Ronald Laurence
- Listed as
- engineer
- Firm
- Stantec Consulting Services
- Based in
- Petaloma
- On San Francisco permits
- Sep 2009 to May 2018
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2018 | Completed final sign-off Aug 2018 | 555 Selby St | add as built drawings to application #201606281054 s8/r-1. this was requested by sffd inspector. maher naDetails
add as built drawings to application #201606281054 s8/r-1. this was requested by sffd inspector. maher na | ||
| Apr 21, 2011 | Completed final sign-off May 2013 | 555 Pine St | Roebbelen Contracting Inc | upgrades (e)standby generator fueling sys:(n)supply&return piping to bush st 555 pine st: replace leaking piping in bsmt,add redundant fuel supply piping,replace(e)pump sys feeding 430 bush st.facility,upsize retrn piping,upgrade monitor sys.install (n) secondary containment.Details
upgrades (e)standby generator fueling sys:(n)supply&return piping to bush st 555 pine st: replace leaking piping in bsmt,add redundant fuel supply piping,replace(e)pump sys feeding 430 bush st.facility,upsize retrn piping,upgrade monitor sys.install (n) secondary containment. | $75,000 |
| Apr 20, 2011 | Completed final sign-off May 2013 | 430 Bush St | Gettler-Ryan Inc | upgrades to (e) standby generator fueling system: (n) fuel supply and return lines from/to 555 pine st. basementDetails
upgrades to (e) standby generator fueling system: (n) fuel supply and return lines from/to 555 pine st. basement | $75,000 |
| Sep 15, 2009 | Completed final sign-off Jun 2010 | 360 Spear St | Gettler-Ryan Inc | remove (e)400 gal generator base fuel tank from roof,replace w/ (n) 200 gal.dw steel day tank, dw piping from day tank to (e)generator within (e) 15ft high metal enclosure. (n)veeder root tls-350 tank monitoring panel/sensors for all (e) & (n)at&t owned fuel sys sensors/probes. sffd permit requiredDetails
remove (e)400 gal generator base fuel tank from roof,replace w/ (n) 200 gal.dw steel day tank, dw piping from day tank to (e)generator within (e) 15ft high metal enclosure. (n)veeder root tls-350 tank monitoring panel/sensors for all (e) & (n)at&t owned fuel sys sensors/probes. sffd permit required | $100,000 |