1,284 permits since 2000 (contractor on 1,284 permits, authorized agent-others on 15 permits): 1,105 completed, 33 in progress, 62 never finaled, 84 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 1,284.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress issued Oct 2026 | 201 Mission St | Richlen Construction | suites 2700 & 2750 interior demo & construction of elements including but not limited to interior partitions, doors finishes, acoustic ceiings, open ceiilngs & light fixtures. alteration work to rr's elev lobby & common corridor on 27th floor. path of travel approved separated under pa 202303012812Details
suites 2700 & 2750 interior demo & construction of elements including but not limited to interior partitions, doors finishes, acoustic ceiings, open ceiilngs & light fixtures. alteration work to rr's elev lobby & common corridor on 27th floor. path of travel approved separated under pa 202303012812 | $715,000 |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 343 Sansome St | Richlen Construction | 9/fl- mechanical scope ti ductwork and air outlet modifications. (n) vav box , cooling only vav box. (n) lighting fixture and associated circuiting/controls. power and signal devices and associated wiring.Details
9/fl- mechanical scope ti ductwork and air outlet modifications. (n) vav box , cooling only vav box. (n) lighting fixture and associated circuiting/controls. power and signal devices and associated wiring. | $200,000 |
| Sep 17, 2026 | In progress issued Sep 2026 | 50 California St | Richlen Construction | existing interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical, mechanical and plumbing fixtures, new drinking foundation and single user restroom.Details
existing interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical, mechanical and plumbing fixtures, new drinking foundation and single user restroom. | $3,942,870 |
| Sep 11, 2026 | In progress issued Sep 2026 | 201 Mission St | Richlen Construction | mech: replace duct work, transfer fan relocation, supply air diffusers, rework flexible inlet duct connectors, install new balancing dampers where required. check all hvac equip. elec: new lighting fixtures and associated circuiting /controls, new power and signal devices and associated wiring. refDetails
mech: replace duct work, transfer fan relocation, supply air diffusers, rework flexible inlet duct connectors, install new balancing dampers where required. check all hvac equip. elec: new lighting fixtures and associated circuiting /controls, new power and signal devices and associated wiring. ref | $337,875 |
| Sep 11, 2026 | In progress issued Sep 2026 | 221 Main St | Richlen Construction | new lobby level security improvements-installing turnstilesDetails
new lobby level security improvements-installing turnstiles | $250,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 201 Mission St | Richlen Construction | ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical.Details
ref demo permit#: 202602055297. scope new concrete slb on grade, strucutural concrete, install pergola (separately) with footing. not include civil, mech, and electrical. | $322,135 |
| Aug 20, 2026 | In progress issued Sep 2026 | 50 California St | Richlen Construction | suit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures.Details
suit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electrical, mechanical, & plumbing fixtures. | $859,574 |
| Aug 20, 2026 | In progress issued Sep 2026 | 525 Market St | Richlen Construction | 15th fl - demo only permit (interior) accessibility per ab-017Details
15th fl - demo only permit (interior) accessibility per ab-017 | $30,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 201 California St | Richlen Construction | ste 1100 11/f: includes new construction of conf rooms, huddle, phone & break area. mep will be submitted as a separate permit. scope does not alter fixture quantities, occ load, calcs or path of travel.Details
ste 1100 11/f: includes new construction of conf rooms, huddle, phone & break area. mep will be submitted as a separate permit. scope does not alter fixture quantities, occ load, calcs or path of travel. | $1,335,500 |
| Jul 7, 2026 | Completed final sign-off Jul 2026 | 201 California St | Richlen Construction | ste 1500 15/f revised coversheet in ref to pa# 202510026577: clarifying no deferred submittals required for mechanical and plumbing.Details
ste 1500 15/f revised coversheet in ref to pa# 202510026577: clarifying no deferred submittals required for mechanical and plumbing. | |
| Jun 25, 2026 | In progress issued Jul 2026 | 221 Main St | Richlen Construction | deferred electrical for 4th floor suite 400 office ti under permit 202604028757.Details
deferred electrical for 4th floor suite 400 office ti under permit 202604028757. | $175,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 221 Main St | Richlen Construction | suite 400: reconfigure existing ductwork, ceiling diffusers, and grilles. provided vav boxes and suspended transfer air fan.Details
suite 400: reconfigure existing ductwork, ceiling diffusers, and grilles. provided vav boxes and suspended transfer air fan. | $75,000 |
