Jv Services
- Based in
- San Ramon
- On San Francisco permits
- Jun 2020 to Jan 2026
- Last 24 months
- 10 permits filed
28 permits since 2000: 22 completed, 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2026 | In progress issued Apr 2026 | 3318 Steiner St | revision tpo pa #202310047992. locally thicken existing grade beam on 2 different walls.Details
revision tpo pa #202310047992. locally thicken existing grade beam on 2 different walls. | $6,000 |
| Dec 1, 2025 | In progress issued Dec 2025 | 3318 Steiner St | revision to permit 202310047992. relocation of main meter to same wall but closer to main door. relocate sub-panels to wall on kitchen area.Details
revision to permit 202310047992. relocation of main meter to same wall but closer to main door. relocate sub-panels to wall on kitchen area. | $2,500 |
| Nov 7, 2025 | Completed final sign-off Jan 2026 | 44 Cervantes Bl | unit#104: remodel kitchen in kind. new cabinets, new fridge, new stove, new electrical circuits, new outlets and switches. approx. 96 sq ft.Details
unit#104: remodel kitchen in kind. new cabinets, new fridge, new stove, new electrical circuits, new outlets and switches. approx. 96 sq ft. | $25,000 |
| Nov 6, 2025 | Completed final sign-off Jun 2026 | 211 Moulton St | addition of bathroom. new drain and water for toilet, sink, and shower. new electrical for lights and gfci. new sheetrock and paint.Details
addition of bathroom. new drain and water for toilet, sink, and shower. new electrical for lights and gfci. new sheetrock and paint. | $23,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 1144 Pine St | rev to pa# 2025-0513-6362: replace 6 sliding doors front of buildingDetails
rev to pa# 2025-0513-6362: replace 6 sliding doors front of building | $12,000 |
| Jul 1, 2025 | Completed final sign-off Sep 2025 | 3665 Fillmore St | unit #12: remodeling of kitchen and bathroom in kind. no moving walls. fixtures to remain in the same location. kitchen approx. 99 sq ft. bathroom approx. 40 sq ft.Details
unit #12: remodeling of kitchen and bathroom in kind. no moving walls. fixtures to remain in the same location. kitchen approx. 99 sq ft. bathroom approx. 40 sq ft. | $30,000 |
| May 13, 2025 | Completed final sign-off May 2026 | 1144 Pine St | demo of stucco, demo of damagned subfloor of decks. demo of decking materials. replace damaged wood, floor joist, stucco and deck, materials in-kind. work applies to unit 101-104, 201-208, 301-308, 401-404Details
demo of stucco, demo of damagned subfloor of decks. demo of decking materials. replace damaged wood, floor joist, stucco and deck, materials in-kind. work applies to unit 101-104, 201-208, 301-308, 401-404 | $40,000 |
| May 12, 2025 | Completed final sign-off Dec 2025 | 211 Moulton St | (2) bathroom remodels in kind. remove and replace toilets, sinks, shower walls, tub, and sheetrock as needed.Details
(2) bathroom remodels in kind. remove and replace toilets, sinks, shower walls, tub, and sheetrock as needed. | $28,000 |
| Mar 5, 2025 | In progress issued Mar 2025 | 186 Museum Wy | remove wornout shingle siding, remove section damaged plywood. install new plywood as needed in kind.install new shingles siding in kind paint shingles. area of work is about 220 sf approx.. replace 6 windows and 1 sliding door in kind. not visible from street.Details
remove wornout shingle siding, remove section damaged plywood. install new plywood as needed in kind.install new shingles siding in kind paint shingles. area of work is about 220 sf approx.. replace 6 windows and 1 sliding door in kind. not visible from street. | $18,000 |
| Mar 5, 2025 | Completed final sign-off Jun 2025 | 44 Cervantes Bl | unit 206: demolition of kitchen and bathroom. redo new kitchen and bath in kind. new appliances, new paintDetails
unit 206: demolition of kitchen and bathroom. redo new kitchen and bath in kind. new appliances, new paint | $25,000 |
| Aug 29, 2024 | Completed final sign-off Jun 2025 | 3665 Fillmore St | replace entire south facing courtyard wall for dry rot repairDetails
