Jungsten Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2000 to Jul 2026
- Last 24 months
- 1 permit filed
43 permits since 2000: 35 completed, 1 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Jul 2026 | 223 Spruce St | dormer additionDetails
dormer addition | $15,000 |
| Jul 11, 2024 | Completed final sign-off Aug 2024 | 2741 Divisadero St | revision to 202207279382 to delete door at family room/media room to garage ref 202207279382Details
revision to 202207279382 to delete door at family room/media room to garage ref 202207279382 | |
| Apr 24, 2023 | Completed final sign-off Jun 2024 | 2441 Greenwich St | replaceing windows in existing openings @ units 2441 & 2443. provide bird safe glazing per sec 139 sfpc.Details
replaceing windows in existing openings @ units 2441 & 2443. provide bird safe glazing per sec 139 sfpc. | $350,000 |
| Nov 17, 2022 | Completed final sign-off Aug 2024 | 2741 Divisadero St | modify exteior windows. 3 bay windows on rear elevation, not visible from street.Details
modify exteior windows. 3 bay windows on rear elevation, not visible from street. | $250,000 |
| Jul 27, 2022 | Completed final sign-off Oct 2024 | 2741 Divisadero St | interior remodel - move kitchen, new bathroom and structural uprgradesDetails
interior remodel - move kitchen, new bathroom and structural uprgrades | $1,500,000 |
| Apr 13, 2022 | Completed final sign-off Aug 2024 | 2741 Divisadero St | selective demo at water damaged areas, replace damaged drywall flooring, wall finishes, plumbing fixtures and pipingDetails
selective demo at water damaged areas, replace damaged drywall flooring, wall finishes, plumbing fixtures and piping | $750,000 |
| Sep 30, 2021 | Never finaled issued Nov 2021, no final | 55 Music Concourse Dr | install 1 electric single faced wall sign on face of the building: "lift every voice"Details
install 1 electric single faced wall sign on face of the building: "lift every voice" | $10,000 |
| Feb 25, 2020 | Completed final sign-off Jul 2020 | 55 Music Concourse Dr | 2-year installation of wood stage w/in bandshell at spreckls music temple, work includes lighting & audio.Details
2-year installation of wood stage w/in bandshell at spreckls music temple, work includes lighting & audio. | $40,000 |
| Jan 19, 2017 | Completed final sign-off Feb 2017 | 130 Lippard Av | revision to app#201312063515:reframe kitchen walls (dificient extg framing), revision to foundation and shear wall. no change to original scope.Details
revision to app#201312063515:reframe kitchen walls (dificient extg framing), revision to foundation and shear wall. no change to original scope. | $10,000 |
| Jul 21, 2015 | Completed final sign-off Nov 2015 | 3016 Sacramento St | removal of existing siding and windows. installation of new pre-primed pine siding and marvin wood double hung windows with new trim around the new windows and edges of the top.Details
removal of existing siding and windows. installation of new pre-primed pine siding and marvin wood double hung windows with new trim around the new windows and edges of the top. | $50,000 |
| Jun 5, 2015 | Completed final sign-off Oct 2015 | 298 Upper Tr | revision to pa#2015-0226-9431. interior kitchen & bathroom remodel; non-structural revisions.Details
revision to pa#2015-0226-9431. interior kitchen & bathroom remodel; non-structural revisions. | $30,000 |
| Apr 7, 2015 | Completed final sign-off May 2016 | 4349 18th St | revision to pa #201406249251 - revise interior partition plans, minor structural modifications, change storage to powder rm @ 2nd flr. reconfigure floor layout & add 2 baths @ 3rd & 4th floor. add sidewall windows at (e) openings, new hvac & electrical.Details
revision to pa #201406249251 - revise interior partition plans, minor structural modifications, change storage to powder rm @ 2nd flr. reconfigure floor layout & add 2 baths @ 3rd & 4th floor. add sidewall windows at (e) openings, new hvac & electrical. | $100,000 |
| Feb 26, 2015 | Completed final sign-off Oct 2015 | 298 Upper Tr | replacement of all the street elevation windows. n/a maher ordinanceDetails
replacement of all the street elevation windows. n/a maher ordinance | $30,000 |
| Feb 20, 2014 | Completed final sign-off Sep 2014 | 1333 Jones St | #1208 - interior remodel of existing master bath with new finishes. replacement of fixtures and finishes in hall bath. replace existing light fixtures. replace outlets with code compliant gfci outlets. all work is non structuralDetails
#1208 - interior remodel of existing master bath with new finishes. replacement of fixtures and finishes in hall bath. replace existing light fixtures. replace outlets with code compliant gfci outlets. all work is non structural | $225,000 |
| Dec 17, 2013 | Completed final sign-off Jun 2014 | 264 Precita Av | re-construct entry stairs in kind. replace kitchen nook door & window with new "nanawall" unit.Details