| Jun 24, 2026 | In progress issued Aug 2026 | 201 Mission St | Richlen Construction | 14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits.Details
14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits. | $285,000 |
| Jun 23, 2026 | In progress issued Jul 2026 | 650 California St | Richlen Construction | 27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire sprinkler and alarm are deffered submittals.Details
27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire sprinkler and alarm are deffered submittals. | $1,184,490 |
| Jun 17, 2026 | Completed final sign-off Jul 2026 | 201 Mission St | Richlen Construction | 23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location.Details
23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location. | $56,543 |
| Jun 5, 2026 | Completed final sign-off Aug 2026 | 650 California St | Richlen Construction | 20th floor: mechanical and electrical work install 2 new cooling vav vox and ductwork air distribution. provide new lighting. ref 202602246378Details
20th floor: mechanical and electrical work install 2 new cooling vav vox and ductwork air distribution. provide new lighting. ref 202602246378 | $100,000 |
| Jun 4, 2026 | Completed final sign-off Sep 2026 | 201 Mission St | Richlen Construction | 21 fl - ste: 2150 - hvac relocate (e) difusers, air grills, modify heat pump add thermostats. mech deferred for 202605201639Details
21 fl - ste: 2150 - hvac relocate (e) difusers, air grills, modify heat pump add thermostats. mech deferred for 202605201639 | $60,000 |
| Jun 4, 2026 | Completed final sign-off Sep 2026 | 201 Mission St | Richlen Construction | 21fl - ste 2150: def electrical for 202605201639 : new light fixtures and ciruits/ controls new power signal devices.Details
21fl - ste 2150: def electrical for 202605201639 : new light fixtures and ciruits/ controls new power signal devices. | $127,465 |
| Jun 4, 2026 | Completed final sign-off Oct 2026 | 575 Market St | Richlen Construction | 3rd floor. ref: 202605070841. new lighting fixtures, controls in 2 new enclosed office. new power/teledata feeds for new work stations, new receptacles and associated wiring in existing conference rooms and enclosed office.Details
3rd floor. ref: 202605070841. new lighting fixtures, controls in 2 new enclosed office. new power/teledata feeds for new work stations, new receptacles and associated wiring in existing conference rooms and enclosed office. | $20,125 |
| Jun 4, 2026 | Completed final sign-off Aug 2026 | 201 Mission St | Richlen Construction | 22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles.Details
22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles. | $190,288 |
| May 20, 2026 | Completed final sign-off Sep 2026 | 201 Mission St | Richlen Construction | 21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approvedDetails
21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved | $218,435 |
| May 7, 2026 | Completed final sign-off Oct 2026 | 575 Market St | Richlen Construction | 3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new light fixtures & switching new power/ data and finishesDetails
3rd floor: this project involves modification of (e) ti to include construction of new non-load bearing partitions, new door, frames and hardware modification of (e) ceiing tile & grd system, new light fixtures & switching new power/ data and finishes | $200,000 |
| Apr 23, 2026 | Completed final sign-off Aug 2026 | 201 Mission St | Richlen Construction | floor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit.Details
floor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit. | $341,000 |
| Apr 7, 2026 | Completed final sign-off Jul 2026 | 201 California St | Richlen Construction | 15th fl - provide new lighting @ ste 1500 ref pa 202510026577Details
15th fl - provide new lighting @ ste 1500 ref pa 202510026577 | $190,000 |
| Apr 2, 2026 | Completed final sign-off Aug 2026 | 631 Howard St | Richlen Construction | basement and 2nd flr - new power and signal devices in space. ref#: 202512222436 and 202512192339. (electrical sheets)Details
basement and 2nd flr - new power and signal devices in space. ref#: 202512222436 and 202512192339. (electrical sheets) | $197,607 |
| Apr 2, 2026 | In progress issued Apr 2026 | 221 Main St | Richlen Construction | 4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not affect fixture quantities, occ load or p.o.t. no exterior work.Details
4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not affect fixture quantities, occ load or p.o.t. no exterior work. | $238,237 |
| Mar 19, 2026 | Completed final sign-off Jul 2026 | 575 Market St | Richlen Construction | 30/f: mechanical and electrical permit to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref pa# 202601274610.Details
30/f: mechanical and electrical permit to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref pa# 202601274610. | $30,000 |
| Mar 12, 2026 | In progress issued Apr 2026 | 631 Howard St | Richlen Construction | basement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is existingDetails
basement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is existing | $155,000 |
