R W Collings General Contractor
- Based in
- Corte Medema
- On San Francisco permits
- Aug 2013 to Mar 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2015 | Completed final sign-off Mar 2016 | 465 36th Av | demo (e) guest bathroom & install updates 3rd (top floor). update fixtures, plumbing & electrical. new shower pan, tile shower walls, tile shower floor, tile bathroom floor, new bathroom fixtures. frame in (e) secondary doorway.Details
demo (e) guest bathroom & install updates 3rd (top floor). update fixtures, plumbing & electrical. new shower pan, tile shower walls, tile shower floor, tile bathroom floor, new bathroom fixtures. frame in (e) secondary doorway. | $22,000 |
| Aug 12, 2013 | Completed final sign-off Jun 2014 | 1045 Mason St | renovation of extg apartment with new finishes at master bathroom, bathroom and powder room, new cabinetry at kitchen, new light fixtures. replace in kind and new plmbg fixtures replaced in kind throughout.Details
renovation of extg apartment with new finishes at master bathroom, bathroom and powder room, new cabinetry at kitchen, new light fixtures. replace in kind and new plmbg fixtures replaced in kind throughout. | $45,000 |