Rory James Carroll
- Listed as
- architect
- Firm
- Axis Gfa Architecture & Design
- Based in
- San Francisco
- On San Francisco permits
- Aug 2017 to Jun 2026
55 permits since 2000 (architect on 55 permits): 39 completed, 4 in progress, 9 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jul 2026 | 333 Ofarrell St | Singular Builders | remodel of 2 existing hotel guestrooms(rooms 2681 & 2682. remodel of 2 existing guestroom bathrooms only(rooms 2380 & 2683)Details
remodel of 2 existing hotel guestrooms(rooms 2681 & 2682. remodel of 2 existing guestroom bathrooms only(rooms 2380 & 2683) | $75,000 |
| May 15, 2026 | In progress issued Jul 2026 | 55 Cyril Magnin St | Singular Builders | 22nd floor: remodel of 2 existing hotel guestrooms( rooms 2213 & 2215). remodel of 2 existing guestroom bathrooms only(rooms 2214 & 2218)Details
22nd floor: remodel of 2 existing hotel guestrooms( rooms 2213 & 2215). remodel of 2 existing guestroom bathrooms only(rooms 2214 & 2218) | $90,000 |
| Oct 2, 2025 | Completed final sign-off Jun 2026 | 555 North Point St | Continental Contractors Inc | 2 and 3/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing).Details
2 and 3/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing). | $650,000 |
| Oct 2, 2025 | Completed final sign-off May 2026 | 555 North Point St | Continental Contractors Inc | 4 and 5/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing). remove barrier at (e) public bathroom at ground floor to include (n) fixtures and finishes.Details
4 and 5/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing). remove barrier at (e) public bathroom at ground floor to include (n) fixtures and finishes. | $930,000 |
| May 23, 2025 | In progress filed May 2025, not yet issued | 515 Mason St | barrier removal of the existing employee locker rooms. scope includes new plumbing fixtures, lighting, finishes and toilet partitions.Details
barrier removal of the existing employee locker rooms. scope includes new plumbing fixtures, lighting, finishes and toilet partitions. | $200,000 | |
| Dec 6, 2024 | Completed final sign-off Apr 2025 | 299 02nd St | Skanska Usa Building Inc | revision to pa 2023-1130-1690 for change to exterior wall detail 11/a8.01Details
revision to pa 2023-1130-1690 for change to exterior wall detail 11/a8.01 | |
| Mar 5, 2024 | Completed final sign-off May 2024 | 333 Battery St | Centric Construction Inc | ref pa# 202305026872 administrative permit to confirm occupancy counts for ground fl restaurantDetails
ref pa# 202305026872 administrative permit to confirm occupancy counts for ground fl restaurant | |
| Feb 13, 2024 | In progress filed Feb 2024, not yet issued | 333 Battery St | ref pa# 2022-1213-8174 adminstrative permit to confirm occupancy counts for level 3 public spacesDetails
ref pa# 2022-1213-8174 adminstrative permit to confirm occupancy counts for level 3 public spaces | ||
| Nov 30, 2023 | Completed final sign-off Apr 2025 | 299 02nd St | Skanska Usa Building Inc | selective replacement of eterior tile facade installed under permit 201812148389.Details
selective replacement of eterior tile facade installed under permit 201812148389. | |
| Nov 9, 2023 | Completed final sign-off Aug 2024 | 515 Mason St | Hathaway Dinwiddie Co. | employee dining and cafeteria remodel at (e) hotel. scope includes new floor and wall finish. new act tiles. new lighting and ff & e. relocate e) hand wash sinkDetails
employee dining and cafeteria remodel at (e) hotel. scope includes new floor and wall finish. new act tiles. new lighting and ff & e. relocate e) hand wash sink | $100,000 |
| Sep 14, 2023 | Completed final sign-off May 2024 | 333 Battery St | Centric Construction Inc | revision to pa# 202305026872. (e) storefront to remain. (n) framing & finishes at entry facade. (n) power door operator & high/low actuator switches for (n) entry door. revisions to structural and electrical drawings.Details
revision to pa# 202305026872. (e) storefront to remain. (n) framing & finishes at entry facade. (n) power door operator & high/low actuator switches for (n) entry door. revisions to structural and electrical drawings. | |
