Mountain Top Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2020 to Sep 2026
- Last 24 months
- 9 permits filed
80 permits since 2000: 65 completed, 3 in progress, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 5 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 1200 California St | #24c: new closet in 2nd bedroom, new kitchen cabinetry appliances & fixtures, remodel primary guest bath, replace fixtures, cabinetry & finishes, new office/guest room door, add w/d to closet space & add new doors, new built ins in livingroom & enclose structural 1 beam, add new doors in closets,Details
#24c: new closet in 2nd bedroom, new kitchen cabinetry appliances & fixtures, remodel primary guest bath, replace fixtures, cabinetry & finishes, new office/guest room door, add w/d to closet space & add new doors, new built ins in livingroom & enclose structural 1 beam, add new doors in closets, | $160,000 |
| Mar 24, 2026 | Completed final sign-off Jul 2026 | 318 Spear St | unit 8a: remodel 3 bathrooms. tub to shower in master bath. 1 kitchen like for like.Details
unit 8a: remodel 3 bathrooms. tub to shower in master bath. 1 kitchen like for like. | $80,000 |
| Feb 25, 2026 | In progress issued Aug 2026 | 2262 Pine St | addition and interior alts: 2-story rear yard addition. remodel to (e) kitchens and bathrooms. new bathrom on 1/f & 2/f. structural changes to basement only.Details
addition and interior alts: 2-story rear yard addition. remodel to (e) kitchens and bathrooms. new bathrom on 1/f & 2/f. structural changes to basement only. | $299,000 |
| Nov 24, 2025 | In progress issued Nov 2025 | 1278 47th Av | administrative permit to change address from permit number 202511139545 from 1278 48th ave to 1278 47th aveDetails
administrative permit to change address from permit number 202511139545 from 1278 48th ave to 1278 47th ave | |
| Nov 13, 2025 | Expired or cancelled cancelled Feb 2026 | 1278 48th Av | 4 retrofit replacement windows. not visible from street.Details
4 retrofit replacement windows. not visible from street. | $18,000 |
| Oct 30, 2025 | Completed final sign-off Mar 2026 | 1278 47th Av | split master bathroom into 2 bathrooms and relocate master walk in closet. no additional square footage.Details
split master bathroom into 2 bathrooms and relocate master walk in closet. no additional square footage. | $60,000 |
| Oct 23, 2025 | Completed final sign-off Dec 2025 | 2151 Funston Av | laundry room remodel like for like. add 1 outlet, relocate sink, 4 new recessed lights.Details
laundry room remodel like for like. add 1 outlet, relocate sink, 4 new recessed lights. | $20,000 |
| Aug 21, 2025 | Completed final sign-off Dec 2025 | 1630 Greenwich St | full bathroom remodel.Details
full bathroom remodel. | $25,000 |
| Jul 10, 2025 | Completed final sign-off Dec 2025 | 557 28th St | redo the front of the house stucco - like for like. replace dry rot (if necessary). replace the (e) 4 front windows of the house - like for like. double hung to double hung.Details
redo the front of the house stucco - like for like. replace dry rot (if necessary). replace the (e) 4 front windows of the house - like for like. double hung to double hung. | $15,000 |
| Aug 15, 2024 | Completed final sign-off Nov 2024 | 2015 21st Av | repair front stairs in kind. replace front exterior stucco in kind. replace (2) front facing windows in kind & (5) additional windows at side & rear. windows at front to be wood aluminum clad or architectual grade aluminumDetails
repair front stairs in kind. replace front exterior stucco in kind. replace (2) front facing windows in kind & (5) additional windows at side & rear. windows at front to be wood aluminum clad or architectual grade aluminum | $25,000 |
| May 22, 2024 | Completed final sign-off Jun 2025 | 278 28th Av | revision to 202211297266. add site drainage at backyard. reconfigure master bath and middle bedroom at 2nd fl. replace furnace with new furnace and heat pump. add laundry room to basementDetails
