Peter Sokoloff
- Listed as
- architect, authorized agent-others, designer
- Firm
- Foster & Partners
- Based in
- Cupertino
- On San Francisco permits
- Mar 2000 to Mar 2018
21 permits since 2000 (architect on 17 permits, authorized agent-others on 3 permits, designer on 1 permit): 17 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 8, 2018 | Completed final sign-off Jun 2018 | 300 Post St | Seabay Building Group Llc | assembly permit for exterior plaza @ rear of apple store setup is for 2 different assemblies. one with more tables & chairs (151 occupants) with less seating (230 occupants) for various events. no constructionDetails
assembly permit for exterior plaza @ rear of apple store setup is for 2 different assemblies. one with more tables & chairs (151 occupants) with less seating (230 occupants) for various events. no construction | |
| Dec 21, 2017 | Completed final sign-off Mar 2019 | 333 Madison St | Planart Construction Corp | interior renovation to add 2br/1ba to first floor unfinished space. small infill addition at rear, new stairs and reconfiguration of uper living area, new windows & siding, new steps down to rear yard.Details
interior renovation to add 2br/1ba to first floor unfinished space. small infill addition at rear, new stairs and reconfiguration of uper living area, new windows & siding, new steps down to rear yard. | $150,000 |
| May 13, 2016 | Completed final sign-off Jul 2016 | 300 Post St | revision to pa#201312164258-s7, lighting & plumbing changes @ waterfall feature, (previous administrative correction of address under pa#201604285919)Details
revision to pa#201312164258-s7, lighting & plumbing changes @ waterfall feature, (previous administrative correction of address under pa#201604285919) | ||
| Mar 23, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | revision to pa 2013-1216-4256/s5 to coordinate structural supports to video wall.Details
revision to pa 2013-1216-4256/s5 to coordinate structural supports to video wall. | |
| Mar 16, 2016 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | revision to pa 2013-1216-4258 (s5) to coordinate structural support and attachment details for mech equipment under pa 2013-1216-4258 (s7)Details
revision to pa 2013-1216-4258 (s5) to coordinate structural support and attachment details for mech equipment under pa 2013-1216-4258 (s7) | |
| Dec 21, 2015 | Completed final sign-off Jul 2016 | 345 Stockton St | Ledcor Construction Inc | revision to pa 2013-1216-4258 addn #4. changes in field shown delta 26 on plans.Details
revision to pa 2013-1216-4258 addn #4. changes in field shown delta 26 on plans. | |
| Nov 24, 2015 | Completed final sign-off Feb 2017 | 2808 Broadway | Van Acker Const Assoc Inc | revision to appl #201502118051 - approved variance for new streetfront fence, over 6'0. no other workDetails
revision to appl #201502118051 - approved variance for new streetfront fence, over 6'0. no other work | $10,000 |
| Nov 24, 2015 | Completed final sign-off Nov 2016 | 2800 Broadway | Van Acker Const Assoc Inc | revision to appl #201502118044 - aproved variance for new streetfront fence over 6'0. no other workDetails
revision to appl #201502118044 - aproved variance for new streetfront fence over 6'0. no other work | $10,000 |
| Jul 7, 2015 | Completed final sign-off Aug 2016 | 345 Stockton St | Superior Automatic Sprinkler | voluntary upgrade install new 8" double check detector assemblies in existing 8-inch fire service.Details
voluntary upgrade install new 8" double check detector assemblies in existing 8-inch fire service. | $19,100 |
| May 30, 2014 | Completed final sign-off Jul 2016 | 345 Stockton St | Pepper Construction, Ledcor Construction Inc | b2,b3,1st,2nd,3rd,4th & lower roof level - interior demo of (e) unoccupied space per ab-17. work includes non-structural elements, partitions, furniture, equipment, restrooms, hvac, electrical, & plumbing. reference site 2013.1216.4258 (not approved)Details
b2,b3,1st,2nd,3rd,4th & lower roof level - interior demo of (e) unoccupied space per ab-17. work includes non-structural elements, partitions, furniture, equipment, restrooms, hvac, electrical, & plumbing. reference site 2013.1216.4258 (not approved) | $20,000 |
| Apr 29, 2014 | Expired or cancelled expired Feb 2017 | 2808 Broadway | Van Acker Const Assoc Inc | revisoin to pa #2013.0219.0457 - scope of work will include a new bank of skylights on the rear of the pitched roof , not visible from the public right a way.skylights will be metal framed.Details
revisoin to pa #2013.0219.0457 - scope of work will include a new bank of skylights on the rear of the pitched roof , not visible from the public right a way.skylights will be metal framed. | $25,000 |
