Robert Pekelnicky
- Listed as
- engineer
- Firm
- Degenkolb Engineers
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Sep 2026
10 permits since 2000 (engineer on 10 permits): 8 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 101 Spear St | site permit to enable peer review. full seismic retroift to (e) building to conform to 2025 sfbc section 304.3.2 for risk category ii using asce 41-23 nonlinear dynamic procedure. remodel of (e) seismic support structures as required for seismic work. remove & replace (e) walls & finishes to allowDetails
site permit to enable peer review. full seismic retroift to (e) building to conform to 2025 sfbc section 304.3.2 for risk category ii using asce 41-23 nonlinear dynamic procedure. remodel of (e) seismic support structures as required for seismic work. remove & replace (e) walls & finishes to allow | $15,000,000 | |
| Feb 2, 2022 | Completed final sign-off Oct 2023 | 600 Montgomery St | Hathaway Dinwiddie Co. | new leasing gallery and exhibition space on 36th fl consisting of new non-structural interior partitions, ceilings lighting, fixtures, millwork & finishes.Details
new leasing gallery and exhibition space on 36th fl consisting of new non-structural interior partitions, ceilings lighting, fixtures, millwork & finishes. | $415,708 |
| May 21, 2021 | Completed final sign-off May 2023 | 188 The Embarcadero | Plant Construction Co, Lp | voluntary seismic upgrade to an existing 8-story concrete office building w/a basement parking garage. structural improvements include installing concrete shear walls,collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)columnDetails
voluntary seismic upgrade to an existing 8-story concrete office building w/a basement parking garage. structural improvements include installing concrete shear walls,collectors[i.e. steel, concrete, and fiberglass reinforced polymer (frp)] & fiberglass reinforced polymer(frp)column | $6,000,000 |
| May 13, 2021 | Completed final sign-off Oct 2022 | 350 California St | Plant Construction Co, Lp | voluntary seismic retrofit-phase 5; at 7th, 8th, & 16th floorDetails
voluntary seismic retrofit-phase 5; at 7th, 8th, & 16th floor | $1,500,000 |
| Nov 21, 2019 | Completed final sign-off Sep 2024 | 350 California St | Plant Construction Co, Lp | voluntary seismic retrofit phase 3 - 6th, 11th, 14th and 15th floorDetails
voluntary seismic retrofit phase 3 - 6th, 11th, 14th and 15th floor | $1,000,000 |
| Jul 10, 2019 | Completed final sign-off Sep 2022 | 600 Montgomery St | Hathaway Dinwiddie Co. | alteration of the (e) interior steel framing on floors 51-60 to add maintenance platforms at various levels. floors 45-50 voluntary structural strengthening, floors 51-60 voluntary structural strengthening. ab-017 applies to this projectDetails
alteration of the (e) interior steel framing on floors 51-60 to add maintenance platforms at various levels. floors 45-50 voluntary structural strengthening, floors 51-60 voluntary structural strengthening. ab-017 applies to this project | $4,800,000 |
| Jun 11, 2019 | Completed final sign-off Jun 2022 | 350 California St | Plant Construction Co, Lp | t.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maherDetails
t.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maher | $1,300,000 |
| Jul 6, 2016 | Completed final sign-off Nov 2017 | 222 Mason St | Takenaka Corporation U S A | this scope is phase 2 of a voluntary structural strengthening & consists of the addition of grider catch seats under level 2 & 5 structural slabs & related demo & construction of walls, floor & ceiling on level 1 & 4 around new seismic members.no change in occupancy,occ load & egressDetails
this scope is phase 2 of a voluntary structural strengthening & consists of the addition of grider catch seats under level 2 & 5 structural slabs & related demo & construction of walls, floor & ceiling on level 1 & 4 around new seismic members.no change in occupancy,occ load & egress | $220,000 |
| Feb 18, 2016 | Never finaled issued Dec 2016, no final | 222 Sansome St | Hathaway Dinwiddie Co. | interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13Details
interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13 | $850,000 |
| Jun 22, 2015 | Completed final sign-off Jan 2018 | 222 Mason St | Goike Construction Management | modification to (e) 3' seismic joint at floors 3,4 & 5 as part of a voluntary seismic retrofit. work includes lengthening beam seats at 3rd 4th & 5th flrs from pool structure to the tower structure, cutting slab at pool to struture around columns & associated finish removal & replacements.Details
modification to (e) 3' seismic joint at floors 3,4 & 5 as part of a voluntary seismic retrofit. work includes lengthening beam seats at 3rd 4th & 5th flrs from pool structure to the tower structure, cutting slab at pool to struture around columns & associated finish removal & replacements. | $175,000 |