Construction Inc. | ground floor interior improvements: modification to (e) interior space through selective demolition and addition of new partitions to convert (e) storage into a new bedroom and bathroom.Details
ground floor interior improvements: modification to (e) interior space through selective demolition and addition of new partitions to convert (e) storage into a new bedroom and bathroom. | $75,000 |
| Jan 12, 2021 | Expired or cancelled withdrawn Feb 2021 | 228 Liberty St | kitchen and bath remodel. interior and rear exterior window replacement. interior refinishing of floor and ceiling. windows not visible from street.Details
kitchen and bath remodel. interior and rear exterior window replacement. interior refinishing of floor and ceiling. windows not visible from street. | $68,054 | |
| Jun 8, 2020 | Completed final sign-off May 2021 | 49 South Van Ness Av | Finnegan Construction | installation of atrium artwork for 49 south van ness, as public art project generated by city public art ordinance.Details
installation of atrium artwork for 49 south van ness, as public art project generated by city public art ordinance. | $100,000 |