Richard Rhee
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Dpw-Idc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2014 to May 2022
10 permits since 2000 (engineer on 7 permits, architect on 1 permit, authorized agent-others on 1 permit, pmt consultant/expediter on 1 permit): 2 completed, 6 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 25, 2022 | Never finaled issued Jun 2022, no final | 1221 Polk St | M Hernandez Construction Inc | subsidewalk basement roof repair.Details
subsidewalk basement roof repair. | $60,000 |
| May 25, 2022 | Never finaled issued Jun 2022, no final | 106 Fern St | M Hernandez Construction Inc | revision to pa# 202111243116. add a subsidewalk basement roof repair.Details
revision to pa# 202111243116. add a subsidewalk basement roof repair. | $38,000 |
| Nov 24, 2021 | Never finaled issued Feb 2022, no final | 106 Fern St | M Hernandez Construction Inc | replace sub sidewalk basement roof slab (no exterior work on bldg)Details
replace sub sidewalk basement roof slab (no exterior work on bldg) | $38,000 |
| Nov 19, 2020 | Expired or cancelled cancelled Jan 2026 | 1095 Indiana St | replace (e) hvac with a new hvac system. minor structural adjustment to the roof's framing system.Details
replace (e) hvac with a new hvac system. minor structural adjustment to the roof's framing system. | $180,000 | |
| Aug 24, 2018 | Completed final sign-off Aug 2020 | 1001 Polk St | installation of caltrans 1-a pole foundation over existing sub sidwalk basementDetails
installation of caltrans 1-a pole foundation over existing sub sidwalk basement | $20,000 | |
| Aug 24, 2018 | Completed final sign-off Aug 2020 | 625 Polk St | installation of caltrans 1-a pole foundation over existing sub sidewalk basement.Details
installation of caltrans 1-a pole foundation over existing sub sidewalk basement. | $20,000 | |
| Sep 15, 2017 | Expired or cancelled cancelled Jan 2026 | 456 Mission St | subsidewalk basement roof repair to install compliant curb ramp.Details
subsidewalk basement roof repair to install compliant curb ramp. | $50,000 | |
| Aug 22, 2016 | Never finaled issued Jul 2017, no final | 500 Geneva Av | Cal State Constructors Inc | install steel frames with gates to provide fall protection system for muni maintenance workersDetails
install steel frames with gates to provide fall protection system for muni maintenance workers | $1,100,000 |
| Aug 22, 2016 | Never finaled issued Jul 2017, no final | 425 Geneva Av | Cal State Constructors Inc | install steel frames with gates to provide fall protection system for muni maintenance workersDetails
install steel frames with gates to provide fall protection system for muni maintenance workers | $1,500,000 |
| Jun 2, 2014 | Never finaled issued Jul 2014, no final | 1101 John F Kennedy Dr | slab-on-grade with wall footings at 3 sides of building, trench drain on rear side of building, pre-fabricated building on this slab on grade, 36x24. -maher- compliance with ordinance no. 155-13.not required.Details
slab-on-grade with wall footings at 3 sides of building, trench drain on rear side of building, pre-fabricated building on this slab on grade, 36x24. -maher- compliance with ordinance no. 155-13.not required. | $70,000 |