| Mar 9, 2026 | Completed final sign-off Jun 2026 | 201 Mission St | Richlen Construction | suite 2350: deferred mep for pa # 2026-0121-4223. new ducts & air distribution. new lighting, power & plumbing.Details
suite 2350: deferred mep for pa # 2026-0121-4223. new ducts & air distribution. new lighting, power & plumbing. | $25,000 |
| Feb 24, 2026 | Completed final sign-off Aug 2026 | 650 California St | Richlen Construction | ste# 2000/ 20th/f: selective demo & new const of interior partitions, doors, finishes, ceilings, lighting, electrical. scope of work included restroom accessibility upgrades. no exterior, site, landscaping or parking changes. fire life safety are deferredDetails
ste# 2000/ 20th/f: selective demo & new const of interior partitions, doors, finishes, ceilings, lighting, electrical. scope of work included restroom accessibility upgrades. no exterior, site, landscaping or parking changes. fire life safety are deferred | $707,557 |
| Feb 5, 2026 | Completed final sign-off Mar 2026 | 201 Mission St | Richlen Construction | patio demo. remove exisitng planting beds & security fencingDetails
patio demo. remove exisitng planting beds & security fencing | $46,484 |
| Jan 27, 2026 | Completed final sign-off Jul 2026 | 575 Market St | Richlen Construction | 30th fl. partial floor demo and construction of interior partitons, doors, finishes and ceilings. mep deferred.Details
30th fl. partial floor demo and construction of interior partitons, doors, finishes and ceilings. mep deferred. | $194,288 |
| Jan 22, 2026 | Completed final sign-off Jul 2026 | 201 Mission St | Richlen Construction | 23rd flr. mep permit for approved architectual scope. new fsd and supply diffusers. new lighting and power. ref pa#: 202510308608.Details
23rd flr. mep permit for approved architectual scope. new fsd and supply diffusers. new lighting and power. ref pa#: 202510308608. | $249,348 |
| Jan 21, 2026 | Completed final sign-off Jun 2026 | 201 Mission St | Richlen Construction | ste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permitsDetails
ste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permits | $255,000 |
| Dec 22, 2025 | Completed final sign-off Aug 2026 | 631 Howard St | Richlen Construction | 2nd floor: interior ti - removal of non-structural partitions and finishes. new partitions, finishes, and accessibility upgrades to restrooms.Details
2nd floor: interior ti - removal of non-structural partitions and finishes. new partitions, finishes, and accessibility upgrades to restrooms. | $112,400 |
| Dec 19, 2025 | In progress issued Feb 2026 | 631 Howard St | Richlen Construction | basement level: interior ti removal of non structrual partitions, finishes and millwork. new non structrual partitions, finishes, break room millwork and upgrade to restrooms for accessibilityDetails
basement level: interior ti removal of non structrual partitions, finishes and millwork. new non structrual partitions, finishes, break room millwork and upgrade to restrooms for accessibility | $275,900 |
| Dec 18, 2025 | In progress issued Jul 2026 | 201 Mission St | Richlen Construction | 1st floor: convert 2449 sqft of retail space to office to provide tenant amenities.Details
1st floor: convert 2449 sqft of retail space to office to provide tenant amenities. | $550,000 |
| Dec 15, 2025 | In progress issued Jul 2026 | 343 Sansome St | Richlen Construction | #950: new t.i. on 9th floor:includes demolition of existing office space: non structural partitions, doors, glazing, ceiling, lighting, millwork and finishes. mechanical, electrical, & plumbing submittals to be deferred.Details
#950: new t.i. on 9th floor:includes demolition of existing office space: non structural partitions, doors, glazing, ceiling, lighting, millwork and finishes. mechanical, electrical, & plumbing submittals to be deferred. | $840,000 |
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 901 Battery St | Richlen Construction | 1 floor - suite 100: interior ti. including new non-structural partitions, millwork, light fixtures and plumbing fixtures and finishes.Details
1 floor - suite 100: interior ti. including new non-structural partitions, millwork, light fixtures and plumbing fixtures and finishes. | $1,000,000 |
| Nov 19, 2025 | Completed final sign-off Jan 2026 | 575 Market St | Richlen Construction | 39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modification, construction of new full height demising partition, and new wall finishes to match existing.Details
39/f suite 3950: reduce size of an existing suite, creating 2 smaller suites. modification of (e) tenant improvements to include demolition of door and glazing system, minor ceiling, tile modification, construction of new full height demising partition, and new wall finishes to match existing. | $10,000 |
| Nov 7, 2025 | Completed final sign-off Jan 2026 | 201 Mission St | Richlen Construction | 5/f: administrative permit to revise scope of work per building inspector. verbiage change from mep deferred to no mep required. ref pa# 202510066828.Details
5/f: administrative permit to revise scope of work per building inspector. verbiage change from mep deferred to no mep required. ref pa# 202510066828. | |