revision to 202211297266. add site drainage at backyard. reconfigure master bath and middle bedroom at 2nd fl. replace furnace with new furnace and heat pump. add laundry room to basement | $30,000 |
| Apr 30, 2024 | Completed final sign-off Jun 2025 | 278 28th Av | revision to 202211297266. new footing at garage storage area.Details
revision to 202211297266. new footing at garage storage area. | $50,000 |
| Apr 19, 2024 | Completed final sign-off Jan 2025 | 2135 Lombard St | rev 202402266541- office ti to include minor structural work delta 3 only.Details
rev 202402266541- office ti to include minor structural work delta 3 only. | |
| Feb 29, 2024 | Completed final sign-off Apr 2024 | 1970 Scott St | unit 2: bathroom renaovation, tub to shower conversion same location, new sink toilet and shower valve. no layout changeDetails
unit 2: bathroom renaovation, tub to shower conversion same location, new sink toilet and shower valve. no layout change | $20,000 |
| Feb 26, 2024 | Completed final sign-off Jan 2025 | 2135 Lombard St | revision to pa#202310269556. change to rear stair orientation. additional structural improvements.Details
revision to pa#202310269556. change to rear stair orientation. additional structural improvements. | |
| Jan 30, 2024 | Completed final sign-off Mar 2024 | 95 High St | powder room renovation - new floor tile, sink, fan, and lighting. like for like.Details
powder room renovation - new floor tile, sink, fan, and lighting. like for like. | $10,000 |
| Dec 27, 2023 | Completed final sign-off Feb 2024 | 1923 32nd Av | dry rot repair at garage of existing house, structural repair and replacement in-kind of dry rot column and beam at garage, repair of stucco at the area of work.Details
dry rot repair at garage of existing house, structural repair and replacement in-kind of dry rot column and beam at garage, repair of stucco at the area of work. | $10,000 |
| Oct 26, 2023 | Completed final sign-off Jan 2025 | 2135 Lombard St | change of use and interior ti of an (e) office at 2135 lombard st. (n) 1 story use change to bar w/ no changes to 2rd & 3rd story office uses. scope includes connecting w/ 2125 lombard with communicating opening. relocating shear walls and (n) egress components. mech, fire, ele & plum deferred.Details
change of use and interior ti of an (e) office at 2135 lombard st. (n) 1 story use change to bar w/ no changes to 2rd & 3rd story office uses. scope includes connecting w/ 2125 lombard with communicating opening. relocating shear walls and (n) egress components. mech, fire, ele & plum deferred. | $142,000 |
| Oct 6, 2023 | Completed final sign-off Dec 2023 | 1247 Harrison St | unit #7: kitchen remodel. replace cabinets, relocate fridge water supply, replace countertop & sink. remodel in kind.Details
unit #7: kitchen remodel. replace cabinets, relocate fridge water supply, replace countertop & sink. remodel in kind. | $27,500 |
| Sep 19, 2023 | Completed final sign-off Jan 2024 | 1831 14th Av | demolish (e) powder room and (e) kitchenette walls, add shower and new partiton wall in (e) powder room resulting in (n) bath replace (n) bath window, replace kitchenette counter top and appliancesDetails
demolish (e) powder room and (e) kitchenette walls, add shower and new partiton wall in (e) powder room resulting in (n) bath replace (n) bath window, replace kitchenette counter top and appliances | $50,000 |
| Aug 22, 2023 | Completed final sign-off Nov 2023 | 355 01st St | bathroom remodel - partial. replace tub, tile, adde niche, replace countertop, sink, faucet, and mirror. unit #s1603.Details
bathroom remodel - partial. replace tub, tile, adde niche, replace countertop, sink, faucet, and mirror. unit #s1603. | $15,000 |
| Aug 22, 2023 | Completed final sign-off Mar 2024 | 2125 Bryant St | 3 bathroom remodels. bathroom 1: like to like shower. bathroom 2: like to like shower. bathroom 3: like to like tub to shower.Details
3 bathroom remodels. bathroom 1: like to like shower. bathroom 2: like to like shower. bathroom 3: like to like tub to shower. | $68,000 |
| Jun 26, 2023 | Never finaled issued Sep 2023, no final | 3468 17th St | revision to pa#202104299595. replace additional 4 windows at rear of property w/ siteline brand clad wood units.Details
