Otis Gallagher
- Listed as
- architect, engineer
- Firm
- Lgd
- Based in
- Healdsburg
- On San Francisco permits
- Jul 2025 to Sep 2026
10 permits since 2000 (architect on 9 permits, engineer on 1 permit): 4 completed, 5 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 1200 California St | Mountain Top Construction Llc | #24c: new closet in 2nd bedroom, new kitchen cabinetry appliances & fixtures, remodel primary guest bath, replace fixtures, cabinetry & finishes, new office/guest room door, add w/d to closet space & add new doors, new built ins in livingroom & enclose structural 1 beam, add new doors in closets,Details
#24c: new closet in 2nd bedroom, new kitchen cabinetry appliances & fixtures, remodel primary guest bath, replace fixtures, cabinetry & finishes, new office/guest room door, add w/d to closet space & add new doors, new built ins in livingroom & enclose structural 1 beam, add new doors in closets, | $160,000 |
| Apr 15, 2026 | In progress issued May 2026 | 1170 Sacramento St | Nob Hill Construction | #5c interior remodel primary bathroom + guest bathroom, new finishes and fixtures, cabinetry to remain with new countertops, backsplashes, mirrors and sconces, update recessed can lights, no structural works.Details
#5c interior remodel primary bathroom + guest bathroom, new finishes and fixtures, cabinetry to remain with new countertops, backsplashes, mirrors and sconces, update recessed can lights, no structural works. | $58,000 |
| Apr 10, 2026 | Completed final sign-off Aug 2026 | 1200 California St | Nob Hill Construction | unit 14b, room mr10. remove (e) kitchenette fab and install new cabintry and sink.Details
unit 14b, room mr10. remove (e) kitchenette fab and install new cabintry and sink. | $13,500 |
| Mar 13, 2026 | In progress issued Mar 2026 | 1170 Sacramento St | Nob Hill Construction | unit 5a, drop ceiling to allow for recessed can lighting, new paint, new den millwork, new vanity. no structural work.Details
unit 5a, drop ceiling to allow for recessed can lighting, new paint, new den millwork, new vanity. no structural work. | $195,000 |
| Feb 26, 2026 | In progress issued Feb 2026 | 1333 Jones St | Nob Hill Construction | new kitchen cabinetry, appliances & fixtures. remodel both baths, replace fixtures, cabinetry, add finishes. replace lighting and electrical throughout with new led lighting. replace existing elec fireplace.Details
new kitchen cabinetry, appliances & fixtures. remodel both baths, replace fixtures, cabinetry, add finishes. replace lighting and electrical throughout with new led lighting. replace existing elec fireplace. | $350,000 |
| Feb 11, 2026 | In progress issued Feb 2026 | 1170 Sacramento St | Nob Hill Construction | unit 5d: interior remodel to renovate kitchen and bathrooms. all new led lighting, paint and hardwood floors. no structure work.Details
unit 5d: interior remodel to renovate kitchen and bathrooms. all new led lighting, paint and hardwood floors. no structure work. | $425,000 |
| Oct 17, 2025 | Completed final sign-off Dec 2025 | 1333 Jones St | Nob Hill Construction | unit 1210. demo and replace exterior windows and doors. no structural work.Details
unit 1210. demo and replace exterior windows and doors. no structural work. | $150,000 |
| Sep 17, 2025 | Completed final sign-off Feb 2026 | 1170 Sacramento St | Nob Hill Construction | unit #mrs: replace existing finishes/fixtures at bathroom. new flooring and paint throughout. new kitchenette to include sink. new led lighting throughout. no structuralDetails
unit #mrs: replace existing finishes/fixtures at bathroom. new flooring and paint throughout. new kitchenette to include sink. new led lighting throughout. no structural | $30,000 |
| Jul 15, 2025 | Completed final sign-off Jun 2026 | 1200 California St | Nob Hill Construction | revision to pa # 2025-0425-5272 add plumbing for laundry and wet barDetails
revision to pa # 2025-0425-5272 add plumbing for laundry and wet bar | $40,000 |
| Jul 3, 2025 | Expired or cancelled expired Aug 2026 | 365 Liberty St | Nob Hill Construction, Fontana Construction, Inc. | enclosure of existing primary bedroom balcony to create interior conditioned space. work includes new exterior walls, windows and roofing match existing. hvac and elec intgrated with existing. no structural changes existing load bearingDetails
enclosure of existing primary bedroom balcony to create interior conditioned space. work includes new exterior walls, windows and roofing match existing. hvac and elec intgrated with existing. no structural changes existing load bearing | $40,000 |