Western Construction Consulting Inc
- Based in
- Santa Clara
- On San Francisco permits
- Oct 2024 to Jul 2025
- Last 24 months
- 3 permits filed
3 permits since 2000: 2 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2025 | Completed final sign-off Oct 2025 | 2235 Polk St | revise the fire door location between retail and garage per request from an inspector. revision to permit #202410012043 noted on drawings as delta 4.Details
revise the fire door location between retail and garage per request from an inspector. revision to permit #202410012043 noted on drawings as delta 4. | $500 |
| Feb 6, 2025 | Completed final sign-off Oct 2025 | 2235 Polk St | restroom alt:install compliant toilet & sink fixtures.ensure adequate grab bars,mirrors & power down dispensers are positioned.provide accessible signage & lighting.mod restroom layout to ada compliant.entry door modification:replace (e) door w/ wider more accessible option. abe202411120280Details
restroom alt:install compliant toilet & sink fixtures.ensure adequate grab bars,mirrors & power down dispensers are positioned.provide accessible signage & lighting.mod restroom layout to ada compliant.entry door modification:replace (e) door w/ wider more accessible option. abe202411120280 | $32,000 |
| Oct 18, 2024 | In progress issued Nov 2025 | 1546 Market St | relocate the egress path on the ground floor. first time tenant improvement of 1-story tenant space for 20-seat hair salon, change of occupancy group from retail (m) to hair salon (b). fire alarm/sprinkler, signage, and mep will be deferred submittal.Details
relocate the egress path on the ground floor. first time tenant improvement of 1-story tenant space for 20-seat hair salon, change of occupancy group from retail (m) to hair salon (b). fire alarm/sprinkler, signage, and mep will be deferred submittal. | $150,000 |