| Jun 23, 2023 | Completed final sign-off May 2024 | 333 Battery St | Centric Construction Inc | new mechanical system for (n)ground fl restaurant renovation.scope of work basement level a and levels 1-3.ref# 202305026872Details
new mechanical system for (n)ground fl restaurant renovation.scope of work basement level a and levels 1-3.ref# 202305026872 | $250,000 |
| Jun 6, 2023 | Completed final sign-off Apr 2024 | 333 Battery St | Centric Construction Inc | basement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lightingDetails
basement: conversion of (e) back of house space to new offices/changing rooms, new partitions, finishes & lighting | $20,000 |
| May 2, 2023 | Completed final sign-off May 2024 | 333 Battery St | Centric Construction Inc | basement l/a, l/1 and l/2: scope includes new wine storage condensing unit on basement level a, renovation of (e) restaurant and bar on l/1, new partitions, finishes, and lighting, new kitchen with new partitions, finishes, lighting, & equipment. new boh restaurant prep area on l/2.Details
basement l/a, l/1 and l/2: scope includes new wine storage condensing unit on basement level a, renovation of (e) restaurant and bar on l/1, new partitions, finishes, and lighting, new kitchen with new partitions, finishes, lighting, & equipment. new boh restaurant prep area on l/2. | $1,000,000 |
| Dec 16, 2022 | Never finaled issued Apr 2023, no final | 333 Battery St | Continental Contractors Inc | 15-24/flrs: renovations of guestrooms including new finishes, plumbing fixtures and lighting.Details
15-24/flrs: renovations of guestrooms including new finishes, plumbing fixtures and lighting. | $900,000 |
| Dec 16, 2022 | Never finaled issued Apr 2023, no final | 333 Battery St | Continental Contractors Inc | 5-14/flrs: renovation of guestrooms including n finishes, plumbing fixtures and lightingDetails
5-14/flrs: renovation of guestrooms including n finishes, plumbing fixtures and lighting | $900,000 |
| Aug 26, 2022 | Completed final sign-off Dec 2023 | 333 Battery St | Centric Construction Inc | basement c: expansion of (e) fitness center, new finishes, mech & lighting. basement b & level 2: new finishes, retrofit lighting at (e) prefunction & meeting spaces, new vanity, sinks, lighting at public restrooms. maher n/a.Details
basement c: expansion of (e) fitness center, new finishes, mech & lighting. basement b & level 2: new finishes, retrofit lighting at (e) prefunction & meeting spaces, new vanity, sinks, lighting at public restrooms. maher n/a. | $400,000 |
| Aug 17, 2022 | Completed final sign-off Dec 2023 | 333 Battery St | Centric Construction Inc | level 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3).Details
level 1: new paving, drains, finishes, exterior screen, entry door at porte-cochere; new lighting, mech, finishes, ff&e @new pre-arrival lobby; new handrail extensions (level 1 only) & floor finishes @ grand stair (levels 1-3). | $600,000 |
| Jul 22, 2022 | Expired or cancelled cancelled Jan 2026 | 333 Battery St | demo of (e) tile paving & mortar and install of (n) paving materials @ the public right away (clay st)Details
demo of (e) tile paving & mortar and install of (n) paving materials @ the public right away (clay st) | $28,000 | |
| Jun 14, 2022 | Completed final sign-off Feb 2023 | 1800 Sutter St | Continental Contractors Inc | renovation of (e) guest bathrooms including (n) floor and wall finishes, and (n) plumbing fixtures. conversion of (e) tubs to (n) showers.Details
renovation of (e) guest bathrooms including (n) floor and wall finishes, and (n) plumbing fixtures. conversion of (e) tubs to (n) showers. | $750,000 |
| May 27, 2022 | Never finaled filed May 2022, never issued | 5 Embarcadero Center | addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windowsDetails
addition of 30 guestrooms to the existing hotel by establishing 2 new guestrooms per floor on floor 2-17 via the conversion of 2 areas on either side of the elevator. total guestroom count after construction will be 851. scope includes (n) entry door, walls, lighting and finishes. replace (e)windows | $1,100,000 | |
| Apr 25, 2022 | Expired or cancelled cancelled Jan 2026 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | revision to pa# 202012030185. revising rating on doors from approved permit.Details
