Tolentino Construction & Restoration Inc
- Based in
- Sacramento
- On San Francisco permits
- Sep 2024 to Aug 2026
- Last 24 months
- 11 permits filed
13 permits since 2000: 7 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | In progress issued Aug 2026 | 230 Staples Av | structural revision for side extension at garage foundation structural. structural sheets have been revised by the engineer to reflect updated fndation design and structural 202507150842. refer to detail foundation design & structural details. 1/so.1 & 51/so.2 new s.o.g at garage & bedroom at front.Details
structural revision for side extension at garage foundation structural. structural sheets have been revised by the engineer to reflect updated fndation design and structural 202507150842. refer to detail foundation design & structural details. 1/so.1 & 51/so.2 new s.o.g at garage & bedroom at front. | |
| Jul 7, 2026 | In progress issued Aug 2026 | 913 Florida St | reconfiguration of kitchen, living/dining areasand bath; add new en suite bath, all at 2nd floor; convert 1st floor to conditioned space with family room, bedroom and bath. infill of gorund level lightwell.Details
reconfiguration of kitchen, living/dining areasand bath; add new en suite bath, all at 2nd floor; convert 1st floor to conditioned space with family room, bedroom and bath. infill of gorund level lightwell. | $250,000 |
| May 26, 2026 | Completed final sign-off Jul 2026 | 702 Vallejo St | legalization of previously completed flooring and subrate replacement in retail space, 1st floor, to comply with nov 202654362.Details
legalization of previously completed flooring and subrate replacement in retail space, 1st floor, to comply with nov 202654362. | $2,000 |
| May 1, 2026 | In progress issued Jun 2026 | 2547 20th Av | reno to reconfigure kitchen, dining and bedrm areas; add 1 new en-suite bath and 1 1 half bath; and reconfigure existing bath all @ 2nd fl; add new interior stair connecting 1st and 2nd fl; and expanding living space @ 1st fl level w/family room; bedroom, bath & office; add 4 new skylightsDetails
reno to reconfigure kitchen, dining and bedrm areas; add 1 new en-suite bath and 1 1 half bath; and reconfigure existing bath all @ 2nd fl; add new interior stair connecting 1st and 2nd fl; and expanding living space @ 1st fl level w/family room; bedroom, bath & office; add 4 new skylights | $300,000 |
| Dec 29, 2025 | In progress issued Jun 2026 | 3215 Broderick St | vertical addition. renovation & expansion of (e) 2 units. add level 4, set back from front & rear. reduction of north lightwell. reduce footprint of garage. expand lower unit down into rear garage level (level 1). expand upper unit up to new level 4.Details
vertical addition. renovation & expansion of (e) 2 units. add level 4, set back from front & rear. reduction of north lightwell. reduce footprint of garage. expand lower unit down into rear garage level (level 1). expand upper unit up to new level 4. | $1,000,000 |
| Sep 4, 2025 | In progress issued Jun 2026 | 230 Staples Av | renovation & addition -2nd flr: replace all (e) single pane windows w/ double pan window. enlarge kitchen & bathrm. (n) family rm.(n) upper deck. -1st flr: convert partial garage to utility rm, convert (e) storage to bedrm.#3 & bath.#2, convert (e) bedrm. to game rm, (n) master suite,(n) lower deck.Details
renovation & addition -2nd flr: replace all (e) single pane windows w/ double pan window. enlarge kitchen & bathrm. (n) family rm.(n) upper deck. -1st flr: convert partial garage to utility rm, convert (e) storage to bedrm.#3 & bath.#2, convert (e) bedrm. to game rm, (n) master suite,(n) lower deck. | $505,000 |
| Jul 14, 2025 | Completed final sign-off Jan 2026 | 3761 21st St | install lath front of the house and back and stucco front and back (~1,200 sqft)Details
install lath front of the house and back and stucco front and back (~1,200 sqft) | $10,000 |
| May 22, 2025 | Completed final sign-off Aug 2025 | 3761 21st St | repair roof in some spots. (ref pa# 202505227098 for reroof)Details
repair roof in some spots. (ref pa# 202505227098 for reroof) | $15,000 |
| May 22, 2025 | Completed final sign-off Aug 2025 | 3761 21st St | reroofing- no hotworks (ref pa# 202505227096 for roof repair)Details
reroofing- no hotworks (ref pa# 202505227096 for roof repair) | $15,000 |
| May 20, 2025 | Completed final sign-off Jan 2026 | 3761 21st St | replace all (e) windows, (n) windows at master bedroom & (e) bath #3, (n) master bathroom with 2 (n) skylights, bath #3 renovation, electrical upgrade to 200 amp panel & rewire entire house. kitchen renovation with (n) folding door, relocate powder room. convert (e) bathroom to bedroom #4.Details
replace all (e) windows, (n) windows at master bedroom & (e) bath #3, (n) master bathroom with 2 (n) skylights, bath #3 renovation, electrical upgrade to 200 amp panel & rewire entire house. kitchen renovation with (n) folding door, relocate powder room. convert (e) bathroom to bedroom #4. | $250,000 |
| Mar 14, 2025 | In progress issued Apr 2026 | 122 Hancock St | reconstruction of rear deck and stairs. replace rear windows with fire rated units in same openings. no additional exterior work.Details
reconstruction of rear deck and stairs. replace rear windows with fire rated units in same openings. no additional exterior work. | $75,000 |
| Sep 27, 2024 | Completed final sign-off Nov 2024 | 1735 Mcallister St | revision for permit # 202409090307: replace new countertops, redesign upper cabinets above stove to replace microwave instead of hood copper cabinet above microwave will have a sofit wrapped around w/ drywall. replace current sink w/ new sink.Details
revision for permit # 202409090307: replace new countertops, redesign upper cabinets above stove to replace microwave instead of hood copper cabinet above microwave will have a sofit wrapped around w/ drywall. replace current sink w/ new sink. | $5,000 |
| Sep 9, 2024 | Completed final sign-off Nov 2024 | 1735 Mcallister St | legalize (e) bathroom at bedroom. remove non-bearing pony wall at kitchen.Details
legalize (e) bathroom at bedroom. remove non-bearing pony wall at kitchen. | $10,000 |