re-construct entry stairs in kind. replace kitchen nook door & window with new "nanawall" unit. | $27,000 |
| May 22, 2012 | Never finaled issued May 2012, no final | 110 Freelon St | voluntary structural strenghthening of existing 3-unit residential building.Details
voluntary structural strenghthening of existing 3-unit residential building. | $250,000 |
| Mar 21, 2012 | Completed final sign-off Jul 2012 | 1800 Gough St | #4: replace (26) sashs @ (e) windows. some facing street. (e) windows to remain. all work in kind.Details
#4: replace (26) sashs @ (e) windows. some facing street. (e) windows to remain. all work in kind. | $47,500 |
| Jan 6, 2012 | Completed final sign-off Jul 2012 | 171 South Park | replace (e) wood single pane windows with new wood douible pane windows. replace (e) wood trims at windows, paint exterior facade. max u-factor 0.40Details
replace (e) wood single pane windows with new wood douible pane windows. replace (e) wood trims at windows, paint exterior facade. max u-factor 0.40 | $15,000 |
| Dec 28, 2011 | Completed final sign-off May 2012 | 17 Glover St | waterproofing repair, siding repair.Details
waterproofing repair, siding repair. | $30,000 |
| Nov 10, 2011 | Never finaled issued Mar 2012, no final | 110 Freelon St | interior renovation of existing loft, move baths, kitchen remodel, interior froming, replace skylights, reinforce structure and new skylight installed, in soma with reduced floor area and sprinkled throughout. page a-2.00 item 4 unvented ethanol fireplace not permitted.Details
interior renovation of existing loft, move baths, kitchen remodel, interior froming, replace skylights, reinforce structure and new skylight installed, in soma with reduced floor area and sprinkled throughout. page a-2.00 item 4 unvented ethanol fireplace not permitted. | $800,000 |
| Jul 20, 2011 | Never finaled issued Jul 2011, no final | 110 Freelon St | exploratory demolition permit, reveal structure (e). open up floor and foundations 4 to 5 location to find condition & depth, open dry wall ceilings to reveal framing and conditions approx 50 sq.ft. in each location.Details
exploratory demolition permit, reveal structure (e). open up floor and foundations 4 to 5 location to find condition & depth, open dry wall ceilings to reveal framing and conditions approx 50 sq.ft. in each location. | $1,200 |
| Jun 6, 2011 | Completed final sign-off Apr 2012 | 20 Walnut St | voluntary foundation upgrades, relocate hot water heater & furnace, misc electrical repairs & sheetrock patching, install new rated door at stairwellDetails
voluntary foundation upgrades, relocate hot water heater & furnace, misc electrical repairs & sheetrock patching, install new rated door at stairwell | $42,000 |
| Jan 21, 2011 | Completed final sign-off Mar 2011 | 3003 Jackson St | revision to pa# 2010.11.05.4446. rebuild (e) deck with same foot print and same design. new deck being built over existing roof/ guest bedroom of the floor below it,Details
revision to pa# 2010.11.05.4446. rebuild (e) deck with same foot print and same design. new deck being built over existing roof/ guest bedroom of the floor below it, | $15,000 |
| Nov 5, 2010 | Completed final sign-off Mar 2011 | 3003 Jackson St | master bath remodel @ top floor as per plan, inspect & replace dryrot @ top floor & family room decks, repair molding & doors @ top floor guest bedrooms.Details
master bath remodel @ top floor as per plan, inspect & replace dryrot @ top floor & family room decks, repair molding & doors @ top floor guest bedrooms. | $42,500 |
| Jan 13, 2010 | Completed final sign-off May 2010 | 1800 Gough St | remodel kitchen, replace cabients & counters, new appliances, new lighting, same footprint, same plumbing locations.no door work, no window work on this permit. no structural changes. at least 50% high efficacy wattage.Details
remodel kitchen, replace cabients & counters, new appliances, new lighting, same footprint, same plumbing locations.no door work, no window work on this permit. no structural changes. at least 50% high efficacy wattage. | $52,000 |
| Oct 19, 2009 | Completed final sign-off Jan 2010 | 2736 Filbert St | revision-addition to existing permit #2009/0819/5118. relocate doorway on 1st. flr. (ues) existing door for new closet, non-structrural. enlarge closet on 3rd. flr. non-structural.legalize bath on ground floor.Details
revision-addition to existing permit #2009/0819/5118. relocate doorway on 1st. flr. (ues) existing door for new closet, non-structrural. enlarge closet on 3rd. flr. non-structural.legalize bath on ground floor. | $1,000 |
| Aug 19, 2009 | Completed final sign-off Jan 2010 | 2736 Filbert St | replace in kind - 9 single pane french doors, 4 single pane windows, 1 door with double pane insulated in same openings with clad wood. bathroom remodel, no structural work u-factor <0.67 typical.Details
