Peter Kimelman
- Listed as
- architect, authorized agent-others
- Firm
- Holly Hulburd Design, Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2011 to Aug 2013
8 permits since 2000 (architect on 7 permits, authorized agent-others on 1 permit): 6 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 23, 2013 | Completed final sign-off Jun 2014 | 27 Maiden Ln | basement & 1st floor lobby-remodel & update finishes in basment stairwell. facade work filed under pa# 2013-0513-6767.Details
basement & 1st floor lobby-remodel & update finishes in basment stairwell. facade work filed under pa# 2013-0513-6767. | $55,000 | |
| May 21, 2013 | Completed final sign-off Dec 2013 | 2854 Green St | Moroso Construction Inc | interior renovation of part of 3rd floor. creation of additional bathroom, remodel (e) bathroom, (e) bedroom, relocte laundry area and hallDetails
interior renovation of part of 3rd floor. creation of additional bathroom, remodel (e) bathroom, (e) bedroom, relocte laundry area and hall | $57,680 |
| May 13, 2013 | Completed final sign-off Jun 2014 | 27 Maiden Ln | Hurst & Siebert Inc | remodel of existing facade.Details
remodel of existing facade. | $75,000 |
| May 9, 2013 | Completed final sign-off Nov 2013 | 64 Parker Av | San Francisco Design & Constr. | remodel one unit consists of two floors (3rd & 4th floor). add window to front facade & replace window (everything else to remain the same), lower floor remodel included enlarged kitchen & remodel of powder room, entry, living room & bath. relocate master bath & closet. additoin of 45 sf to ma bedrmDetails
remodel one unit consists of two floors (3rd & 4th floor). add window to front facade & replace window (everything else to remain the same), lower floor remodel included enlarged kitchen & remodel of powder room, entry, living room & bath. relocate master bath & closet. additoin of 45 sf to ma bedrm | $365,844 |
| May 9, 2013 | Expired or cancelled cancelled Apr 2015 | 2340 Larkin St | merge unit 1 and 3 into 1 unit, add a stair to connect the two units internally, rework the upper floor: modify masterr bathroom, closet, bedroom, turn kitchen into bedroom, add one bathroomDetails
merge unit 1 and 3 into 1 unit, add a stair to connect the two units internally, rework the upper floor: modify masterr bathroom, closet, bedroom, turn kitchen into bedroom, add one bathroom | $80,000 | |
| Apr 19, 2013 | Completed final sign-off Dec 2013 | 2854 Green St | Jeff King And Company Inc, Moroso Construction Inc | addition to 3/fl - expansion & renovation of (e) master bath w/ associated electrical & plumbing work.Details
addition to 3/fl - expansion & renovation of (e) master bath w/ associated electrical & plumbing work. | $19,520 |
| Jan 22, 2013 | Never finaled issued Feb 2014, no final | 1157 Washington St | this project consists of: new floor area at 3rd floor. includes office, master bedroom, and one bathroom. addition of (2) windows and a pair of doors to existing roof deck.Details
this project consists of: new floor area at 3rd floor. includes office, master bedroom, and one bathroom. addition of (2) windows and a pair of doors to existing roof deck. | $95,000 | |
| Aug 5, 2011 | Completed final sign-off Apr 2012 | 1170 Sacramento St | Hughes Construction,Inc. | unit#12c on the 12th fl. remodel vestibulem lv rm, 2 bdrms,kitch, bathrms, powder rm. (n) dropped clg in lv rm, master n guest bedrm and kitch. elec work through out, plbg, kitch, bathrms, replacement of hydronic heaters. (n) wd flr throughout except at guest bdrms and bathrms.Details
unit#12c on the 12th fl. remodel vestibulem lv rm, 2 bdrms,kitch, bathrms, powder rm. (n) dropped clg in lv rm, master n guest bedrm and kitch. elec work through out, plbg, kitch, bathrms, replacement of hydronic heaters. (n) wd flr throughout except at guest bdrms and bathrms. | $209,701 |