Pak Hui
- Listed as
- engineer
- On San Francisco permits
- Feb 2012 to Nov 2015
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 23, 2015 | Completed final sign-off Apr 2016 | 1841 Powell St | soft story upgrade per sfbc chapter 34b engineering criteria fema p-807. soft story upgrade per #66-13. all work in retail basement & 1st story. work to consist of 9n) moment frame & wood shearwalls. work to include 20% for ada upgradesDetails
soft story upgrade per sfbc chapter 34b engineering criteria fema p-807. soft story upgrade per #66-13. all work in retail basement & 1st story. work to consist of 9n) moment frame & wood shearwalls. work to include 20% for ada upgrades | $15,390 | |
| Nov 23, 2015 | Completed final sign-off Apr 2016 | 1843 Powell St | residential contribution of cost to soft story retrofit residential is 73% of overall construction cost. retrofit standard is fema p807. retail portion under pa #201511233330.Details
residential contribution of cost to soft story retrofit residential is 73% of overall construction cost. retrofit standard is fema p807. retail portion under pa #201511233330. | $41,610 | |
| Feb 7, 2012 | Completed final sign-off Mar 2014 | 1355 Market St | Truebeck Construction | at 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.)Details
at 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.) | $785,000 |