replace entire south facing courtyard wall for dry rot repair | $500,000 |
| Aug 8, 2024 | Completed final sign-off Dec 2024 | 32 Lundys Ln | remove existing siding and install new siding. install new plywood on exterior wall in kind. replace windows. paint new siding. all work is on side of the house, not visible from street. all work in kindDetails
remove existing siding and install new siding. install new plywood on exterior wall in kind. replace windows. paint new siding. all work is on side of the house, not visible from street. all work in kind | $48,000 |
| Jul 31, 2024 | Completed final sign-off Nov 2024 | 1144 Pine St | remove 12 sliding doors. install 12 new sliding doors. repair in kind. all work is on the back of the building. u=.30maxDetails
remove 12 sliding doors. install 12 new sliding doors. repair in kind. all work is on the back of the building. u=.30max | $11,000 |
| Jul 17, 2024 | Completed final sign-off Nov 2024 | 1144 Pine St | demolition of stucco from back walls: approx 1100sf, remove damaed wood from walls & decks, replace wood in kind on walls & decks, reinstall plywood on walls & decks in kind, install new stuco/paintingDetails
demolition of stucco from back walls: approx 1100sf, remove damaed wood from walls & decks, replace wood in kind on walls & decks, reinstall plywood on walls & decks in kind, install new stuco/painting | $48,000 |
| Jun 18, 2024 | In progress issued Mar 2025 | 3318 Steiner St | cold shell building for future restaurant build-out: facade renovation including moment frame, new restroom, new roof and skylight, seismic upgrade, new floor slab, new electrical service, new plumbing service. deferred electrical & mep permits.Details
cold shell building for future restaurant build-out: facade renovation including moment frame, new restroom, new roof and skylight, seismic upgrade, new floor slab, new electrical service, new plumbing service. deferred electrical & mep permits. | $375,000 |
| Apr 17, 2024 | Completed final sign-off Jun 2025 | 3665 Fillmore St | demolition of stucco in order to remove damanged plywood and studs replace studs (3 studs) and plywood (25 sf) in kind as needed area of work is approx 1500 sq ft. install new stucco replace in kind, not visible from streetDetails
demolition of stucco in order to remove damanged plywood and studs replace studs (3 studs) and plywood (25 sf) in kind as needed area of work is approx 1500 sq ft. install new stucco replace in kind, not visible from street | $35,000 |
| Oct 10, 2023 | Completed final sign-off Sep 2024 | 600 Buchanan St | run electrical for bath, powder room and kitchen. insulate bath, powder room and kitchen. in kitchen: sheetrock, new cabinets, appliances and countertop. in bath and powder: toilets and sinks/vanity. install insul. and sheetrock on 1 bedroom wall and ceiling. 5/8" type x everwhere. all work in kind.Details
run electrical for bath, powder room and kitchen. insulate bath, powder room and kitchen. in kitchen: sheetrock, new cabinets, appliances and countertop. in bath and powder: toilets and sinks/vanity. install insul. and sheetrock on 1 bedroom wall and ceiling. 5/8" type x everwhere. all work in kind. | $28,000 |
| Mar 16, 2023 | Completed final sign-off Feb 2024 | 121 San Benito Wy | rev to pa# 2022-1013-4286: remove portion of stucco on front wall and damaged plywood and studs, replace damaged studs and plywood in kind re-stucco wall as needed approx 600 sf.Details
rev to pa# 2022-1013-4286: remove portion of stucco on front wall and damaged plywood and studs, replace damaged studs and plywood in kind re-stucco wall as needed approx 600 sf. | $13,000 |
| Dec 20, 2022 | Completed final sign-off Oct 2023 | 121 San Benito Wy | remodel (e) kitchen, new applicances,counter w/o new cabinets and lighting.remodel (e) main bath and access.remodel (e) jack and jill bathroom with new access from hall and (n) lighting. remodel (e) primary bath and primary closet and (n) lighting.Details