revision to pa# 202012030185. revising rating on doors from approved permit. | |
| Apr 8, 2022 | Completed final sign-off Nov 2024 | 299 02nd St | Precision Hotel Interiors Inc | expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck.Details
expansion of (e) fitness center, including (n) fitness equipment, flor, wall & ceiling finishes. infill (e) indoor pool & spa & convert space into a meeting room. expansion of (e) outdoor patio on 2nd fl. (n) bi-folding door & storefront at deck. | $900,000 |
| Apr 7, 2022 | Completed final sign-off Oct 2022 | 222 Sansome St | Cw Horton General Contractor | revision to pa# 201907186324. to document change in designated accessible mobility guestrooms.Details
revision to pa# 201907186324. to document change in designated accessible mobility guestrooms. | |
| Dec 2, 2021 | Completed final sign-off Jun 2022 | 333 Battery St | Continental Contractors Inc | 5/f: renovation of two guestrooms and partial corridor, including new finishes, plumbing fixtures, light fixtures, and flooring. new tactile exist signs at hotel entry.Details
5/f: renovation of two guestrooms and partial corridor, including new finishes, plumbing fixtures, light fixtures, and flooring. new tactile exist signs at hotel entry. | $10,000 |
| Nov 18, 2021 | Never finaled issued Jan 2022, no final | 5 Embarcadero Center | Hathaway Dinwiddie Co. | identify the calculated and approved occupant load for the assembly spaces at the atrium level 3rd fl of existing hotelDetails
identify the calculated and approved occupant load for the assembly spaces at the atrium level 3rd fl of existing hotel | |
| Nov 8, 2021 | Completed final sign-off Mar 2022 | 125 03rd St | Hathaway Dinwiddie Co. | new evacuation signage at lobby lvel of e hotel. interior renovation approved under 202106031577Details
new evacuation signage at lobby lvel of e hotel. interior renovation approved under 202106031577 | $2,200 |
| Sep 17, 2021 | Never finaled issued Sep 2021, no final | 333 Ofarrell St | Hathaway Dinwiddie Co. | new evacuation signs (17 total) in grand ballroom on 3/f and mezz level. interior renovation permit under pa201910306012. maher n/a.Details
new evacuation signs (17 total) in grand ballroom on 3/f and mezz level. interior renovation permit under pa201910306012. maher n/a. | $7,500 |
| Sep 15, 2021 | Completed final sign-off Oct 2022 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | floors 2-11: renovate (e) guestrooms to provide clear floor space at plmbing fixtures scope.inlcludes outlet relocation and new ff&e,finishes, lhgting and plumbing fixtures.renoation of corridors on flrs 2-11,including new finishes and pf%e. (e) hvac system to remain.Details
floors 2-11: renovate (e) guestrooms to provide clear floor space at plmbing fixtures scope.inlcludes outlet relocation and new ff&e,finishes, lhgting and plumbing fixtures.renoation of corridors on flrs 2-11,including new finishes and pf%e. (e) hvac system to remain. | $5,000,000 |
| Aug 10, 2021 | Completed final sign-off Dec 2021 | 555 North Point St | Global Managing Innovations Inc Dba Nati | barrier removal related to accessible business entrance program 51-16 category 2. including item 1: route from accessible passenger loading zone exceeds 1:48.regrade excessive slipes at accessible passenger loading zone; new handrails at (e) ramp (in parking lot)Details
barrier removal related to accessible business entrance program 51-16 category 2. including item 1: route from accessible passenger loading zone exceeds 1:48.regrade excessive slipes at accessible passenger loading zone; new handrails at (e) ramp (in parking lot) | $25,000 |
| Jul 23, 2021 | Completed final sign-off Oct 2022 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | renovation of e guestrooms ( flrs 12,14,15) to provide clear floor space at plumbing fixtures. scope also includes outlet relocation and new ffe, finishes, lighting, plumbing fixtures. renovation of corridors on floors 12-17, including new finishes ffe and lighting. (e) hvac systems to remain.Details
