Raymond Meng Zhong
- Listed as
- engineer
- Firm
- Perfect Design & Mgmt
- Based in
- Alhambra
- On San Francisco permits
- Nov 2016 to Feb 2025
4 permits since 2000 (engineer on 4 permits): 2 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 6, 2025 | Completed final sign-off Oct 2025 | 2235 Polk St | Western Construction Consulting Inc | restroom alt:install compliant toilet & sink fixtures.ensure adequate grab bars,mirrors & power down dispensers are positioned.provide accessible signage & lighting.mod restroom layout to ada compliant.entry door modification:replace (e) door w/ wider more accessible option. abe202411120280Details
restroom alt:install compliant toilet & sink fixtures.ensure adequate grab bars,mirrors & power down dispensers are positioned.provide accessible signage & lighting.mod restroom layout to ada compliant.entry door modification:replace (e) door w/ wider more accessible option. abe202411120280 | $32,000 |
| Dec 6, 2024 | In progress issued Sep 2025 | 120 Shakespeare St | Yefa Construction Inc, J R M Construction | to comply with nov #201478001 and 2019511681. demolishing the extg exterior structural and bldg a new 2 story exterior stair and deck. adu at ground levelDetails
to comply with nov #201478001 and 2019511681. demolishing the extg exterior structural and bldg a new 2 story exterior stair and deck. adu at ground level | $50,000 |
| May 17, 2017 | Completed final sign-off Mar 2018 | 1581 Webster St | 1 Design Construction Corp | #150 - new tenant improvement (ice-cream shop) - demo & new interior partition, relocate existing 2 hand sinks, add new outlets; new plumbing fixtures (3 comp, prep & mop sinks) replace suspended ceilingDetails
#150 - new tenant improvement (ice-cream shop) - demo & new interior partition, relocate existing 2 hand sinks, add new outlets; new plumbing fixtures (3 comp, prep & mop sinks) replace suspended ceiling | $60,000 |
| Nov 17, 2016 | Never finaled issued Jan 2017, no final | 121 Spear St | Mani Builders | b-09 change of use from vacant retail to restaurant. glass partitions, stainless steel partitions, elect & plumbing, low voltage work, exterior glass doors, duct work (all exposed ceiling) kitchen equipment/counter/led lighting, concrete flr sealer/base cave 3/8" ridious throughout dining & kitchen.Details
b-09 change of use from vacant retail to restaurant. glass partitions, stainless steel partitions, elect & plumbing, low voltage work, exterior glass doors, duct work (all exposed ceiling) kitchen equipment/counter/led lighting, concrete flr sealer/base cave 3/8" ridious throughout dining & kitchen. | $100,000 |