Peter Strzebniok
- Listed as
- architect
- Firm
- Nottoscale Architecture
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Dec 2023
11 permits since 2000 (architect on 11 permits): 9 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2023 | Completed final sign-off Mar 2025 | 370 De Haro St | Devlin/Mcnally Construction | #8: interior remodel of extg loft consisting of this remodel of the kitchen, 2 bathrooms, the relocation of the interior stair and a partial of the loft area as well as various buildings.Details
#8: interior remodel of extg loft consisting of this remodel of the kitchen, 2 bathrooms, the relocation of the interior stair and a partial of the loft area as well as various buildings. | $250,000 |
| Apr 16, 2021 | Completed final sign-off Feb 2022 | 10 South Van Ness Av | Ashbury Gen Constructing & Eng | 2/f -legalize framing infill at (e) roof structure to comply with nov 202173933. remove unpermitted framing at 2nd flr.Details
2/f -legalize framing infill at (e) roof structure to comply with nov 202173933. remove unpermitted framing at 2nd flr. | $3,900 |
| Jan 22, 2021 | Completed final sign-off Aug 2023 | 7 Upper Tr | Barton Builders | remodel of ground floor of (e) 2-story, 2 unit residence. demo (e) walls and reconfiguration living room, bedroom, kitchen and bathroom.Details
remodel of ground floor of (e) 2-story, 2 unit residence. demo (e) walls and reconfiguration living room, bedroom, kitchen and bathroom. | $60,000 |
| Feb 5, 2019 | Completed final sign-off Apr 2022 | 329 Moscow St | add unit per ordance 95-17. all work performed in 1st story garage/storage area. replace foundation. excavate slab. repour slab, install radiant floor heating, electrical and plumbing for 600 sqft unit frame and finish. install new windows, doors.Details
add unit per ordance 95-17. all work performed in 1st story garage/storage area. replace foundation. excavate slab. repour slab, install radiant floor heating, electrical and plumbing for 600 sqft unit frame and finish. install new windows, doors. | $50,000 | |
| Jan 22, 2016 | Never finaled issued Feb 2016, no final | 2175 Market St | B-Side Inc. | revision to pa 2015 0323 1653. project work on grnd flr. to add review by dph. establish a "market hall" usage that was approved with planning dept conditional use application dated 4/24/2014. maher naDetails
revision to pa 2015 0323 1653. project work on grnd flr. to add review by dph. establish a "market hall" usage that was approved with planning dept conditional use application dated 4/24/2014. maher na | |
| May 14, 2015 | Completed final sign-off Sep 2015 | 2175 Market St | B-Side Inc. | replace windows in kind at storefront from fixed to retractable garage door type glazing systemDetails
replace windows in kind at storefront from fixed to retractable garage door type glazing system | $20,000 |
| Aug 6, 2014 | Never finaled issued Sep 2014, no final | 900 Marin St | Ashbury Gen Constructing & Eng | seismic retrofit to strengthen the lateral load resisting system to comply with 2013 sfbc. n/a ordinance #155-13.Details
seismic retrofit to strengthen the lateral load resisting system to comply with 2013 sfbc. n/a ordinance #155-13. | $100,000 |
| Dec 30, 2013 | Completed final sign-off Dec 2017 | 900 Marin St | Ashbury Gen Constructing & Eng | interior tenant improvement of extg warehouse into concert venue lounge, industrial kitchen, offices, artist space, a cafe, offices that are accessary to the other uses. ** maher: compliance with ordinance no# 155-13 not required **Details
interior tenant improvement of extg warehouse into concert venue lounge, industrial kitchen, offices, artist space, a cafe, offices that are accessary to the other uses. ** maher: compliance with ordinance no# 155-13 not required ** | $750,000 |
| May 22, 2013 | Completed final sign-off Oct 2013 | 594 Clipper St | Barton Builders | addition of exterior rooftop deck (197 sq ft) to (e) single family residence. addition of exterior access door where before there was a window, re-configuration of roof drainage & water proofing of areaDetails
addition of exterior rooftop deck (197 sq ft) to (e) single family residence. addition of exterior access door where before there was a window, re-configuration of roof drainage & water proofing of area | $25,000 |
| Aug 19, 2010 | Completed final sign-off Jun 2011 | 260 Stockton St | Westridge Builders, Inc. | 3rd floor interior tenant improvement of (e) vacant space (beauty salon) to be used as an orthodontist office. addition of new non-structural partitions, new mdp work & mill work.Details
3rd floor interior tenant improvement of (e) vacant space (beauty salon) to be used as an orthodontist office. addition of new non-structural partitions, new mdp work & mill work. | $150,000 |
| Mar 12, 2010 | Completed final sign-off Oct 2011 | 620 Jones St | B-Side Inc. | interior ti to existing vacant restaurant at lower level space for new restaurant " jones ". work to include new bar, restaurant, plumbing , electrical, and finishes. minor exterior work (trellis, windows/doors).Details
interior ti to existing vacant restaurant at lower level space for new restaurant " jones ". work to include new bar, restaurant, plumbing , electrical, and finishes. minor exterior work (trellis, windows/doors). | $100,000 |