renovation of e guestrooms ( flrs 12,14,15) to provide clear floor space at plumbing fixtures. scope also includes outlet relocation and new ffe, finishes, lighting, plumbing fixtures. renovation of corridors on floors 12-17, including new finishes ffe and lighting. (e) hvac systems to remain. | $26,554 |
| Jun 29, 2021 | Never finaled issued Aug 2021, no final | 689 Mission St | applying for level 9 roof terrace assembly permit. all spaces over 49 occupants require a place of assembly permit. per a recent correction notice from sffd, a place of assembly permit has never been filed even though the space is not new. provided plans include ref.200008309233 to show occupantloadDetails
applying for level 9 roof terrace assembly permit. all spaces over 49 occupants require a place of assembly permit. per a recent correction notice from sffd, a place of assembly permit has never been filed even though the space is not new. provided plans include ref.200008309233 to show occupantload | ||
| Jun 3, 2021 | Completed final sign-off Mar 2022 | 125 03rd Av | Hathaway Dinwiddie Construct Co | renovation of the first floor including the lobby, lounge, reception, and bar areas, including- replacement od interior finishes, new mill work and changes to bar layout, including new equipment and changes to plumbing and electrical replacement of light fixtures.Details
renovation of the first floor including the lobby, lounge, reception, and bar areas, including- replacement od interior finishes, new mill work and changes to bar layout, including new equipment and changes to plumbing and electrical replacement of light fixtures. | $1,408,132 |
| Apr 29, 2021 | Completed final sign-off Feb 2022 | 555 North Point St | Global Managing Innovations Inc Dba Nati | room 554: barrier removal at executive suite to a mobility accessible guestroom to meet dispersion. scope includes reconfiguration of bathroom, replacement of plumbing fixtures, and replacement of finishes to match existing.Details
room 554: barrier removal at executive suite to a mobility accessible guestroom to meet dispersion. scope includes reconfiguration of bathroom, replacement of plumbing fixtures, and replacement of finishes to match existing. | $55,000 |
| Apr 9, 2021 | Never finaled issued Jun 2021, no final | 299 02nd St | Fdr Construction Inc | removal of (e) specific pieces of laundry euipment. reconfiguration of storage and employee area addition of office spaces (2) exterior wall louvers to be demolished and replaced with (n) wall to match existing.Details
removal of (e) specific pieces of laundry euipment. reconfiguration of storage and employee area addition of office spaces (2) exterior wall louvers to be demolished and replaced with (n) wall to match existing. | $58,000 |
| Dec 24, 2020 | Completed final sign-off Mar 2022 | 125 03rd St | Hathaway Dinwiddie Co. | barrier removel: accessible passenger drop-off/loading zone & access aisle, accessible entries, modification to accessible parking signage & elevator door jamp signs. widen women's accessible restroom stall. removal of urinal in men's restroom to probide adequate door clearance.Details
barrier removel: accessible passenger drop-off/loading zone & access aisle, accessible entries, modification to accessible parking signage & elevator door jamp signs. widen women's accessible restroom stall. removal of urinal in men's restroom to probide adequate door clearance. | $150,000 |
| Dec 3, 2020 | Completed final sign-off Oct 2022 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | enclosing 3 vestibules along sacramento alley. scope includes new wall & egress doors. no change to occupancy load or egress path.Details
enclosing 3 vestibules along sacramento alley. scope includes new wall & egress doors. no change to occupancy load or egress path. | $50,000 |
| Aug 5, 2020 | Never finaled issued Oct 2020, no final | 5 The Embarcadero | Hathaway Dinwiddie Co. | 5th fl: renovation of 2 existing guestrooms and partial corridor/door drop, including new finishes, plumbing fixtures, lighting fixtures and flooring. maher naDetails
5th fl: renovation of 2 existing guestrooms and partial corridor/door drop, including new finishes, plumbing fixtures, lighting fixtures and flooring. maher na | $153,482 |
