Roberta Morgan
- Listed as
- contractor, designer, engineer, pmt consultant/expediter
- Firm
- Bay Air Systems, Inc
- Based in
- Concord
- On San Francisco permits
- Jun 2004 to Sep 2026
25 permits since 2000 (contractor on 20 permits, designer on 4 permits, engineer on 3 permits, pmt consultant/expediter on 1 permit): 12 completed, 7 in progress, 5 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 180 Howard St | Metcon Ti, Inc | mechanical: install (n) low-pressure duct and air distribution to meet new ti layout. install (3) new terminal units to meet new zoning plan. electrical: new power & signal devices througout, (n) 2025 title-24 compliant ligting & controls. plumbing: replace fixtures at (e) locations. install (n)Details
mechanical: install (n) low-pressure duct and air distribution to meet new ti layout. install (3) new terminal units to meet new zoning plan. electrical: new power & signal devices througout, (n) 2025 title-24 compliant ligting & controls. plumbing: replace fixtures at (e) locations. install (n) | $125,000 |
| Jul 23, 2026 | In progress issued Aug 2026 | 2101 Mission St | Bay Air Systems, Inc | plumbing associated with 202602266554l. deferred plumbing as part of mepDetails
plumbing associated with 202602266554l. deferred plumbing as part of mep | |
| Jul 8, 2026 | In progress issued Jul 2026 | 2101 Mission St | Buildtech West | suite 100 and 210: deferred electrical for permit 202602266554Details
suite 100 and 210: deferred electrical for permit 202602266554 | $100,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 180 Howard St | Metcon Ti, Inc | 9th flr: deferred mep drawings. mech-install new low pressure duct & air distribution to meet new tenant improvement layout. install (7) new terminal units to meet new zoning plan. electrical-new power & signal devices throughout space. ref pa# 202605191531Details
9th flr: deferred mep drawings. mech-install new low pressure duct & air distribution to meet new tenant improvement layout. install (7) new terminal units to meet new zoning plan. electrical-new power & signal devices throughout space. ref pa# 202605191531 | $250,000 |
| Jun 4, 2026 | In progress issued Jul 2026 | 33 New Montgomery St | Metcon Ti, Inc | ste. #350: lounge improvement for building amenity space. new walls, lighting, floor finishes and install of new owner golf and racing simulators.Details
ste. #350: lounge improvement for building amenity space. new walls, lighting, floor finishes and install of new owner golf and racing simulators. | $175,000 |
| Apr 30, 2026 | Completed final sign-off Aug 2026 | 188 Octavia St | Bay Air Systems, Inc | installing heating gas furnace system with ductwork for suite bDetails
installing heating gas furnace system with ductwork for suite b | $27,000 |
| Apr 2, 2026 | In progress issued Apr 2026 | 2101 Mission St | Bay Air Systems, Inc | install new mechanical heating & cooling systom for 1st & 2nd fl, ste 100 & 200. fan coils weight 67 lbs, condensing unit 775 lbs. ref arch pa# 202602266554Details
install new mechanical heating & cooling systom for 1st & 2nd fl, ste 100 & 200. fan coils weight 67 lbs, condensing unit 775 lbs. ref arch pa# 202602266554 | $250,000 |
| Apr 2, 2026 | In progress issued Apr 2026 | 2101 Mission St | Bay Air Systems, Inc | suite 108b. heating and cooling system. ref pa# 202603207998.Details
suite 108b. heating and cooling system. ref pa# 202603207998. | $25,000 |
| Mar 10, 2026 | Completed final sign-off Jul 2026 | 180 Howard St | Metcon Ti, Inc | 8/fl: mech:replace low pressure ductwork for whole floor, install 6 new terminal units. elec:new power & signal devices throughout. new title 24 compliant lighting & controls. plumbing: replace (e) lav fixtures at (e) locations in women's rrs. install new plumbing piping to fixtures. ref202512192286Details
8/fl: mech:replace low pressure ductwork for whole floor, install 6 new terminal units. elec:new power & signal devices throughout. new title 24 compliant lighting & controls. plumbing: replace (e) lav fixtures at (e) locations in women's rrs. install new plumbing piping to fixtures. ref202512192286 | $150,000 |
| Sep 17, 2020 | Completed final sign-off Nov 2020 | 840 Battery St | Bay Air Systems, Inc | replacement of 2 rooftop package hvac system.Details
replacement of 2 rooftop package hvac system. | $162,590 |