| Nov 4, 2025 | Completed final sign-off Jan 2026 | 50 California St | Richlen Construction | 35th floor: to obtain final inspection for work approved under pa# 202406245061. all work is complete.Details
35th floor: to obtain final inspection for work approved under pa# 202406245061. all work is complete. | |
| Oct 30, 2025 | Completed final sign-off Jul 2026 | 201 Mission St | Richlen Construction | 23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as-is. new finishes & plumbing fixtures at existing mens & womens rrs to be ada compliant.Details
23 floor: interior alteration work to restrooms, elev. lobby & common corridor. scope does not affect existing tenant suites, exit access, path of egress or exit stairs. existing exiting to remain as-is. new finishes & plumbing fixtures at existing mens & womens rrs to be ada compliant. | $657,000 |
| Oct 22, 2025 | Completed final sign-off Apr 2026 | 217 Montgomery St | Richlen Construction | ebiko sushi- 217 montgomery st, small take out food establishment, tenant improvement, new fixtures, finshes, equipment, lighting, plimbing and electrical work. no exterior changes.Details
ebiko sushi- 217 montgomery st, small take out food establishment, tenant improvement, new fixtures, finshes, equipment, lighting, plimbing and electrical work. no exterior changes. | $125,000 |
| Oct 16, 2025 | Completed final sign-off May 2026 | 125 03rd St | Richlen Construction | revision 202503273212 for (n) storage roomDetails
revision 202503273212 for (n) storage room | $5,000 |
| Oct 15, 2025 | Completed final sign-off Mar 2026 | 575 Market St | Richlen Construction | suite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n) power & data, (n) millwork & plumbing fixturesDetails
suite 2550: t.i.: demo and construction of new non-load bearing partitions, (n) doors, frames and hardware. modification of (e) ceiling and grid system. (n) relocazted light fixtures and switches. (n) power & data, (n) millwork & plumbing fixtures | $426,300 |
| Oct 6, 2025 | Completed final sign-off Jan 2026 | 201 Mission St | Richlen Construction | suite 510. new partitions, offices and conference rooms. mep deferred. no plumbing fixtures.Details
suite 510. new partitions, offices and conference rooms. mep deferred. no plumbing fixtures. | $220,000 |
| Oct 2, 2025 | Completed final sign-off Jul 2026 | 201 California St | Richlen Construction | 15/f suite 1500: architectural only. interior only office t.i. new partitions, offices, and finishes. mep deferred.Details
15/f suite 1500: architectural only. interior only office t.i. new partitions, offices, and finishes. mep deferred. | $601,994 |
| Aug 7, 2025 | Completed final sign-off Sep 2025 | 343 Sansome St | Richlen Construction | 5/fl- ti 202507160889-lighting fixtures and associated circuiting/controls, power and signal devices and associated wiringDetails
5/fl- ti 202507160889-lighting fixtures and associated circuiting/controls, power and signal devices and associated wiring | $20,000 |
| Jul 17, 2025 | Completed final sign-off Sep 2025 | 201 Mission St | Richlen Construction | suite 1900. interior tenant improvement. removal of non structural partition, new non structural partitions, door assembly, sidelight and electrical outlets. no plumbing fixtures.Details
suite 1900. interior tenant improvement. removal of non structural partition, new non structural partitions, door assembly, sidelight and electrical outlets. no plumbing fixtures. | $120,000 |
| Jul 16, 2025 | Completed final sign-off Sep 2025 | 343 Sansome St | Richlen Construction | suite #550: demolition of non-structural partitions, reception desk, casework, light fixtures, and finishes. construction of non-structural partitions, doors, interior glazing system, casework, light fixtures and finishes. patch and repair existing ceilings as required. no plumbing fixtures.Details
suite #550: demolition of non-structural partitions, reception desk, casework, light fixtures, and finishes. construction of non-structural partitions, doors, interior glazing system, casework, light fixtures and finishes. patch and repair existing ceilings as required. no plumbing fixtures. | $144,000 |
| Apr 16, 2025 | Completed final sign-off Aug 2025 | 101 California St | Richlen Construction | suite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & fire life safety are deferred.Details
suite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & fire life safety are deferred. | $422,171 |
| Mar 27, 2025 | Completed final sign-off May 2026 | 125 03rd St | Richlen Construction | interior renovation of (e) spa @ 5th & 6th floors.Details
interior renovation of (e) spa @ 5th & 6th floors. | $652,844 |
| Feb 7, 2025 | In progress issued Feb 2025 | 50 California St | Richlen Construction | 2 new freestanding phonebooths located in tenant suite 2525. all other elements are existing to remain with no changes.Details
2 new freestanding phonebooths located in tenant suite 2525. all other elements are existing to remain with no changes. | $14,000 |
| Jan 29, 2025 | In progress issued Mar 2025 | 55 Erie St | Bcci Construction Company, Richlen Construction | revision to 202210194666 included: replace 2 abb 184 chargers w/ 2 abba 400 chargers, added utility trench detail. update erosion control notes, added fence & gate detailDetails
