Prakhar Shrestha
- Listed as
- engineer
- Firm
- Waydh Llc
- Based in
- Oakland
- On San Francisco permits
- May 2025 to Oct 2026
14 permits since 2000 (engineer on 14 permits): 1 completed, 13 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 5 Porter St | remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage.Details
remodel & expand (e) 3rd floor to add new bedrooms, bathroos, deck, laundry & stair. remodel (e) 2nd floor to add new living, dining, family room, kitchen, den/library & stair. remodel (e) 1st floor to add new bedroom, media room, bathroom, stair, utility room & garage. | $250,000 | |
| Aug 5, 2026 | In progress issued Aug 2026 | 525 Moultrie St | a)infill the existing opening on the 2nd floor to create a storage room. b) replacement of dry rot wood member around the existing window on the 2nd floor and replace the wood members in kind.Details
a)infill the existing opening on the 2nd floor to create a storage room. b) replacement of dry rot wood member around the existing window on the 2nd floor and replace the wood members in kind. | $6,000 | |
| Jul 7, 2026 | In progress issued Aug 2026 | 913 Florida St | Tolentino Construction & Restoration Inc | reconfiguration of kitchen, living/dining areasand bath; add new en suite bath, all at 2nd floor; convert 1st floor to conditioned space with family room, bedroom and bath. infill of gorund level lightwell.Details
reconfiguration of kitchen, living/dining areasand bath; add new en suite bath, all at 2nd floor; convert 1st floor to conditioned space with family room, bedroom and bath. infill of gorund level lightwell. | $250,000 |
| Jun 17, 2026 | In progress issued Jun 2026 | 559 Gates St | revison to pa# 202604018670. revision to new foundation details based on the site condition and geo tech report.Details
revison to pa# 202604018670. revision to new foundation details based on the site condition and geo tech report. | ||
| May 1, 2026 | In progress issued Jun 2026 | 2547 20th Av | Tolentino Construction & Restoration Inc | reno to reconfigure kitchen, dining and bedrm areas; add 1 new en-suite bath and 1 1 half bath; and reconfigure existing bath all @ 2nd fl; add new interior stair connecting 1st and 2nd fl; and expanding living space @ 1st fl level w/family room; bedroom, bath & office; add 4 new skylightsDetails
reno to reconfigure kitchen, dining and bedrm areas; add 1 new en-suite bath and 1 1 half bath; and reconfigure existing bath all @ 2nd fl; add new interior stair connecting 1st and 2nd fl; and expanding living space @ 1st fl level w/family room; bedroom, bath & office; add 4 new skylights | $300,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 546 Ellsworth St | the project involves the removal and replacement of the existing brick foundation with new concrete foundationDetails
the project involves the removal and replacement of the existing brick foundation with new concrete foundation | $70,000 | |
| Apr 23, 2026 | In progress issued May 2026 | 10 Olympia Wy | Arkspace Design Build Llc | interior house remodel and patio refurbish. 5 bedrooms, 4 bathrooms. remove 1 garage of 2. add 2 bedrooms and 2 baths 1st level. new kitchen 2nd level. add 8 new windows & 2 skylights. new doors throughout. electrical, mechanical, & plumbing system upgrade.Details
interior house remodel and patio refurbish. 5 bedrooms, 4 bathrooms. remove 1 garage of 2. add 2 bedrooms and 2 baths 1st level. new kitchen 2nd level. add 8 new windows & 2 skylights. new doors throughout. electrical, mechanical, & plumbing system upgrade. | $250,000 |
| Apr 13, 2026 | In progress issued Apr 2026 | 559 Gates St | renovations to reconfigure living, dining, and kitchen areas and bath. add bedroom all at 1st fl. add bath at 2nd fl, add new interior stair connecting first floor and basement, expand living space to basement w family room, office, and bath.Details
renovations to reconfigure living, dining, and kitchen areas and bath. add bedroom all at 1st fl. add bath at 2nd fl, add new interior stair connecting first floor and basement, expand living space to basement w family room, office, and bath. | $300,000 | |
| Apr 13, 2026 | In progress issued May 2026 | 584 Sanchez St | front building units 584-586-removal and replacement of (e) brick foundation with concrete foundationDetails
front building units 584-586-removal and replacement of (e) brick foundation with concrete foundation | $75,000 | |
| Apr 2, 2026 | In progress filed Apr 2026, not yet issued | 80 Bronte St | remodel (e) kitchen, living, dining, family rooms and add half bath on 1/f. remodel (e) bedrooms and bathrooms and add bedroom, bath and laundry on 2/f. remodel (e) basement/garage to add bedroom, bath, entry and new stairway.Details
remodel (e) kitchen, living, dining, family rooms and add half bath on 1/f. remodel (e) bedrooms and bathrooms and add bedroom, bath and laundry on 2/f. remodel (e) basement/garage to add bedroom, bath, entry and new stairway. | $150,000 | |
| Apr 1, 2026 | In progress issued Apr 2026 | 559 Gates St | scope of work is limited to the removal and replacement of existing brick foundation with concrete and footingDetails
scope of work is limited to the removal and replacement of existing brick foundation with concrete and footing | $75,000 | |
| Jan 28, 2026 | In progress issued Apr 2026 | 1391 Haight St | yogurt shop: counter, sink, bathroom remodel. the project includes a change of occupancy from the existing occupancy to bDetails
yogurt shop: counter, sink, bathroom remodel. the project includes a change of occupancy from the existing occupancy to b | $70,000 | |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 750 Mansell St | Hello Handy Llc | removal of existing rot wood members supporting rear yard balcony and replacing with new wood members/wood posts/concrete pad footings as show on the plans. there is no dimensional change to balcony. balcony dimensions and extents to match existing conditions. balcony at rear.Details
removal of existing rot wood members supporting rear yard balcony and replacing with new wood members/wood posts/concrete pad footings as show on the plans. there is no dimensional change to balcony. balcony dimensions and extents to match existing conditions. balcony at rear. | $5,000 |
| May 9, 2025 | In progress issued Jun 2025 | 75 Knollview Wy | Aero Living Inc | add new deck with spiral stair to rear of existing dwelling.Details
add new deck with spiral stair to rear of existing dwelling. | $20,000 |