- Aug 2011 to May 2026
20 permits since 2000 (architect on 20 permits): 15 completed, 2 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 22, 2026 | In progress filed May 2026, not yet issued | 121 Ellert St | construct new rear yard wood fence approx. 25'-0" long and 10'-0" high consisting of 8'-0" solid wood fence with 2'-0" open lattice above wood posts set in concrete footings. fence located on flat grade. no retaining wall.Details
construct new rear yard wood fence approx. 25'-0" long and 10'-0" high consisting of 8'-0" solid wood fence with 2'-0" open lattice above wood posts set in concrete footings. fence located on flat grade. no retaining wall. | $8,000 | |
| May 7, 2025 | In progress issued Aug 2025 | 239 Duboce Av | new concrete foundation next to e brick foundation. new concrete slab, new bath at workshop, new door to the rearDetails
new concrete foundation next to e brick foundation. new concrete slab, new bath at workshop, new door to the rear | $150,000 | |
| Mar 12, 2025 | Completed final sign-off Dec 2025 | 162 Alpine Tr | Mcdp Dba Geothersun Construction | revision to pa #202109027657. basement bathroom design complete, bedroom, & laundry room remodel at design basement level.(1) washer& dryer moved downstairs. minor modification to 3rd floor primary bathroom, add french door in basement.Details
revision to pa #202109027657. basement bathroom design complete, bedroom, & laundry room remodel at design basement level.(1) washer& dryer moved downstairs. minor modification to 3rd floor primary bathroom, add french door in basement. | |
| Aug 29, 2024 | Completed final sign-off Jun 2025 | 3665 Fillmore St | Jv Services | replace entire south facing courtyard wall for dry rot repairDetails
replace entire south facing courtyard wall for dry rot repair | $500,000 |
| Jul 25, 2024 | Completed final sign-off Jul 2026 | 121 Ellert St | Mcdp Dba Geothersun Construction | interior remodel demo / repair existing stairs - replace inkind. (n) interior stairs, (n) secondary kitchen+bathroom on lower floor.Details
interior remodel demo / repair existing stairs - replace inkind. (n) interior stairs, (n) secondary kitchen+bathroom on lower floor. | $600,000 |
| Jun 8, 2023 | Completed final sign-off Aug 2023 | 618 Sanchez St | removal of kitchen wall on 2/fDetails
removal of kitchen wall on 2/f | $15,000 | |
| May 31, 2023 | Completed final sign-off Aug 2023 | 620 Sanchez St | removal of kitchen wall on 3rd flDetails
removal of kitchen wall on 3rd fl | $30,000 | |
| Jan 12, 2023 | Completed final sign-off Aug 2025 | 162 Alpine Tr | (n) footing to the rear of the building.Details
(n) footing to the rear of the building. | $100,000 | |
| Nov 18, 2021 | Completed final sign-off May 2022 | 619 Castro St | Euro Team Construction | replace all kitchen cabinets, kitchen fixtues, bathroom fixtues. (n) tilesDetails
replace all kitchen cabinets, kitchen fixtues, bathroom fixtues. (n) tiles | $50,000 |
| Sep 2, 2021 | Completed final sign-off Dec 2025 | 162 Alpine Tr | interior remodel including kitchen and (e) bathroom. replace all windows. adding 3/4 bathroom o lower level & 1/2 bath on entrey level, reroof non-visible. visible window replacement under seperate permit.Details
interior remodel including kitchen and (e) bathroom. replace all windows. adding 3/4 bathroom o lower level & 1/2 bath on entrey level, reroof non-visible. visible window replacement under seperate permit. | $700,000 | |
| Jan 22, 2021 | Completed final sign-off Aug 2022 | 2932 Gough St | Fatts Customs Construction | legalization of existing accessory dwelling on the first floorDetails
legalization of existing accessory dwelling on the first floor | $80,000 |
