R. Daswani
- Listed as
- engineer
- Firm
- Arup
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Aug 2024
22 permits since 2000 (engineer on 22 permits): 17 completed, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2024 | Expired or cancelled withdrawn Sep 2024 | 2 Lake St | Plant Construction Co, Lp | revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes.Details
revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes. | |
| Sep 16, 2022 | Completed final sign-off Oct 2023 | 100 Channel | Hathaway Dinwiddie Co. | revision to mechanical fan and smoke damper matrix for cfc closeout. ref pa# 201509227707.Details
revision to mechanical fan and smoke damper matrix for cfc closeout. ref pa# 201509227707. | |
| Apr 22, 2022 | Completed final sign-off May 2022 | 100 Channel | Hathaway Dinwiddie Co. | arch & mep revision to document approved ab-005 for fsd monitoring. ref pa# 201509227707 s3.Details
arch & mep revision to document approved ab-005 for fsd monitoring. ref pa# 201509227707 s3. | |
| Apr 21, 2022 | Completed final sign-off Nov 2022 | 100 34th Av | Hathaway Dinwiddie Co. | demolition of (e) millwork, carpet, gyp bd ceiling (existing framing to remain for reuse), light fixtures, mech linear diffusers and ceiling mounted devices. remove (e) layer of gyp bd and plywood backing, from (e) metal stud framing scheduled for reuse. scope of new work will include galleryDetails
demolition of (e) millwork, carpet, gyp bd ceiling (existing framing to remain for reuse), light fixtures, mech linear diffusers and ceiling mounted devices. remove (e) layer of gyp bd and plywood backing, from (e) metal stud framing scheduled for reuse. scope of new work will include gallery | $494,797 |
| Mar 25, 2021 | Completed final sign-off Sep 2021 | 415 Mission St | Dome Construction Corp | 37/f & 38/f: rev to pa202012181350 - revise damper matix on sheet m-900. maher n/a.Details
37/f & 38/f: rev to pa202012181350 - revise damper matix on sheet m-900. maher n/a. | |
| Dec 18, 2020 | Completed final sign-off Sep 2021 | 415 Mission St | Dome Construction Corp | revision to pa #2018-0625-2845: update to the smoke control narrative per pre-application meeting confirmation.Details
revision to pa #2018-0625-2845: update to the smoke control narrative per pre-application meeting confirmation. | |
| Mar 2, 2020 | Expired or cancelled cancelled Jan 2026 | 600 California St | tenant improvement of (e) office building including demo of (e) duct work and installation of new mechanical distribution, new light fixutes, ne recepatalces, and new plumbing fixtuesDetails
tenant improvement of (e) office building including demo of (e) duct work and installation of new mechanical distribution, new light fixutes, ne recepatalces, and new plumbing fixtues | ||
| Feb 27, 2020 | Expired or cancelled cancelled Jan 2026 | 415 Mission St | Dome Construction Corp | 36th- 38th floor: revision to app#201806252845. adding of single duct smoke detector. adjustment of t-24 test (checklist, mech forms) requirements.Details
36th- 38th floor: revision to app#201806252845. adding of single duct smoke detector. adjustment of t-24 test (checklist, mech forms) requirements. | $1,000 |
| Feb 18, 2020 | Completed final sign-off Sep 2021 | 415 Mission St | Dome Construction Corp | revision to pa #201806252845, 37th fl (n) card reader at scrubber; 38th fl wellness redesigned to office; partitions and ceilings, installation of card readers, duct rerouting and electrical/lighting reconfiguration. maher naDetails
revision to pa #201806252845, 37th fl (n) card reader at scrubber; 38th fl wellness redesigned to office; partitions and ceilings, installation of card readers, duct rerouting and electrical/lighting reconfiguration. maher na | $476,032 |
| Oct 11, 2019 | Completed final sign-off Jun 2021 | 600 California St | M C S Construction Services | 2nd & 3rd fl: tenant improvement of office space. installation of new non-load bearing partitions, millwork, cielings, lighting, plumbing fixtures and finishes.Details
2nd & 3rd fl: tenant improvement of office space. installation of new non-load bearing partitions, millwork, cielings, lighting, plumbing fixtures and finishes. | $1,797,500 |
| Jun 7, 2018 | Completed final sign-off Nov 2018 | 44 Montgomery St | Dome Construction Corp | 17th fl - mep of tenant space. adding 2 fire smoke dampers. ref pa 2018-0502-7950- sprinklers and fire alarm separate permits. no new fsd's. n/a for maher.Details
