Robert Hayes
- Listed as
- architect, engineer
- Firm
- Robert W. Hayes & Assoc
- Based in
- Sausalito
- On San Francisco permits
- Dec 2007 to Dec 2020
8 permits since 2000 (architect on 7 permits, engineer on 1 permit): 4 completed, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2020 | Never finaled issued Jun 2021, no final | 350 09th Av | Thompson Builders Corp | priority process for school: voluntary structural strengthening, accessibility upgrades, installation of a lula.Details
priority process for school: voluntary structural strengthening, accessibility upgrades, installation of a lula. | $700,000 |
| Sep 10, 2019 | Expired or cancelled withdrawn Nov 2019 | 2550 18th Av | voluntary seismic strengthening of st cecillia school per ord# 202-14. this permit is for phase 3 exterior construction to be completed summer of 2020.Details
voluntary seismic strengthening of st cecillia school per ord# 202-14. this permit is for phase 3 exterior construction to be completed summer of 2020. | $485,000 | |
| Mar 26, 2018 | Completed final sign-off Sep 2018 | 2550 18th Av | Sc Builders, Inc | priority processing. voluntary structural strengthening per ord#202-14 summer 2018 scope at interior & roof only. remove interior clay tile & replace w/ steel,studs and jepwalls. no final completion until required accessibility upgrade are completed under permits. non-struct items not retrofittedDetails
priority processing. voluntary structural strengthening per ord#202-14 summer 2018 scope at interior & roof only. remove interior clay tile & replace w/ steel,studs and jepwalls. no final completion until required accessibility upgrade are completed under permits. non-struct items not retrofitted | $825,000 |
| Nov 10, 2017 | Completed final sign-off Dec 2020 | 2550 18th Av | this is a site permit. project is the voluntary seismic strenghtening for st. cecilia school. the project includes new concrete shear walls & new wheelchair lift and enclosure.Details
this is a site permit. project is the voluntary seismic strenghtening for st. cecilia school. the project includes new concrete shear walls & new wheelchair lift and enclosure. | $50,000 | |
| Aug 12, 2013 | Completed final sign-off Jun 2014 | 1045 Mason St | R W Collings General Contractor | renovation of extg apartment with new finishes at master bathroom, bathroom and powder room, new cabinetry at kitchen, new light fixtures. replace in kind and new plmbg fixtures replaced in kind throughout.Details
renovation of extg apartment with new finishes at master bathroom, bathroom and powder room, new cabinetry at kitchen, new light fixtures. replace in kind and new plmbg fixtures replaced in kind throughout. | $45,000 |
| Jan 12, 2010 | Expired or cancelled cancelled Jan 2012 | 473 Eucalyptus Dr | Nibbi Bros Assoc Inc. | to erect non electric, single face sign.Details
to erect non electric, single face sign. | $1,000 |
| Jan 12, 2010 | Expired or cancelled cancelled Dec 2011 | 473 Eucalyptus Dr | Nibbi Bros Assoc Inc. | new statue pedestal to be used as sign. no electrification. no obstructions shown on plan. no fire inspection required. reference p/a 201001124608 form 4 (green sheet-sign)Details
new statue pedestal to be used as sign. no electrification. no obstructions shown on plan. no fire inspection required. reference p/a 201001124608 form 4 (green sheet-sign) | $5,500 |
| Dec 4, 2007 | Completed final sign-off May 2010 | 473 Eucalyptus Dr | Demex Engineering, Inc | erect a 2 story gymnasium / assembly hall.Details
erect a 2 story gymnasium / assembly hall. | $3,500,000 |