| May 30, 2019 | Completed final sign-off Dec 2022 | 19 Cerritos Av | Hammerhouse Construction | rev to pa# 201802201660; concrete stairs & new framing excavation 14" to 16" and retaining wall below previously approved rear deckDetails
rev to pa# 201802201660; concrete stairs & new framing excavation 14" to 16" and retaining wall below previously approved rear deck | |
| Feb 20, 2018 | Completed final sign-off Dec 2022 | 19 Cerritos Av | Hammerhouse Construction | remove & rebuild (e) attached garage & roof with a staircase to the rear garden.Details
remove & rebuild (e) attached garage & roof with a staircase to the rear garden. | $65,000 |
| Jun 21, 2016 | Expired or cancelled cancelled Jan 2023 | 48 Winfield St | interior & exterior remodel including: (n) windows, front door, garage doors, stucco & siding repair & replacement, (n) roof & skylights, (n) front planters, (n) rearyard fence & garden layout, (n) internal layouts w/(n) staircase, kitchen, bathrooms. upgrade electric & plumbing to current code.Details
interior & exterior remodel including: (n) windows, front door, garage doors, stucco & siding repair & replacement, (n) roof & skylights, (n) front planters, (n) rearyard fence & garden layout, (n) internal layouts w/(n) staircase, kitchen, bathrooms. upgrade electric & plumbing to current code. | $850,000 | |
| Oct 23, 2015 | Expired or cancelled cancelled Jan 2026 | 1310 Minnesota St | kitchen & bathroom remodel on main floor, new railing on staircase and on mezz. floor, relocate mezz. floor closet, new hardwood floor, paint all walls & ceiling. n/a ordinance#155-13Details
kitchen & bathroom remodel on main floor, new railing on staircase and on mezz. floor, relocate mezz. floor closet, new hardwood floor, paint all walls & ceiling. n/a ordinance#155-13 | $80,000 | |
| Aug 20, 2015 | Completed final sign-off Dec 2015 | 1150 Lombard St | Terence Mcmahon Construction | unit 6, bathroom remodel including replacement of all fixtures and upgrade of all electrical fixtures, electrical upgrade in both bedrooms including new smoke detector and carbon monoxide detector in hallwaysDetails
unit 6, bathroom remodel including replacement of all fixtures and upgrade of all electrical fixtures, electrical upgrade in both bedrooms including new smoke detector and carbon monoxide detector in hallways | $45,000 |
| May 8, 2015 | Expired or cancelled cancelled Jan 2026 | 7 Kramer Pl | add 260 sq ft roof deck and railingDetails
add 260 sq ft roof deck and railing | $25,000 | |
| Oct 6, 2014 | Completed final sign-off Mar 2015 | 170 Guerrero St | Skylor Construction Dba Skycore Constr | add half bath on 2/f, update electrical layout and plumbing fixtures in (e) bathroom.Details
add half bath on 2/f, update electrical layout and plumbing fixtures in (e) bathroom. | $15,000 |
| Sep 16, 2014 | Completed final sign-off Jun 2015 | 47 Kearny St | D S Management Inc Dba Metrocon Builders | remove internal staircase from 3rd to 4th fl. fill in concrete floor, move office partiton wall, upgrades as listed in form cDetails
remove internal staircase from 3rd to 4th fl. fill in concrete floor, move office partiton wall, upgrades as listed in form c | $62,000 |
| Aug 30, 2011 | Completed final sign-off Aug 2012 | 7 Kramer Pl | update elect wiring, amendments to internal layout (change bedrm to living rm, fam & living rm to bedrms) remodel kitchen,replace cabinets,counters,appliances,replace single glazed window by double window, repair roof-covering,remodel bath,floorings,add skylights, strengthen @ basemt,work @ 7 kramerDetails
update elect wiring, amendments to internal layout (change bedrm to living rm, fam & living rm to bedrms) remodel kitchen,replace cabinets,counters,appliances,replace single glazed window by double window, repair roof-covering,remodel bath,floorings,add skylights, strengthen @ basemt,work @ 7 kramer | $15,000 |