Paki Kasle-Muthig
- Listed as
- architect, engineer
- Firm
- Paki Architects
- Based in
- Oakland
- On San Francisco permits
- Mar 2016 to Aug 2018
3 permits since 2000 (architect on 2 permits, engineer on 1 permit): 1 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 1, 2018 | Completed final sign-off Oct 2018 | 1773 Turk St | rev to pa#201806010791 to include. replacing 7 windows at rear building. not visible from the street. replace 17ft of foundation at rear of building. the windows are same opening and same location as original windows.Details
rev to pa#201806010791 to include. replacing 7 windows at rear building. not visible from the street. replace 17ft of foundation at rear of building. the windows are same opening and same location as original windows. | $12,000 | |
| Sep 28, 2016 | Never finaled issued Oct 2016, no final | 50 Thomas More Wy | Bach Construction, Inc. | revision to (e) pa#201603162255: structural revision to modify to meet (e) conditions, add 6" to mezzanine height which led to stair modification, minor structural revision- double 2x8 ceiling joists at mezzanine to increae strength, change an lvl wood beam to a steel beam.Details
revision to (e) pa#201603162255: structural revision to modify to meet (e) conditions, add 6" to mezzanine height which led to stair modification, minor structural revision- double 2x8 ceiling joists at mezzanine to increae strength, change an lvl wood beam to a steel beam. | |
| Mar 16, 2016 | Never finaled issued Jun 2016, no final | 50 Thomas More Wy | Bach Construction, Inc. | build-out of platform stage in existing gymnasium space. tenant imrovement of (e) gym only, no exterior work, space include puep/office rooms, storage mezzanine & platform stage. work indludes mechanical & electrical work under deffered permit.Details
build-out of platform stage in existing gymnasium space. tenant imrovement of (e) gym only, no exterior work, space include puep/office rooms, storage mezzanine & platform stage. work indludes mechanical & electrical work under deffered permit. | $200,000 |