| Nov 18, 2019 | Never finaled issued Feb 2020, no final | 222 Sansome St | Cw Horton General Contractor | no change to building area or room count. accessible path of travel upgrades/barrier removal exterior & hotel entry. non-structural demo & repair of (e) materials.new lighting at select areas in elevator lobby & restaurant. 3rd floor corridor new finishes & decorative lighting. new entry at lobby.Details
no change to building area or room count. accessible path of travel upgrades/barrier removal exterior & hotel entry. non-structural demo & repair of (e) materials.new lighting at select areas in elevator lobby & restaurant. 3rd floor corridor new finishes & decorative lighting. new entry at lobby. | $300,000 |
| Nov 18, 2019 | Completed final sign-off May 2023 | 222 Sansome St | De Haro Ramirez Corp | accessible path of travel upgrades/barrier removal at exterior of the building. new curb ramp at passenger loading zone on city sidewalkDetails
accessible path of travel upgrades/barrier removal at exterior of the building. new curb ramp at passenger loading zone on city sidewalk | $35,000 |
| Oct 30, 2019 | Completed final sign-off Nov 2021 | 333 Ofarrell St | Hathaway Dinwiddie Co. | interior remodel of grand ballroom at 3rd fl and adjacent atrium/escalator space extending from gr fl lobby to 4th fl. public toilets at 1/2 level above ballroom to be upgraded to comply with current accessibility codes. 2 unisex bath within meeting room suites will be upgraded. scope includes newDetails
interior remodel of grand ballroom at 3rd fl and adjacent atrium/escalator space extending from gr fl lobby to 4th fl. public toilets at 1/2 level above ballroom to be upgraded to comply with current accessibility codes. 2 unisex bath within meeting room suites will be upgraded. scope includes new | $3,920,000 |
| Oct 29, 2019 | Completed final sign-off Feb 2020 | 125 03rd St | Continental Contractors Inc | unit 1102. barrier removal at guestroom including new finishes, plumbing fixtures, and flooringDetails
unit 1102. barrier removal at guestroom including new finishes, plumbing fixtures, and flooring | $20,776 |
| Oct 4, 2019 | Completed final sign-off Feb 2022 | 222 Sansome St | Cw Horton General Contractor | 3rd fl - inteior remodel of health club and unisex restroom scope include new floor and wall finishes, fitness equipment. existing unisex restroom to be upgrade to comply with current codes with no change in fixture counts. work consist of finishes only and barrier removal.Details
3rd fl - inteior remodel of health club and unisex restroom scope include new floor and wall finishes, fitness equipment. existing unisex restroom to be upgrade to comply with current codes with no change in fixture counts. work consist of finishes only and barrier removal. | $17,000 |
| Aug 26, 2019 | Completed final sign-off Dec 2019 | 5 The Embarcadero | Hathaway Dinwiddie Co. | floors 2-17:revision to 201812208921 to include special inspections for fireproof patching at (e) metal decking and beams. removal of (e) spray fireproofing at (e) beam where indicated. new spray fire proofing and intumescent paint where indicatedDetails
floors 2-17:revision to 201812208921 to include special inspections for fireproof patching at (e) metal decking and beams. removal of (e) spray fireproofing at (e) beam where indicated. new spray fire proofing and intumescent paint where indicated | |
| Jul 23, 2019 | Completed final sign-off Mar 2021 | 299 02nd St | Skanska Usa Building Inc | revision to 201812148389 and 201901251235: (e) roof trellis to remain, changes to elevations revised structural design to art box, marquee, rest, canopy, ext light fixture remove from scopeDetails
revision to 201812148389 and 201901251235: (e) roof trellis to remain, changes to elevations revised structural design to art box, marquee, rest, canopy, ext light fixture remove from scope | |
| Jun 21, 2019 | Completed final sign-off Dec 2019 | 5 The Embarcadero | Hathaway Dinwiddie Co. | revision to app#201812208921. revision to include revised partition type "e" for the 2 hour guest room to corridor partition. n/a for maherDetails
revision to app#201812208921. revision to include revised partition type "e" for the 2 hour guest room to corridor partition. n/a for maher | |