remodel (e) kitchen, new applicances,counter w/o new cabinets and lighting.remodel (e) main bath and access.remodel (e) jack and jill bathroom with new access from hall and (n) lighting. remodel (e) primary bath and primary closet and (n) lighting. | $45,000 |
| Oct 13, 2022 | Completed final sign-off Feb 2024 | 121 San Benito Wy | remove portion of stucco on front wall. remove any damaged plywood and studs. replace studs and plywood in kind. re-stucco wall as needed. 300 sq ftDetails
remove portion of stucco on front wall. remove any damaged plywood and studs. replace studs and plywood in kind. re-stucco wall as needed. 300 sq ft | $20,000 |
| Sep 23, 2022 | Completed final sign-off Jan 2023 | 44 Cervantes Bl | one kitchen and one bathroom: unit #203: demo of kitchen cabinets, counters. demo of toilet, vanity, wall tile and floor tile in bathroom. replace with new fixtures, upgrade electrical subpanel.Details
one kitchen and one bathroom: unit #203: demo of kitchen cabinets, counters. demo of toilet, vanity, wall tile and floor tile in bathroom. replace with new fixtures, upgrade electrical subpanel. | $25,000 |
| Jul 15, 2022 | Completed final sign-off Sep 2022 | 3665 Fillmore St | unit 16: demoliton of extg kitchen and bathroom. run electrical for kitchen and bathroom. install new cabinets. new tub and toilet. layout will stay the same. no exterior workDetails
unit 16: demoliton of extg kitchen and bathroom. run electrical for kitchen and bathroom. install new cabinets. new tub and toilet. layout will stay the same. no exterior work | $15,000 |
| Mar 29, 2022 | Completed final sign-off Jun 2022 | 44 Cervantes Bl | remove stucco from section of front of building. reinstall new stucco.Details
remove stucco from section of front of building. reinstall new stucco. | $8,000 |
| Jun 24, 2021 | Completed final sign-off Apr 2023 | 32 Lundys Ln | re-enformecement of (e) exterior stairs. not visible from street.Details
re-enformecement of (e) exterior stairs. not visible from street. | $25,000 |
| Apr 1, 2021 | Never finaled issued Apr 2021, no final | 44 Cervantes Bl | emolition of tub. shower wall tile. install new shower valve, new tub, surrface tile new sink and toilet. demolition of kitchen cabinets, upgrade electrical for kitchen. install new cabinets counters and appliances. upgrade electrical subpanel.Details
emolition of tub. shower wall tile. install new shower valve, new tub, surrface tile new sink and toilet. demolition of kitchen cabinets, upgrade electrical for kitchen. install new cabinets counters and appliances. upgrade electrical subpanel. | $22,000 |
| Apr 1, 2021 | Completed final sign-off Jun 2021 | 3665 Fillmore St | demolition of tub and shower tile install new shower valve, new tub, sheetrock, new tile demolition of existing kitchen cabinets, install upgrade electrical for kitchen. install new sheetrock new cabinets and countertops. upgrade electrical subpanel.Details
demolition of tub and shower tile install new shower valve, new tub, sheetrock, new tile demolition of existing kitchen cabinets, install upgrade electrical for kitchen. install new sheetrock new cabinets and countertops. upgrade electrical subpanel. | $22,000 |
| Sep 21, 2020 | Completed final sign-off Feb 2021 | 41 Broderick St | demoliton of (e) tub, toilet and vanity. build new shower pan, instal new shower valve, tile. new toilet and vanity. install new light on top of vanity.Details
demoliton of (e) tub, toilet and vanity. build new shower pan, instal new shower valve, tile. new toilet and vanity. install new light on top of vanity. | $16,000 |
| Jun 11, 2020 | Completed final sign-off Oct 2020 | 1865 Clay St | unit#6: bathroom remodel: replace bathtub with shower pan, replace shower valve, install new granite on shower walls, replace vanity. replace kitchen countertops, relocate electrical sub panel from kitchen to hallway. kitchen and bathroom remodel in-kind.Details
unit#6: bathroom remodel: replace bathtub with shower pan, replace shower valve, install new granite on shower walls, replace vanity. replace kitchen countertops, relocate electrical sub panel from kitchen to hallway. kitchen and bathroom remodel in-kind. | $22,000 |