revision to 202210194666 included: replace 2 abb 184 chargers w/ 2 abba 400 chargers, added utility trench detail. update erosion control notes, added fence & gate detail | |
| Jan 29, 2025 | In progress issued Mar 2025 | 73 Erie St | Bcci Construction Company, Richlen Construction | revision to permit# 202210194663: added utility trench detail, updated erovsion control notes, added fence and gate detail.Details
revision to permit# 202210194663: added utility trench detail, updated erovsion control notes, added fence and gate detail. | |
| Jan 16, 2025 | Completed final sign-off Jul 2025 | 1 California St | Richlen Construction | hvac: add 2 heat pumps, w transfer fans, new duct, 2 hp thermostats and relate thermostats. lighting: install new fixtures, controls, power and signal devices. arch 202410253783Details
hvac: add 2 heat pumps, w transfer fans, new duct, 2 hp thermostats and relate thermostats. lighting: install new fixtures, controls, power and signal devices. arch 202410253783 | $871,153 |
| Dec 12, 2024 | Completed final sign-off Sep 2025 | 201 California St | Richlen Construction | 2nd flr. project scope on 2nd flr. consists of interior demo and new construction of non-structural elements; interior partitions, doors, finishes, ceilings, lighting, mechanical and plumbing (includes path of travel and restrooms).Details
2nd flr. project scope on 2nd flr. consists of interior demo and new construction of non-structural elements; interior partitions, doors, finishes, ceilings, lighting, mechanical and plumbing (includes path of travel and restrooms). | $400,000 |
| Nov 6, 2024 | Completed final sign-off Jun 2025 | 45 Fremont St | Richlen Construction | 34th flr. tenant suite demising and corridor construction at the 34th flr. new non-structural partitions, mechanical, electrical, light, and finishes. minor plumbing modifications to mens restroom.Details
34th flr. tenant suite demising and corridor construction at the 34th flr. new non-structural partitions, mechanical, electrical, light, and finishes. minor plumbing modifications to mens restroom. | $350,000 |
| Oct 25, 2024 | Completed final sign-off Jul 2025 | 1 California St | Richlen Construction | 2nd flr. demolition and construction of non-structural walls, door, glazing, ceilings, lighting fixtures, millwork and finishes, new movebable wall and structural beam support, restroom finish upgrades, new drinking fountain. mep deferredDetails
2nd flr. demolition and construction of non-structural walls, door, glazing, ceilings, lighting fixtures, millwork and finishes, new movebable wall and structural beam support, restroom finish upgrades, new drinking fountain. mep deferred | $1,816,064 |
| Oct 24, 2024 | Completed final sign-off Dec 2024 | 201 Mission St | Richlen Construction | 13/fl- ti (n) cased opening to combine suite 1300 and 1310 and (n) undercounter low-temp dishwasher (ada). no mech workDetails
13/fl- ti (n) cased opening to combine suite 1300 and 1310 and (n) undercounter low-temp dishwasher (ada). no mech work | $40,000 |
| Oct 3, 2024 | Completed final sign-off Mar 2025 | 221 Main St | Richlen Construction | 5th flr, ste 520: shall consist of limited interior demolition and const. of non-struc elements including but not necessary lmted to partitions, finishes, electrical outlets and switches. work does not affect fixture quantities, occupant load or path of travel.Details
5th flr, ste 520: shall consist of limited interior demolition and const. of non-struc elements including but not necessary lmted to partitions, finishes, electrical outlets and switches. work does not affect fixture quantities, occupant load or path of travel. | $291,009 |
| Oct 3, 2024 | Completed final sign-off Dec 2024 | 225 Bush St | Richlen Construction | ste 1800: revision to pa # 2024-0724-7143 removal of mech & plumbing work. electrical will be trade permit onlyDetails
ste 1800: revision to pa # 2024-0724-7143 removal of mech & plumbing work. electrical will be trade permit only | |
| Oct 2, 2024 | Completed final sign-off Dec 2024 | 201 Mission St | Richlen Construction | 13th fl, ste 1380 - interior ti removal of select existing non-structural partition and addition of new office and millwork at existing break areaDetails
13th fl, ste 1380 - interior ti removal of select existing non-structural partition and addition of new office and millwork at existing break area | $139,748 |
| Sep 26, 2024 | Completed final sign-off Apr 2025 | 201 California St | Richlen Construction | interior demoltion of 16/17 floor at 201 california. includes demo of non-structural interior partitions, doors, mechanical/electrical outlets, switches, millwork, lighting, dropped ceiling, and flooring. per ab-017 occupancy/exiting to be address under separate permit. fire sprinkler pa 20240919112Details
interior demoltion of 16/17 floor at 201 california. includes demo of non-structural interior partitions, doors, mechanical/electrical outlets, switches, millwork, lighting, dropped ceiling, and flooring. per ab-017 occupancy/exiting to be address under separate permit. fire sprinkler pa 20240919112 | $533,583 |