revision to pa#202104299595. replace additional 4 windows at rear of property w/ siteline brand clad wood units. | $1,000 |
| May 8, 2023 | Completed final sign-off Oct 2023 | 720 York St | unit 201: (1) 43 sq ft (main) bathroom remodel on 2nd floor in kind. no changers to walls or openings. (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes.Details
unit 201: (1) 43 sq ft (main) bathroom remodel on 2nd floor in kind. no changers to walls or openings. (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes. | $29,000 |
| Apr 17, 2023 | Completed final sign-off Aug 2023 | 185 Graystone Tr | bathroom remodel in-kind with curbed shower. no new fixtures. (unit#5)Details
bathroom remodel in-kind with curbed shower. no new fixtures. (unit#5) | $25,000 |
| Apr 17, 2023 | Completed final sign-off Jun 2023 | 1255 Oak St | unit# 1: bathroom remodel- convert tub to curbed shower, wall mounted toilet, install towel heater rod. no new fixtures.Details
unit# 1: bathroom remodel- convert tub to curbed shower, wall mounted toilet, install towel heater rod. no new fixtures. | $25,000 |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 720 York St | one bathroom romodel in kind. replace tub with new tub. non structuralDetails
one bathroom romodel in kind. replace tub with new tub. non structural | $25,000 |
| Jan 25, 2023 | Completed final sign-off Apr 2023 | 1444 Vallejo St | #3. bathroom remodel like for like new shower fixtures, shower door, new tiles with shower pan , new toilet , new vanity light fixtures.Details
#3. bathroom remodel like for like new shower fixtures, shower door, new tiles with shower pan , new toilet , new vanity light fixtures. | $20,000 |
| Jan 11, 2023 | Never finaled issued Mar 2023, no final | 1314 Noe St | revision to bpa#202106212878. moved post inwards so firewall wont be over the sump pump.Details
revision to bpa#202106212878. moved post inwards so firewall wont be over the sump pump. | |
| Dec 30, 2022 | Completed final sign-off Dec 2025 | 557 28th St | exterior stairs repair in kind less than 50%.Details
exterior stairs repair in kind less than 50%. | $15,000 |
| Dec 20, 2022 | Completed final sign-off Mar 2023 | 560 14th St | one bathroom remodel, like for like. one toilet room remodelDetails
one bathroom remodel, like for like. one toilet room remodel | $35,000 |
| Nov 29, 2022 | Completed final sign-off Jun 2025 | 278 28th Av | build a 3 story rear addition,kitchen interior remodel and master bathroom remodel.Details
build a 3 story rear addition,kitchen interior remodel and master bathroom remodel. | $700,000 |
| Nov 15, 2022 | Completed final sign-off Jan 2023 | 701 Minna St | apt #1 - bathroom remodel, new shower. no wall demo, same layoutDetails
apt #1 - bathroom remodel, new shower. no wall demo, same layout | $20,000 |
| Nov 7, 2022 | Never finaled issued Nov 2022, no final | 26 Wright St | kitchen remodel, like for like, appliance to appliance. upgrade sub and main electrical panels.Details
kitchen remodel, like for like, appliance to appliance. upgrade sub and main electrical panels. | $35,000 |
| Nov 1, 2022 | Completed final sign-off Apr 2023 | 686 Guerrero St | unit #2 - 2nd flr: interior remodel of existing kitchen & laundry room. remove (2) existing windows & replace with one larger window at rear. remodel existing bathroom "in-kind".Details
unit #2 - 2nd flr: interior remodel of existing kitchen & laundry room. remove (2) existing windows & replace with one larger window at rear. remodel existing bathroom "in-kind". | $30,000 |
| Sep 27, 2022 | Completed final sign-off Nov 2022 | 255 Red Rock Wy | bathroom remodel in kind, replace tub, toilet, vanity and sink, med. cabinet, light and plumbing fixtures. removing asbetos in same location. (asbestos abatement to be performed by c-22 contractor)Details
bathroom remodel in kind, replace tub, toilet, vanity and sink, med. cabinet, light and plumbing fixtures. removing asbetos in same location. (asbestos abatement to be performed by c-22 contractor) | $28,000 |