replace in kind - 9 single pane french doors, 4 single pane windows, 1 door with double pane insulated in same openings with clad wood. bathroom remodel, no structural work u-factor <0.67 typical. | $50,000 |
| Sep 9, 2008 | Completed final sign-off Mar 2009 | 1000 Franklin St | interior work only. new cabinets in kitchen , master bath, new lighting & electrical/plmg. relocated non structural wall at master bath areaDetails
interior work only. new cabinets in kitchen , master bath, new lighting & electrical/plmg. relocated non structural wall at master bath area | $80,000 |
| Jun 19, 2008 | Never finaled issued Jun 2008, no final | 1051 Francisco St | minor dryrot repair @ top floor parapit wall @ back side of bldg.Details
minor dryrot repair @ top floor parapit wall @ back side of bldg. | $600 |
| Apr 28, 2008 | Never finaled issued Apr 2008, no final | 1051 Francisco St | interior alternation to remove finishes for structural investingation & exploration to confirm mechanical systems. less than 2/3 removal of interior finishes. approx 500 sqft of material.Details
interior alternation to remove finishes for structural investingation & exploration to confirm mechanical systems. less than 2/3 removal of interior finishes. approx 500 sqft of material. | $1,000 |
| Sep 13, 2007 | Completed final sign-off Feb 2008 | 1050 Green St | #3- revision appl#200703206764 omit proposed property line window, delete proposed window in apt. #3 dining room.Details
#3- revision appl#200703206764 omit proposed property line window, delete proposed window in apt. #3 dining room. | |
| Mar 12, 2007 | Completed final sign-off Oct 2007 | 2127 Broadway | interior remodel of extg kchn and bathrooms (3) at 2nd floor at unit #2Details
interior remodel of extg kchn and bathrooms (3) at 2nd floor at unit #2 | $190,000 |
| Dec 26, 2006 | Completed final sign-off Feb 2007 | 120 27th Av | remove old wood burning fireplace chimney and replace with sealed gas burning. job includes removing old brick and patching with siding to match adjacent and rent fireplace thru exteriorDetails
remove old wood burning fireplace chimney and replace with sealed gas burning. job includes removing old brick and patching with siding to match adjacent and rent fireplace thru exterior | $10,000 |
| Sep 2, 2004 | Completed final sign-off Dec 2004 | 1701 Broadway | remove (e) redwood decking (boards only), replace with new ipe hardwood decking. deck is 10'x20' inDetails
remove (e) redwood decking (boards only), replace with new ipe hardwood decking. deck is 10'x20' in | $2,500 |
| Aug 9, 2004 | Completed final sign-off Nov 2004 | 2255 Washington St | correct all code violations per 3r report 3r-4046 final inspection for tic conversionDetails
correct all code violations per 3r report 3r-4046 final inspection for tic conversion | $300 |
| Feb 26, 2004 | Completed final sign-off Jun 2004 | 2961 Washington St | refacing of 2-bathrooms, one-1 toilet rm.Details
refacing of 2-bathrooms, one-1 toilet rm. | $7,500 |
| Nov 4, 2003 | Completed final sign-off Dec 2003 | 2957 Washington St | to renew app#2002/09/12/6329 for final inspection.Details
to renew app#2002/09/12/6329 for final inspection. | |
| Jul 30, 2003 | Completed final sign-off Feb 2004 | 2255 Washington St | clarify roof access door & garage storage layout.valuation adjustment. skylite revision.Details
clarify roof access door & garage storage layout.valuation adjustment. skylite revision. | $175,000 |
| Jan 13, 2003 | Completed final sign-off Jul 2003 | 1800 Gough St | 7/f - remove/replace (e) fix. & finishes, no structural changes, replace cabinetry, appliances, fix.Details
7/f - remove/replace (e) fix. & finishes, no structural changes, replace cabinetry, appliances, fix. | $150,000 |
| Sep 12, 2002 | Expired or cancelled expired Dec 2003 | 2957 Washington St | refacing of kitchen & bathroom for top floor unit. structural changesDetails
refacing of kitchen & bathroom for top floor unit. structural changes | $80,000 |
| Apr 8, 2002 | Completed final sign-off Aug 2002 | 37 West Clay St | ammend to (e) app #200010133005-s1 move landscae & retaining wall 2' lower grade elevation of garageDetails
ammend to (e) app #200010133005-s1 move landscae & retaining wall 2' lower grade elevation of garage | |
| May 10, 2000 | Completed final sign-off Dec 2000 | 146 Laidley St | redvision to app #9907245s/add grade beamDetails
redvision to app #9907245s/add grade beam | $3,000 |
| Feb 15, 2000 | Completed final sign-off Jul 2000 | 41 Rico Wy | install cabinets (uppers &lowers), no wall reconfiguration, (use @ studs, minor electricsDetails
install cabinets (uppers &lowers), no wall reconfiguration, (use @ studs, minor electrics |