| Sep 17, 2020 | Completed final sign-off Dec 2020 | 251 Rhode Island St | Bay Air Systems, Inc | replacement of rooftop hvac unit.Details
replacement of rooftop hvac unit. | $73,500 |
| Dec 31, 2019 | Completed final sign-off Feb 2020 | 1098 Harrison St | Bay Air Systems, Inc | as built fire alarm ref 201912048653Details
as built fire alarm ref 201912048653 | |
| Dec 4, 2019 | Completed final sign-off Feb 2020 | 1098 Harrison St | Bay Air Systems, Inc | phase 3 of tenant improvement fire life safety.Details
phase 3 of tenant improvement fire life safety. | |
| Sep 19, 2019 | Completed final sign-off Mar 2020 | 1098 Harrison St | Bay Air Systems, Inc | phase 2 of ti, fire alarm (fls)Details
phase 2 of ti, fire alarm (fls) | |
| Aug 29, 2019 | Completed final sign-off Feb 2020 | 1098 Harrison St | Bay Air Systems, Inc | revision & as builts to 201908027674 reflecting deleted devices, new seq of operations, change scope from full building alarm to a 3 phase installation of which this is phase one. only work being done on this permit: changing dial-out to cellular dialer.Details
revision & as builts to 201908027674 reflecting deleted devices, new seq of operations, change scope from full building alarm to a 3 phase installation of which this is phase one. only work being done on this permit: changing dial-out to cellular dialer. | $1,000 |
| Aug 2, 2019 | Completed final sign-off Sep 2019 | 1098 Harrison St | Bay Air Systems, Inc | install new fire alarm system. ref pa#201906183685. maher ord 155-13 naDetails
install new fire alarm system. ref pa#201906183685. maher ord 155-13 na | $165,000 |
| May 1, 2019 | Never finaled issued May 2019, no final | 840 Battery St | Bay Air Systems, Inc | replace 4 ac units at roof. n/a for maher.Details
replace 4 ac units at roof. n/a for maher. | $84,500 |
| Sep 18, 2018 | Completed final sign-off Jan 2020 | 1098 Harrison St | Bay Air Systems, Inc | hvac system retrofitDetails
hvac system retrofit | $1,200,000 |
| May 20, 2015 | Never finaled issued May 2015, no final | 1580 16th St | Bay Air Systems, Inc | replacement of roof top packaged electric heat pump units ac units. maher ordinance # 155-13 n/a. previous units under pa# 201409025185 (final 5/20/15)Details
replacement of roof top packaged electric heat pump units ac units. maher ordinance # 155-13 n/a. previous units under pa# 201409025185 (final 5/20/15) | $77,950 |
| Sep 2, 2014 | Completed final sign-off May 2015 | 251 Rhode Island St | Bay Air Systems, Inc | replacement of roof top packaged electric heat pump units. maher ordinance # 155-13 n/a.Details
replacement of roof top packaged electric heat pump units. maher ordinance # 155-13 n/a. | $173,250 |
| Jun 17, 2014 | Never finaled issued Aug 2014, no final | 170 Columbus Av | Bay Air Systems, Inc | replace 150 ton air-cooled chiller on rooftop including steel base frame, disconnect and reconnect chilled water lines and electrical at chiller.Details
replace 150 ton air-cooled chiller on rooftop including steel base frame, disconnect and reconnect chilled water lines and electrical at chiller. | $165,000 |
| Feb 6, 2013 | Never finaled issued Feb 2013, no final | 840 Battery St | Bay Air Systems, Inc | 1st floor & roof-revision to pa# 2012-0830-8583-add 3 cooling only , 3 tons dx split system units serving 1st floorDetails
1st floor & roof-revision to pa# 2012-0830-8583-add 3 cooling only , 3 tons dx split system units serving 1st floor | $40,000 |
| Aug 30, 2012 | Never finaled issued Sep 2012, no final | 840 Battery St | Bay Air Systems, Inc | 1st floor & roof, mech & structural, 1st floor, mech upgrade and chiller work on roof. ref. t.i. 201208157467Details
1st floor & roof, mech & structural, 1st floor, mech upgrade and chiller work on roof. ref. t.i. 201208157467 | $296,250 |
| Feb 6, 2012 | Completed final sign-off May 2012 | 2201 Chestnut St | Bay Air Systems, Inc | alteration of existing kitchen hood system, relocate & replace exhaust fan, replace make-up air fan, relocate make-up air diffusers.Details
alteration of existing kitchen hood system, relocate & replace exhaust fan, replace make-up air fan, relocate make-up air diffusers. | $10,000 |
| Jun 22, 2004 | Expired or cancelled expired Apr 2006 | 2172 Mission St | Bay Air Systems, Inc | install 4 vac system/lighting and t-24 under separate permitDetails
install 4 vac system/lighting and t-24 under separate permit | $12,000 |