Permit GraphShortlistSan Francisco building permits since 2000

Robert Pekelnicky

License
S5083
Look the license up with the state
Listed as
engineer
Firm
Degenkolb Engineers
Based in
San Francisco
On San Francisco permits
Jun 2015 to Sep 2026

10 permits since 2000 (engineer on 10 permits): 8 completed, 1 in progress, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 11, 2026In progress
filed Sep 2026, not yet issued
101 Spear Stsite permit to enable peer review. full seismic retroift to (e) building to conform to 2025 sfbc section 304.3.2 for risk category ii using asce 41-23 nonlinear dynamic procedure. remodel of (e) seismic support structures as required for seismic work. remove & replace (e) walls & finishes to allow
Details
Permit
202608317472
Status
filed
Filed
Sep 11, 2026
Declared cost
$15,000,000
Address
101 Spear St

site permit to enable peer review. full seismic retroift to (e) building to conform to 2025 sfbc section 304.3.2 for risk category ii using asce 41-23 nonlinear dynamic procedure. remodel of (e) seismic support structures as required for seismic work. remove & replace (e) walls & finishes to allow

Open the permit page

$15,000,000
Feb 2, 2022Completed
final sign-off Oct 2023
600 Montgomery StHathaway Dinwiddie Co.new leasing gallery and exhibition space on 36th fl consisting of new non-structural interior partitions, ceilings lighting, fixtures, millwork & finishes.
Details
Permit
202202027197
Status
complete
Filed
Feb 2, 2022
Permit issued
Mar 22, 2022
Final sign-off
Oct 2, 2023
Declared cost
$415,708
Address
600 Montgomery St

new leasing gallery and exhibition space on 36th fl consisting of new non-structural interior partitions, ceilings lighting, fixtures, millwork & finishes.

Open the permit page

$415,708
May 21, 2021Completed
final sign-off May 2023
188 The EmbarcaderoPlant Construction Co, Lpvoluntary seismic upgrade to an existing 8-story concrete office building w/a basement parking garage. structural improvements include installing concrete shear walls,collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)column
Details
Permit
202105210786
Status
complete
Filed
May 21, 2021
Permit issued
Dec 1, 2021
Final sign-off
May 24, 2023
Declared cost
$6,000,000
Address
188 The Embarcadero

voluntary seismic upgrade to an existing 8-story concrete office building w/a basement parking garage. structural improvements include installing concrete shear walls,collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)column

Open the permit page

$6,000,000
May 13, 2021Completed
final sign-off Oct 2022
350 California StPlant Construction Co, Lpvoluntary seismic retrofit-phase 5; at 7th, 8th, & 16th floor
Details
Permit
202105130318
Status
complete
Filed
May 13, 2021
Permit issued
Jul 28, 2021
Final sign-off
Oct 7, 2022
Declared cost
$1,500,000
Address
350 California St

voluntary seismic retrofit-phase 5; at 7th, 8th, & 16th floor

Open the permit page

$1,500,000
Nov 21, 2019Completed
final sign-off Sep 2024
350 California StPlant Construction Co, Lpvoluntary seismic retrofit phase 3 - 6th, 11th, 14th and 15th floor
Details
Permit
201911217894
Status
complete
Filed
Nov 21, 2019
Permit issued
Jan 10, 2020
Final sign-off
Sep 18, 2024
Declared cost
$1,000,000
Address
350 California St

voluntary seismic retrofit phase 3 - 6th, 11th, 14th and 15th floor

Open the permit page

$1,000,000
Jul 10, 2019Completed
final sign-off Sep 2022
600 Montgomery StHathaway Dinwiddie Co.alteration of the (e) interior steel framing on floors 51-60 to add maintenance platforms at various levels. floors 45-50 voluntary structural strengthening, floors 51-60 voluntary structural strengthening. ab-017 applies to this project
Details
Permit
201907105505
Status
complete
Filed
Jul 10, 2019
Permit issued
Jul 25, 2019
Final sign-off
Sep 16, 2022
Declared cost
$4,800,000
Address
600 Montgomery St

alteration of the (e) interior steel framing on floors 51-60 to add maintenance platforms at various levels. floors 45-50 voluntary structural strengthening, floors 51-60 voluntary structural strengthening. ab-017 applies to this project

Open the permit page

$4,800,000
Jun 11, 2019Completed
final sign-off Jun 2022
350 California StPlant Construction Co, Lpt.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maher
Details
Permit
201906113057
Status
complete
Filed
Jun 11, 2019
Permit issued
Jul 16, 2019
Final sign-off
Jun 22, 2022
Declared cost
$1,300,000
Address
350 California St

t.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maher

Open the permit page

$1,300,000
Jul 6, 2016Completed
final sign-off Nov 2017
222 Mason StTakenaka Corporation U S Athis scope is phase 2 of a voluntary structural strengthening & consists of the addition of grider catch seats under level 2 & 5 structural slabs & related demo & construction of walls, floor & ceiling on level 1 & 4 around new seismic members.no change in occupancy,occ load & egress
Details
Permit
201607061684
Status
complete
Filed
Jul 6, 2016
Permit issued
Oct 14, 2016
Final sign-off
Nov 21, 2017
Declared cost
$220,000
Address
222 Mason St

this scope is phase 2 of a voluntary structural strengthening & consists of the addition of grider catch seats under level 2 & 5 structural slabs & related demo & construction of walls, floor & ceiling on level 1 & 4 around new seismic members.no change in occupancy,occ load & egress

Open the permit page

$220,000
Feb 18, 2016Never finaled
issued Dec 2016, no final
222 Sansome StHathaway Dinwiddie Co.interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13
Details
Permit
201602189863
Status
issued
Filed
Feb 18, 2016
Permit issued
Dec 28, 2016
Declared cost
$850,000
Address
222 Sansome St

interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13

Open the permit page

$850,000
Jun 22, 2015Completed
final sign-off Jan 2018
222 Mason StGoike Construction Managementmodification to (e) 3' seismic joint at floors 3,4 & 5 as part of a voluntary seismic retrofit. work includes lengthening beam seats at 3rd 4th & 5th flrs from pool structure to the tower structure, cutting slab at pool to struture around columns & associated finish removal & replacements.
Details
Permit
201506229527
Status
complete
Filed
Jun 22, 2015
Permit issued
Dec 2, 2015
Final sign-off
Jan 31, 2018
Declared cost
$175,000
Address
222 Mason St

modification to (e) 3' seismic joint at floors 3,4 & 5 as part of a voluntary seismic retrofit. work includes lengthening beam seats at 3rd 4th & 5th flrs from pool structure to the tower structure, cutting slab at pool to struture around columns & associated finish removal & replacements.

Open the permit page

$175,000