| Aug 15, 2024 | Completed final sign-off Mar 2025 | 180 Howard St | Richlen Construction | 6th fl. w/(e) single occupancy, shall consist of selective interior demo and (n) const of non-structural elements including but not limited to interior partitions doors finishes ceiling no structural work building exterior site landscape or parking changes are proposed no mech elec or plumbingDetails
6th fl. w/(e) single occupancy, shall consist of selective interior demo and (n) const of non-structural elements including but not limited to interior partitions doors finishes ceiling no structural work building exterior site landscape or parking changes are proposed no mech elec or plumbing | $139,924 |
| Aug 12, 2024 | In progress issued Jan 2025 | 998 Sansome St | Richlen Construction | abe upgrade including providing level landing at top and bottom of existing stair, new level accessible van loading zone and modified curb cuts at existing sidewalk. abe 202306157591Details
abe upgrade including providing level landing at top and bottom of existing stair, new level accessible van loading zone and modified curb cuts at existing sidewalk. abe 202306157591 | $126,000 |
| Aug 8, 2024 | In progress issued Dec 2024 | 901 Battery St | Richlen Construction | abe ord 51-16 accessible building entry upgrades, relocate door actuator to front facade, exterior sidewalk upgrades. abe 20200492108Details
abe ord 51-16 accessible building entry upgrades, relocate door actuator to front facade, exterior sidewalk upgrades. abe 20200492108 | $147,000 |
| Aug 7, 2024 | Completed final sign-off May 2025 | 50 California St | Richlen Construction | 24th fl - restroom remodel including demo and construction of lighting, finishes, fixtures, accessories and millwork. mep deferredDetails
24th fl - restroom remodel including demo and construction of lighting, finishes, fixtures, accessories and millwork. mep deferred | $195,721 |
| Aug 5, 2024 | Completed final sign-off Dec 2024 | 1 California St | Richlen Construction | 12th/f ste 1200: t.i. select demo & contruction of non-structural partitions, doors, glazing, millwork, finishes & lighting. mep deferred no final inspection until completeion of pa#:2024-0129-4863 (d.a. checklist)Details
12th/f ste 1200: t.i. select demo & contruction of non-structural partitions, doors, glazing, millwork, finishes & lighting. mep deferred no final inspection until completeion of pa#:2024-0129-4863 (d.a. checklist) | $115,538 |
| Jul 30, 2024 | Completed final sign-off Nov 2024 | 201 California St | Richlen Construction | 3/f: ti, adding 1-large office, 1-small wellness room and vestible, installign new ceiling, lighting, finshes and power. mep and life safety plans will be submitted as a separate permit. suite 325Details
3/f: ti, adding 1-large office, 1-small wellness room and vestible, installign new ceiling, lighting, finshes and power. mep and life safety plans will be submitted as a separate permit. suite 325 | $266,000 |
| Jul 24, 2024 | In progress issued Aug 2024 | 225 Bush St | Richlen Construction | suite 1800: t.i. -combine 2 suites into one single tenant. demo select walls and doors throughout. includes new finishes. no structural work performed. refer to approved path of travel set #202202248616. mep life safety plans will be permitted as a seperate permit.Details
suite 1800: t.i. -combine 2 suites into one single tenant. demo select walls and doors throughout. includes new finishes. no structural work performed. refer to approved path of travel set #202202248616. mep life safety plans will be permitted as a seperate permit. | $322,998 |
| Jun 24, 2024 | In progress issued Jul 2024 | 50 California St | Richlen Construction | 35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17.Details
35/f: demo non structural partitions, ceilings, millwork, electrical and mechanical, new elevator lobby doors to replace (e). (n) emergency lighting and mechanical ab-17. | $192,560 |
| Jun 11, 2024 | In progress issued Mar 2025 | 650 California St | Richlen Construction | retire (e) 450kw generator/fuel tank on roof. in garage, install (n) 500kw tier 2 generator w/ diesel particulate filter, free-standing fuel tank, automatic transfer switch, manual transfer switch, & distribution boards. construct new room to house generator. install new fuel pumping system toDetails
retire (e) 450kw generator/fuel tank on roof. in garage, install (n) 500kw tier 2 generator w/ diesel particulate filter, free-standing fuel tank, automatic transfer switch, manual transfer switch, & distribution boards. construct new room to house generator. install new fuel pumping system to | $1,786,903 |
| Jun 10, 2024 | Completed final sign-off Nov 2024 | 275 Battery St | Richlen Construction | existing suite 900 will be subdivided into 2 suites, suite 900 and suite 910, scope includes construction of a new structural demising wall and related ceiling flooring and finish repair, relocation of (e) light fixtures and related elctrical workDetails
existing suite 900 will be subdivided into 2 suites, suite 900 and suite 910, scope includes construction of a new structural demising wall and related ceiling flooring and finish repair, relocation of (e) light fixtures and related elctrical work | $98,103 |