| Sep 1, 2022 | Completed final sign-off Jun 2023 | 1501 Filbert St | kitchen remodel in kind. apt 3bDetails
kitchen remodel in kind. apt 3b | $35,000 |
| Jul 25, 2022 | Completed final sign-off Oct 2023 | 25 Sunview Dr | to comply with nov 202292660. adding new deck on the rear side of (e) house. new 3' height fence.Details
to comply with nov 202292660. adding new deck on the rear side of (e) house. new 3' height fence. | $33,000 |
| Apr 27, 2022 | Never finaled issued Apr 2022, no final | 1200 Gough St | 1 like for like bathroom. replace livingroom and entry flooring plank.Details
1 like for like bathroom. replace livingroom and entry flooring plank. | $20,000 |
| Apr 27, 2022 | Completed final sign-off Aug 2022 | 6 Scenic Wy | remodel (1) kitchen like for like and (1) bath like for likeDetails
remodel (1) kitchen like for like and (1) bath like for like | $46,000 |
| Apr 19, 2022 | Completed final sign-off Nov 2022 | 554 23rd Av | like for like one bathroom remodel. 2 new recessed lights. adding a free standing tub.Details
like for like one bathroom remodel. 2 new recessed lights. adding a free standing tub. | $32,500 |
| Mar 8, 2022 | Completed final sign-off Mar 2022 | 1662 14th Av | replace siding with dry rot around eight windows, approximately 160 sq.ft.; work not visible from street.Details
replace siding with dry rot around eight windows, approximately 160 sq.ft.; work not visible from street. | $15,000 |
| Jan 20, 2022 | Completed final sign-off Feb 2022 | 2579 37th Av | revision to pa #202106182802.enlarge window size not visible from the street.Details
revision to pa #202106182802.enlarge window size not visible from the street. | $2,000 |
| Jan 18, 2022 | Completed final sign-off Jun 2022 | 1830 Fillmore St | unit 217: complete one bathroom remodel like for likeDetails
unit 217: complete one bathroom remodel like for like | $30,000 |
| Dec 8, 2021 | Completed final sign-off Jun 2022 | 312 19th Av | 2nd floor - 2 bathrooms remodel like to like, 5'x10' and 5'x8'.Details
2nd floor - 2 bathrooms remodel like to like, 5'x10' and 5'x8'. | $48,000 |
| Nov 9, 2021 | Completed final sign-off Apr 2023 | 2242 48th Av | 2 bathroom remodel, kitchen remodel @ 2nd flDetails
2 bathroom remodel, kitchen remodel @ 2nd fl | $170,000 |
| Sep 30, 2021 | Completed final sign-off Oct 2021 | 3239 Mission St | unit 5: replace two toilet seats with toilet seats with bidet feature. add water line for bidet, add outlet for bidet, patch and paint wall. work in two bathrooms.Details
unit 5: replace two toilet seats with toilet seats with bidet feature. add water line for bidet, add outlet for bidet, patch and paint wall. work in two bathrooms. | $5,000 |
| Sep 20, 2021 | Completed final sign-off Mar 2022 | 509 Frederick St | remodel kitchen like to like. h.e. lightingDetails
remodel kitchen like to like. h.e. lighting | $30,000 |
| Sep 16, 2021 | Completed final sign-off Feb 2022 | 65 Albion St | relocate outlet in existing laundry room, install new outlet in existing laundry room extend hot/cold lines for washer/dryer hook up, extend heatinglines for sink, install cabinets in laundry room, run new kitchen duct for hood ventDetails
relocate outlet in existing laundry room, install new outlet in existing laundry room extend hot/cold lines for washer/dryer hook up, extend heatinglines for sink, install cabinets in laundry room, run new kitchen duct for hood vent | $10,000 |
| Aug 11, 2021 | Completed final sign-off Aug 2021 | 934 Oak St | replace 2 wood posts and 1 beam in from of exterior garage door for same size, using existing brackets.Details
replace 2 wood posts and 1 beam in from of exterior garage door for same size, using existing brackets. | $3,000 |
| Aug 11, 2021 | Completed final sign-off Mar 2022 | 623 Spruce St | one bathroom remodel like to like. replace tub with walk-in shower. h.e. lightingDetails
one bathroom remodel like to like. replace tub with walk-in shower. h.e. lighting | $18,000 |
| Jun 22, 2021 | Completed final sign-off Oct 2021 | 1225 Shrader St | (1) kitchen remodel like-to-like, upgrade subpanel, replace light fixture w/fan in living roomDetails
