Hughes Construction,Inc.

Contractor license
828653
State license record
Based in
Redwood
On San Francisco permits
Jan 2006 to Aug 2011
Last 24 months
0 permits filed

3 permits since 2000: 3 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllDeck 1Kitchen remodel 2Bathroom remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
Aug 5, 2011Completed
final sign-off Apr 2012
1170 Sacramento Stunit#12c on the 12th fl. remodel vestibulem lv rm, 2 bdrms,kitch, bathrms, powder rm. (n) dropped clg in lv rm, master n guest bedrm and kitch. elec work through out, plbg, kitch, bathrms, replacement of hydronic heaters. (n) wd flr throughout except at guest bdrms and bathrms.
Details
Permit
201108051913
Status
complete
Filed
Aug 5, 2011
Permit issued
Aug 29, 2011
Final sign-off
Apr 19, 2012
Declared cost
$209,701
Address
1170 Sacramento St

unit#12c on the 12th fl. remodel vestibulem lv rm, 2 bdrms,kitch, bathrms, powder rm. (n) dropped clg in lv rm, master n guest bedrm and kitch. elec work through out, plbg, kitch, bathrms, replacement of hydronic heaters. (n) wd flr throughout except at guest bdrms and bathrms.

Open the permit page

$209,701
Dec 14, 2006Completed
final sign-off Apr 2007
315 Avila Stremodel kitchen & bath. remove & replace (e) 2 sinks, 1 tub, 1 shower, 1 gas line, wood floor & cabinets.
Details
Permit
200612149881
Status
complete
Filed
Dec 14, 2006
Permit issued
Dec 14, 2006
Final sign-off
Apr 19, 2007
Declared cost
$75,000
Address
315 Avila St

remodel kitchen & bath. remove & replace (e) 2 sinks, 1 tub, 1 shower, 1 gas line, wood floor & cabinets.

Open the permit page

$75,000
Jan 20, 2006Completed
final sign-off Nov 2006
123 Corbett Avreplace exg 2 story deck, renovate exg kitchen, replace exg garage door, increase dwelling units from one to two units, all work to conform to variance 2005.0615v, no other work
Details
Permit
200601202690
Status
complete
Filed
Jan 20, 2006
Permit issued
Jun 13, 2006
Final sign-off
Nov 20, 2006
Declared cost
$40,000
Address
123 Corbett Av

replace exg 2 story deck, renovate exg kitchen, replace exg garage door, increase dwelling units from one to two units, all work to conform to variance 2005.0615v, no other work

Open the permit page

$40,000