Takenaka Corporation U S A
- Based in
- Itasca
- On San Francisco permits
- Jul 2016 to Sep 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2016 | Completed final sign-off Jan 2018 | 222 Mason St | this scope is phase 3 of voluntary seismic retrofit & consist of strengthening of (e) column splices along the tower perimeter & the demolition. construction of walls in these area. no change in occupancy, occ load, or egress. no exterior work. fire life safety under separate permit.Details
this scope is phase 3 of voluntary seismic retrofit & consist of strengthening of (e) column splices along the tower perimeter & the demolition. construction of walls in these area. no change in occupancy, occ load, or egress. no exterior work. fire life safety under separate permit. | $350,000 |
| Jul 6, 2016 | Completed final sign-off Nov 2017 | 222 Mason St | this scope is phase 2 of a voluntary structural strengthening & consists of the addition of grider catch seats under level 2 & 5 structural slabs & related demo & construction of walls, floor & ceiling on level 1 & 4 around new seismic members.no change in occupancy,occ load & egressDetails
this scope is phase 2 of a voluntary structural strengthening & consists of the addition of grider catch seats under level 2 & 5 structural slabs & related demo & construction of walls, floor & ceiling on level 1 & 4 around new seismic members.no change in occupancy,occ load & egress | $220,000 |