(1) kitchen remodel like-to-like, upgrade subpanel, replace light fixture w/fan in living room | $42,000 |
| Jun 21, 2021 | Completed final sign-off Jun 2023 | 1314 Noe St | remove (e) deck and build new one. like for lokeDetails
remove (e) deck and build new one. like for loke | $12,000 |
| Jun 18, 2021 | Completed final sign-off Feb 2022 | 2579 37th Av | relocate bathroom. install 2 windows (not facing street). build another bedroom with 2 closets.Details
relocate bathroom. install 2 windows (not facing street). build another bedroom with 2 closets. | $45,000 |
| Jun 2, 2021 | Never finaled issued Jun 2021, no final | 53 Glenview Dr | hang a 6x8 wall with a glass opening 12x5 located at top of staircase. install 1 new doorDetails
hang a 6x8 wall with a glass opening 12x5 located at top of staircase. install 1 new door | $5,000 |
| May 19, 2021 | Completed final sign-off Sep 2021 | 1750 Taylor St | unit #202: 2 bathrooms remodel. 1st bathroom: like to like, shower. 2nd bathroom: like to like, converting tub to walk-in shower.Details
unit #202: 2 bathrooms remodel. 1st bathroom: like to like, shower. 2nd bathroom: like to like, converting tub to walk-in shower. | $40,000 |
| Apr 13, 2021 | Completed final sign-off Aug 2021 | 861 Lombard St | bathroom remodel in kind. replace tub with shower. replace 1 window at rear. toilet room remodel like to like. kitchen remodel like to like. no change in layout or walls & opening.Details
bathroom remodel in kind. replace tub with shower. replace 1 window at rear. toilet room remodel like to like. kitchen remodel like to like. no change in layout or walls & opening. | $60,000 |
| Mar 16, 2021 | Never finaled issued Mar 2021, no final | 555 04th St | like to like bathroom remodel. create showerpan. install 3 new recess lights.Details
like to like bathroom remodel. create showerpan. install 3 new recess lights. | $16,000 |
| Mar 16, 2021 | Completed final sign-off Oct 2025 | 933 Wisconsin St | 2nd floor remove 2 interior walls parallel with building side walls. existing roof joists will be sistered with new lvl joists to span across the other removed interior wall. 2 posts will be provided and continue all the way down to basement floor.Details
2nd floor remove 2 interior walls parallel with building side walls. existing roof joists will be sistered with new lvl joists to span across the other removed interior wall. 2 posts will be provided and continue all the way down to basement floor. | $30,000 |
| Mar 11, 2021 | Never finaled issued Mar 2021, no final | 53 Glenview Dr | remove e wood burning stove. patch exterior. add 3 outlets in room, add lights in gareage, living rm, update electrical in 2 bedrooms, replace 4 doors same size, fixt faucet in kitchenDetails
remove e wood burning stove. patch exterior. add 3 outlets in room, add lights in gareage, living rm, update electrical in 2 bedrooms, replace 4 doors same size, fixt faucet in kitchen | $15,000 |
| Feb 2, 2021 | Completed final sign-off Mar 2021 | 4763 18th St | reinstall and remodel existing bathroom where fixtures were removed without pemrit. no change to (e) plumbing in place.Details
reinstall and remodel existing bathroom where fixtures were removed without pemrit. no change to (e) plumbing in place. | $20,000 |
| Dec 3, 2020 | Never finaled issued Dec 2020, no final | 3731 Fillmore St | unit 5: replacing window in bathroom, same size/retrofitDetails
unit 5: replacing window in bathroom, same size/retrofit | $500 |
| Nov 18, 2020 | Completed final sign-off Oct 2025 | 933 Wisconsin St | retrofit window vinyl facing the left siding of the property (non street facing). expand bathroom window located on left siding of property. extg measurements are 2'x1'. we will expand the bottom by 1'. the heather will remain.Details
retrofit window vinyl facing the left siding of the property (non street facing). expand bathroom window located on left siding of property. extg measurements are 2'x1'. we will expand the bottom by 1'. the heather will remain. | $3,000 |