| Feb 19, 2013 | Expired or cancelled expired Feb 2017 | 2808 Broadway | Van Acker Const Assoc Inc | exterior alterations limited to window repairs & glass replacement on all facades, new fence & planter on broadway, window enlarge on north facade (vallejo st), 3rd floor removal of 2 (e) dormers & installation of new glass sliding windows @ 3rd floor. interior structural & arch work on all floors.Details
exterior alterations limited to window repairs & glass replacement on all facades, new fence & planter on broadway, window enlarge on north facade (vallejo st), 3rd floor removal of 2 (e) dormers & installation of new glass sliding windows @ 3rd floor. interior structural & arch work on all floors. | $1,310,000 |
| Jul 23, 2008 | Completed final sign-off Dec 2008 | 88 Lundys Ln | F R James Construction | revision to 200802205183: new plumbing, mechanical, and electrical work at remodeled 1st floor. new electric warm floor as secondary heating system. new 6' wide door at 1st floor and new header above.Details
revision to 200802205183: new plumbing, mechanical, and electrical work at remodeled 1st floor. new electric warm floor as secondary heating system. new 6' wide door at 1st floor and new header above. | |
| Jun 20, 2008 | Completed final sign-off Apr 2012 | 1349 Clay St | Robert L Crevelon | two-story vertical and 1-story horizontal addition to create (2) 2-story units, roof deck and penthouse. (n) elevator, (n) stairs. (n) decks at 2nd, 3rd and 4th fl. new access gate at leroy pl for required egressDetails
two-story vertical and 1-story horizontal addition to create (2) 2-story units, roof deck and penthouse. (n) elevator, (n) stairs. (n) decks at 2nd, 3rd and 4th fl. new access gate at leroy pl for required egress | $450,000 |
| Jun 20, 2008 | Expired or cancelled withdrawn Jul 2013 | 15 Mullen Av | build new deck with open railing on (e) roof of lightwell at rear of propertyDetails
build new deck with open railing on (e) roof of lightwell at rear of property | $5,000 | |
| Feb 20, 2008 | Completed final sign-off Dec 2008 | 88 Lundys Ln | excavate 12" to create additional ceiling height at new 1st floor bth. remove post and replace beam at 1st floor bedroom. reconfigure interor space at 1st floor to relocate bathroom, closet. n stairs to bathroom at 1st floor. replace windows at 1st floorDetails
excavate 12" to create additional ceiling height at new 1st floor bth. remove post and replace beam at 1st floor bedroom. reconfigure interor space at 1st floor to relocate bathroom, closet. n stairs to bathroom at 1st floor. replace windows at 1st floor | $35,000 | |
| Jan 17, 2008 | Completed final sign-off Dec 2008 | 440 27th St | revision to appl # 200611147642. (1) modify 1st floor plan to avoid neighbor's footing. (2) upgrade floor framing @ 3rd floor & roof. (3) (n) stairs to 3rd fl. (4)- 2(n) dormers at 3rd fl. per sf planning bulletin 96.2. (5) (n) open railing off master bedroom for new roof deck. (6)-(n) skylts @ roofDetails
revision to appl # 200611147642. (1) modify 1st floor plan to avoid neighbor's footing. (2) upgrade floor framing @ 3rd floor & roof. (3) (n) stairs to 3rd fl. (4)- 2(n) dormers at 3rd fl. per sf planning bulletin 96.2. (5) (n) open railing off master bedroom for new roof deck. (6)-(n) skylts @ roof | $50,000 | |
| Jul 3, 2007 | Expired or cancelled expired Mar 2009 | 25 Mirabel Av | revision to application 200512019323 to include:1) replace stairs, retaining walls to basement unit entry. 2) re-bulid stair & reailing to upper unit entry @ front yard.Details
revision to application 200512019323 to include:1) replace stairs, retaining walls to basement unit entry. 2) re-bulid stair & reailing to upper unit entry @ front yard. | $8,500 | |
| Oct 18, 2006 | Completed final sign-off May 2007 | 1708 Broderick St | kitchen remodel-2 relocate bathroom, new windows @ rear facade, new siding @front facade, new windows, new overhang, new planters, replace (e) gate at front.Details
kitchen remodel-2 relocate bathroom, new windows @ rear facade, new siding @front facade, new windows, new overhang, new planters, replace (e) gate at front. | $50,000 | |
| Dec 1, 2004 | Completed final sign-off Apr 2005 | 360 Highland Av | revision to pa# 2003/11/04/9341. removal of non-essential structural work related to possible futureDetails
revision to pa# 2003/11/04/9341. removal of non-essential structural work related to possible future | ||
| Mar 24, 2000 | Completed final sign-off Sep 2001 | 555 Birch St | to erect 4 stories of 2 family dwellingDetails
to erect 4 stories of 2 family dwelling | $275,000 |