| Apr 16, 2019 | Completed final sign-off Oct 2019 | 5 The Embarcadero | demo of existing windows on east side of building, 2nd-17th floors. replace in-kind with mission safety class. no change to (e) window size, mullions or appearance. one glass window panel to be reviewed for matching purposes in advance by preservation planning staff. no other work under this permit.Details
demo of existing windows on east side of building, 2nd-17th floors. replace in-kind with mission safety class. no change to (e) window size, mullions or appearance. one glass window panel to be reviewed for matching purposes in advance by preservation planning staff. no other work under this permit. | $100,000 | |
| Apr 12, 2019 | Completed final sign-off Sep 2019 | 222 Sansome St | Nibbi Bros Assoc Inc. | 48th fl - renovation of guest rooms 4804 and 4805, including (n) finishes, plumbing fixtures and flooringDetails
48th fl - renovation of guest rooms 4804 and 4805, including (n) finishes, plumbing fixtures and flooring | $20,037 |
| Jan 25, 2019 | Completed final sign-off Mar 2021 | 299 02nd St | Skanska Usa Building Inc | selective demo of 1st & 2nd fl, interior and exterior selective demo of (e) porte cochere, public open space at folsom and courtyard public open space. demolition of roof trellis. associated with bpa #201812148389.Details
selective demo of 1st & 2nd fl, interior and exterior selective demo of (e) porte cochere, public open space at folsom and courtyard public open space. demolition of roof trellis. associated with bpa #201812148389. | $1,000,000 |
| Dec 18, 2018 | Completed final sign-off Oct 2019 | 5 The Embarcadero | 15/f: 1540/1541/1542: remodel (e) suite including plmb fixtures lighting and finishes. maher n/a.Details
15/f: 1540/1541/1542: remodel (e) suite including plmb fixtures lighting and finishes. maher n/a. | $65,000 | |
| Dec 14, 2018 | Completed final sign-off Aug 2021 | 299 02nd St | Skanska Usa Building Inc | ground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of (e) port-cochere, new exterior covered outdoor space, interior renovation of ground floor public spaces, basement parking restriping. ** maher: n/a **Details
ground & 2nd floor - selective remodel of exterior, new interior finishes. expand lobby at ground floor, partial infill of (e) port-cochere, new exterior covered outdoor space, interior renovation of ground floor public spaces, basement parking restriping. ** maher: n/a ** | $6,300,000 |
| Oct 10, 2018 | Completed final sign-off Aug 2019 | 5 The Embarcadero | Hathaway Dinwiddie Co. | fitness center, removal of wall, replacement of selected floor finishes, new wall finishes, ceiling, doors and selected lighting. all upgraded areas will be reconfigured to comply w/ accessibility requirements per 2016 cbc. maher n/aDetails
fitness center, removal of wall, replacement of selected floor finishes, new wall finishes, ceiling, doors and selected lighting. all upgraded areas will be reconfigured to comply w/ accessibility requirements per 2016 cbc. maher n/a | $210,000 |
| Dec 12, 2017 | Expired or cancelled cancelled Jan 2026 | 5 The Embarcadero | modification to 225 guestroom guardrails majer naDetails
modification to 225 guestroom guardrails majer na | $440,000 | |
| Aug 9, 2017 | Completed final sign-off Apr 2018 | 333 Ofarrell St | Cw Horton General Contractor | 8th floor - conversion of office space, which was originally guest rooms back to guest rooms. no additional quantity of rooms being added. mep & life safety separate permit. n/a maher ordinance. work in rooms 831, 832, 8/f, tower 3Details
8th floor - conversion of office space, which was originally guest rooms back to guest rooms. no additional quantity of rooms being added. mep & life safety separate permit. n/a maher ordinance. work in rooms 831, 832, 8/f, tower 3 | $157,007 |
| Aug 8, 2017 | Completed final sign-off Feb 2018 | 333 Ofarrell St | Cw Horton General Contractor | floors 5,8,9,10,11,12,14 - replacement of (e) guest room & back of house doors. n/a maher ordinanceDetails
floors 5,8,9,10,11,12,14 - replacement of (e) guest room & back of house doors. n/a maher ordinance | $991,007 |