| Jun 5, 2024 | Completed final sign-off Dec 2024 | 345 California St | Richlen Construction | 29th floor: t.i. in existing tenant space. demolition includes some walls, millwork, and finishes. new construction to include walls, doors, millwork, power, finishes, etc. no structural work is required. no change to occupancy type or building egress system.Details
29th floor: t.i. in existing tenant space. demolition includes some walls, millwork, and finishes. new construction to include walls, doors, millwork, power, finishes, etc. no structural work is required. no change to occupancy type or building egress system. | $200,000 |
| May 29, 2024 | Completed final sign-off Nov 2024 | 345 California St | Richlen Construction | 11th floor: demo and construction of toilet partitions, new plumbing, and new finishes salvage and reuse of existing selected materials. core restrooms 11th floorDetails
11th floor: demo and construction of toilet partitions, new plumbing, and new finishes salvage and reuse of existing selected materials. core restrooms 11th floor | $300,000 |
| Mar 26, 2024 | In progress issued Mar 2024 | 401 Mason St | Richlen Construction | new lighting in restrooms and lounge. pa #2021-0305-5990Details
new lighting in restrooms and lounge. pa #2021-0305-5990 | $30,000 |
| Mar 20, 2024 | Completed final sign-off Sep 2024 | 100 01st St | Richlen Construction | restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changesDetails
restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes | $75,000 |
| Mar 14, 2024 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | revision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference.Details
revision to pa#202311090493. revision scope shows (e) air distribution to be modified. (3) vav boxes are being added, no transfer fans/fire smoke dampers are being added. scope includes removal of break room door, does not affect fixtures quantities or path of travel.see mep drawings for reference. | |
| Feb 28, 2024 | Completed final sign-off Jun 2024 | 201 Mission St | Richlen Construction | interior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is. no exterior work. sprinkler, lw mod under sep permit.Details
interior alteration work to elevator lobby ceiling on the 5th fl. new ceiling and lighting scope does not affect e tenant suites, exit access, paths of egress or exit stairs. e exiting remains as is. no exterior work. sprinkler, lw mod under sep permit. | $60,000 |
| Feb 28, 2024 | Completed final sign-off Jun 2024 | 201 Mission St | Richlen Construction | interior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to remain as is. no exterior work. sprinkler system & l/s mod under separate permit.Details
interior alteration work to (2) elevator lobby ceilings on the 18th fl. (n) ceiling & lighting. scope does not affect (e) tenant suites, exit access, paths of egress or exit stairs. (e) exiting is to remain as is. no exterior work. sprinkler system & l/s mod under separate permit. | $158,000 |
| Feb 28, 2024 | Completed final sign-off Jul 2024 | 201 California St | Richlen Construction | 6th floor suite 600 - tenant improvement to include additon of small conference room by reconfiguring (e) conference room partitions, ceiling, millwork. mep work is deferredDetails
6th floor suite 600 - tenant improvement to include additon of small conference room by reconfiguring (e) conference room partitions, ceiling, millwork. mep work is deferred | $214,819 |
| Feb 14, 2024 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | 18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities orDetails
18th fl, ste 1850 of limited interior demolition of non-structural elements including interior partitions, doors, ceiling/lighting and finishes. construction (n) glass fronts, frames, power and tele data, act ceiling/lighting, millwork & finishes. scope of work does not affect fixture quantities or | $216,353 |
| Feb 8, 2024 | In progress issued Feb 2024 | 221 Main St | Richlen Construction | 1st fl suite 102 replacement of existing hood with a new hood at existing current location within suiteDetails
1st fl suite 102 replacement of existing hood with a new hood at existing current location within suite | $5,000 |
| Feb 1, 2024 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | 22/f-ste 2230: revison to pa# 202311090499, men's restroom scope has been revised to show no push buttons at entry door as 18" pull side clearance is achiered.Details
22/f-ste 2230: revison to pa# 202311090499, men's restroom scope has been revised to show no push buttons at entry door as 18" pull side clearance is achiered. | |
| Jan 4, 2024 | Completed final sign-off Apr 2024 | 201 Mission St | Richlen Construction | adding ada passenger drop-off/ loading zone in parking lot.Details
adding ada passenger drop-off/ loading zone in parking lot. | $500 |
| Nov 9, 2023 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | 7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.Details
7/f - #710: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes. | $504,622 |