17th fl - mep of tenant space. adding 2 fire smoke dampers. ref pa 2018-0502-7950- sprinklers and fire alarm separate permits. no new fsd's. n/a for maher. | $910,000 |
| Dec 21, 2017 | Completed final sign-off Jul 2021 | 415 Mission St | Dome Construction Corp | 36th fl: installation of non-bearing partitions, ceiling, millworks & fixtures. card readers at elevator lobbies. sprinkler & fire alarm on separate permits. maher naDetails
36th fl: installation of non-bearing partitions, ceiling, millworks & fixtures. card readers at elevator lobbies. sprinkler & fire alarm on separate permits. maher na | $2,762,934 |
| Aug 25, 2017 | Completed final sign-off May 2018 | 44 Montgomery St | Dome Construction Corp | 22/f: mep's & t24 for t.i. install new insta-hst water heaters & plumbing piping, install new electrical outlets (devices/lighting controls) to replace exisitng & meet t-24 requirements. instal new supply deuctwork & vav boxes: sput system for it rooms. - ref t.i. under pa#201708013446.Details
22/f: mep's & t24 for t.i. install new insta-hst water heaters & plumbing piping, install new electrical outlets (devices/lighting controls) to replace exisitng & meet t-24 requirements. instal new supply deuctwork & vav boxes: sput system for it rooms. - ref t.i. under pa#201708013446. | |
| Aug 22, 2017 | Completed final sign-off Apr 2018 | 44 Montgomery St | Dome Construction Corp | 3rd & 4th fl: mep for ti: installation of electrical outlets (devices & lighting controls) to replace (e) & meet t-24 requirements. installation of new supply ductwork and van boxes; split-systems for it rooms. installation of insta-hot water heaters & new piping. ref arch #201708074116. maher naDetails
3rd & 4th fl: mep for ti: installation of electrical outlets (devices & lighting controls) to replace (e) & meet t-24 requirements. installation of new supply ductwork and van boxes; split-systems for it rooms. installation of insta-hot water heaters & new piping. ref arch #201708074116. maher na | |
| Aug 3, 2017 | Completed final sign-off Sep 2019 | 510 Townsend St | Principal Builders Inc. | 4th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13Details
4th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13 | $600,000 |
| Aug 3, 2017 | Completed final sign-off Sep 2019 | 510 Townsend St | Principal Builders Inc. | 5th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13Details
5th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13 | $600,000 |
| Aug 1, 2017 | Completed final sign-off Sep 2019 | 510 Townsend St | Principal Builders Inc. | 3/f- interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under seperate permit. new bldg. pa#201503050110. n/a ordinance #155-13Details
3/f- interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under seperate permit. new bldg. pa#201503050110. n/a ordinance #155-13 | $600,000 |
| Jul 17, 2017 | Completed final sign-off May 2018 | 2 Embarcadero Center | Dome Construction Corp | 17/f- re-fit of mechanical hvac system, new ductwork, pipework and zone boxes. office fit out with (e) electrical panels, new t-24 lighting controls, new restroom plumbing fixtures & water heater, revise fire sprinkler layout. n/a ordinance #155-13, ti ref pa#201707101404Details
17/f- re-fit of mechanical hvac system, new ductwork, pipework and zone boxes. office fit out with (e) electrical panels, new t-24 lighting controls, new restroom plumbing fixtures & water heater, revise fire sprinkler layout. n/a ordinance #155-13, ti ref pa#201707101404 | |
| Jun 14, 2017 | Never finaled issued Jul 2017, no final | 655 Montgomery St | Dome Construction Corp | 6/f & 7/f: ref t.i. 201706078642: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required.Details
6/f & 7/f: ref t.i. 201706078642: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required. | $300,000 |
| Jun 14, 2017 | Never finaled issued Jul 2017, no final | 655 Montgomery St | Dome Construction Corp | 5/f: ref t.i. 2017-0607-8639: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required. life safety deferred.Details
5/f: ref t.i. 2017-0607-8639: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required. life safety deferred. | $150,000 |
| Feb 1, 2017 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | 5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381.Details
5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381. | $1,269,974 |
| Feb 1, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | 4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378.Details
4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378. | $634,987 |