| Nov 18, 2020 | Completed final sign-off Feb 2021 | 1129 Broderick St | complete bathroom remodel. relocate plumbing. switch tub and vanity.Details
complete bathroom remodel. relocate plumbing. switch tub and vanity. | $18,000 |
| Nov 12, 2020 | Completed final sign-off Oct 2025 | 933 Wisconsin St | 2 bathrooms remodeling like to likeDetails
2 bathrooms remodeling like to like | $43,000 |
| Nov 4, 2020 | Completed final sign-off Dec 2020 | 520 Chestnut St | apt#304: replacing a tub and tile around tub - same location.Details
apt#304: replacing a tub and tile around tub - same location. | $8,000 |
| Nov 3, 2020 | Completed final sign-off Nov 2020 | 3749 Clement St | water proof front deckDetails
water proof front deck | $10,000 |
| Oct 27, 2020 | Completed final sign-off Dec 2020 | 1450 Greenwich St | #404: bathroom remodel in kind.Details
#404: bathroom remodel in kind. | $17,000 |
| Oct 21, 2020 | Completed final sign-off Oct 2020 | 30 Avalon Av | replacing 5 back windows retrofit like to like. non-street facing.Details
replacing 5 back windows retrofit like to like. non-street facing. | $2,000 |
| Oct 8, 2020 | Completed final sign-off Dec 2020 | 3731 Fillmore St | bathroom remodeling. removing tub and toilet. no change in layoutDetails
bathroom remodeling. removing tub and toilet. no change in layout | $18,000 |
| Oct 8, 2020 | Completed final sign-off Mar 2021 | 1860 Ellis St | bathroom remodel like to like. bathroom remodel like to like. adding four recessed lights in kitchen. no change in layoutDetails
bathroom remodel like to like. bathroom remodel like to like. adding four recessed lights in kitchen. no change in layout | $45,000 |
| Sep 25, 2020 | Completed final sign-off Jan 2021 | 4650 18th St | bathroom remodeling line to line. add an outlet in bathroom, add recessed light in bathroomDetails
bathroom remodeling line to line. add an outlet in bathroom, add recessed light in bathroom | $20,000 |
| Sep 16, 2020 | Never finaled issued Aug 2023, no final | 3055 22nd Av | new second fl addition. extend bedroom on second floor over (e) first floor.Details
new second fl addition. extend bedroom on second floor over (e) first floor. | $50,000 |
| Sep 2, 2020 | Completed final sign-off Jul 2021 | 3749 Clement St | install siding on exterior wall @ entrance and on bay windows.Details
install siding on exterior wall @ entrance and on bay windows. | $10,000 |
| Aug 13, 2020 | Completed final sign-off Jul 2021 | 3749 Clement St | remove and replace stucco with new stucco & wood on exterior walls (front and side). replace windows and slight doors (2 front & 1 rear) fiber glass windowsDetails
remove and replace stucco with new stucco & wood on exterior walls (front and side). replace windows and slight doors (2 front & 1 rear) fiber glass windows | $150,000 |
| Jul 29, 2020 | Never finaled issued Jul 2020, no final | 479 Orizaba Av | bathroom remodel. change sliding door to a window in existing opening.Details
bathroom remodel. change sliding door to a window in existing opening. | $25,000 |
| Jul 29, 2020 | Completed final sign-off Sep 2020 | 250 Ralston St | fireplace removal only.Details
fireplace removal only. | $5,000 |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 258 28th Av | replace 1 window in the bathroom, same size. replace 1 window in bath with a smaller windowDetails
replace 1 window in the bathroom, same size. replace 1 window in bath with a smaller window | $3,500 |
| Feb 26, 2020 | Completed final sign-off Jun 2020 | 258 28th Av | remodel bathroom, in-kind.Details
remodel bathroom, in-kind. | $20,000 |
| Feb 26, 2020 | Expired or cancelled cancelled Jan 2026 | 258 28th Av | bathroom remodeling like to like - replace tub to shower, make 1 window smaller, replace another window, same location & replace tile, window is not visible from street, add outlet to bathroom.Details
bathroom remodeling like to like - replace tub to shower, make 1 window smaller, replace another window, same location & replace tile, window is not visible from street, add outlet to bathroom. | $22,000 |