M Hernandez Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2019 to Dec 2024
- Last 24 months
- 1 permit filed
6 permits since 2000: 1 completed, 5 never finaled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2024 | Completed final sign-off Apr 2026 | 1101 John F Kennedy Dr | for san francisco police department golden gate stable improvements. demolition and excavation of existing sand within the arena and paddock areas and install new sub-grade improvements. the scope includes imported footing material, sub-drainage, wood wall and minor concrete paving.Details
for san francisco police department golden gate stable improvements. demolition and excavation of existing sand within the arena and paddock areas and install new sub-grade improvements. the scope includes imported footing material, sub-drainage, wood wall and minor concrete paving. | $775,636 |
| May 25, 2022 | Never finaled issued Jun 2022, no final | 1221 Polk St | subsidewalk basement roof repair.Details
subsidewalk basement roof repair. | $60,000 |
| May 25, 2022 | Never finaled issued Jun 2022, no final | 106 Fern St | revision to pa# 202111243116. add a subsidewalk basement roof repair.Details
revision to pa# 202111243116. add a subsidewalk basement roof repair. | $38,000 |
| Nov 24, 2021 | Never finaled issued Feb 2022, no final | 106 Fern St | replace sub sidewalk basement roof slab (no exterior work on bldg)Details
replace sub sidewalk basement roof slab (no exterior work on bldg) | $38,000 |
| Apr 23, 2019 | Never finaled issued May 2019, no final | 1301 Pierce St | temporary power, sewer and water lines connected to the existing maxine hall health clinic. placement of temporary 2 trailers necessitates redirection of pedestrian traffic at sidewalk, new entry deck and landing. temprary trailers are permitted separately by the state of caDetails
temporary power, sewer and water lines connected to the existing maxine hall health clinic. placement of temporary 2 trailers necessitates redirection of pedestrian traffic at sidewalk, new entry deck and landing. temprary trailers are permitted separately by the state of ca | $25,000 |
| Apr 23, 2019 | Never finaled issued May 2019, no final | 1181 Golden Gate Av | temporary power, sewer and water lines connected to the existing ella hill hutch community center. placement of 4 temporary trailers necessitates the removal of 1 exiting tree. temprary trailers are permitted separately by the state of caDetails
temporary power, sewer and water lines connected to the existing ella hill hutch community center. placement of 4 temporary trailers necessitates the removal of 1 exiting tree. temprary trailers are permitted separately by the state of ca | $45,000 |