| Nov 9, 2023 | Completed final sign-off May 2024 | 201 Mission St | Richlen Construction | 22/f - #2230: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes.Details
22/f - #2230: demo of nonstructural elements, interior partitions, doors, ceiling/lighting/finishes, construction of new glass fronts, frames, power & tele/data, act ceiling/lighting, millwork & finishes. | $442,270 |
| Nov 9, 2023 | Completed final sign-off Apr 2024 | 201 Mission St | Richlen Construction | suite #510:limited interior demolition of non-structural elements including interior partitions,doors,ceiling and lighting and finishes contruction of newglass fronts,frames,power & teldate,act ceiling/lighting,millsowrk and finishes.Details
suite #510:limited interior demolition of non-structural elements including interior partitions,doors,ceiling and lighting and finishes contruction of newglass fronts,frames,power & teldate,act ceiling/lighting,millsowrk and finishes. | $486,433 |
| Oct 25, 2023 | Completed final sign-off Apr 2024 | 650 California St | Richlen Construction | 27th fl:interior demolition of select partitions, finishes, and ceilings. relocation of some (e) light fixtures to accomodate new layout. new construction includes new private offices and dropped ceiling with lighting. patching of (e) finishes. mep and fls are deffered submittals.Details
27th fl:interior demolition of select partitions, finishes, and ceilings. relocation of some (e) light fixtures to accomodate new layout. new construction includes new private offices and dropped ceiling with lighting. patching of (e) finishes. mep and fls are deffered submittals. | $284,292 |
| Aug 8, 2023 | Completed final sign-off Feb 2024 | 188 Spear St | Richlen Construction | selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017.Details
selective demo of non-load bearing partitions, ceilings, light fixtures, millwork, kitchen equipemnt, plumbing, and finishes. ab-017. | $225,000 |
| Jul 28, 2023 | Completed final sign-off Aug 2023 | 45 Fremont St | Richlen Construction | 28th flr: recommencement and completion of work approved under pa #201507222162.Details
28th flr: recommencement and completion of work approved under pa #201507222162. | |
| Jun 26, 2023 | Completed final sign-off Sep 2024 | 50 California St | Richlen Construction | 28th fl - demo of partitions, ceilings, finishes and millwork; remodel of (e) restrooms and elevator lobby. the space will remain unoccupied after this project. any future ti's will be under separate permit. no new plumbing fixturesDetails
28th fl - demo of partitions, ceilings, finishes and millwork; remodel of (e) restrooms and elevator lobby. the space will remain unoccupied after this project. any future ti's will be under separate permit. no new plumbing fixtures | $469,000 |
| Jun 15, 2023 | Completed final sign-off Jan 2026 | 50 California St | Richlen Construction | 35/f: demo of partitions, ceilings, finishes and millwork. demo of interior stair that connects the 35th and 34th floor. new structural floor infill on 35th floor. restroom remodelDetails
35/f: demo of partitions, ceilings, finishes and millwork. demo of interior stair that connects the 35th and 34th floor. new structural floor infill on 35th floor. restroom remodel | $289,880 |
| Jun 8, 2023 | Completed final sign-off Nov 2023 | 1 Bush St | Richlen Construction | electrical and mechanical work for ti pa 2023-0322-4185 & 2022-1215-8405Details
electrical and mechanical work for ti pa 2023-0322-4185 & 2022-1215-8405 | $125,000 |
| Jun 5, 2023 | Completed final sign-off Oct 2023 | 255 California St | Richlen Construction | 3rd fl ste 300: relocation of 1 door.Details
3rd fl ste 300: relocation of 1 door. | $5,000 |
| May 31, 2023 | Completed final sign-off Apr 2024 | 650 California St | Richlen Construction | upgrades only to the building path of travel to meet current code compliances. ab-056. mep, fire/lifesafety and fire sprinkler system is under sep permit. includes primary bldg entry, parking, ev charging and elevators (restrooms at all levels not included)Details
upgrades only to the building path of travel to meet current code compliances. ab-056. mep, fire/lifesafety and fire sprinkler system is under sep permit. includes primary bldg entry, parking, ev charging and elevators (restrooms at all levels not included) | $30,000 |
| May 26, 2023 | Completed final sign-off Jul 2023 | 255 California St | Richlen Construction | suite 450 - 4th flr: rev to 202212289257: adding office #458. minor t.i. with non-loading partitions, electrical and finishes. maher n/a. fire alarm/sprinklers on a separate permit, if applic.Details
suite 450 - 4th flr: rev to 202212289257: adding office #458. minor t.i. with non-loading partitions, electrical and finishes. maher n/a. fire alarm/sprinklers on a separate permit, if applic. | $40,000 |
| May 17, 2023 | Completed final sign-off Aug 2024 | 201 Toland St | Richlen Construction | revision to pa#: 202011189158 add a new 2hr rated pre-fabriated storage container at the covered dock to store 20% ipa.Details
revision to pa#: 202011189158 add a new 2hr rated pre-fabriated storage container at the covered dock to store 20% ipa. | $15,000 |