Nicolas Sowers
- Listed as
- architect
- Firm
- Nick Sowers, Architect
- Based in
- Alameda
- On San Francisco permits
- Sep 2013 to Jan 2020
7 permits since 2000 (architect on 7 permits): 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 8, 2020 | Completed final sign-off Sep 2020 | 606 Banks St | Reliable Construction Inc | ground fl & 2nd fl remodel within building envelope. relocated bedroom and bathrrom, and add new den on ground floor.Details
ground fl & 2nd fl remodel within building envelope. relocated bedroom and bathrrom, and add new den on ground floor. | $50,000 |
| Sep 24, 2019 | Completed final sign-off Feb 2021 | 221 Surrey St | kitchen remodel: replace cabinets, countrop snd appliances in-kind. replace (e) skylight in (e) opening. remove fireplace and non-structural wall between living and dining rooms. rebuilding (e) interiors stairs and add rear facing window.Details
kitchen remodel: replace cabinets, countrop snd appliances in-kind. replace (e) skylight in (e) opening. remove fireplace and non-structural wall between living and dining rooms. rebuilding (e) interiors stairs and add rear facing window. | $10,000 | |
| Aug 23, 2019 | Completed final sign-off Mar 2020 | 221 Surrey St | lower level remodel convert 196 sq ft garage into bath. (bath,den) relocate non structural back wall of garage to enlarge the den. replace all windows with wood clad and enlarge 1 window at rear elevationDetails
lower level remodel convert 196 sq ft garage into bath. (bath,den) relocate non structural back wall of garage to enlarge the den. replace all windows with wood clad and enlarge 1 window at rear elevation | $16,000 | |
| Jul 24, 2019 | Completed final sign-off Nov 2019 | 650 Mission St | Kleytman Construction Company Inc | change of use from office to gym. bathroom remodel & replacement of existing lightsDetails
change of use from office to gym. bathroom remodel & replacement of existing lights | $30,000 |
| Dec 22, 2014 | Expired or cancelled withdrawn Sep 2015 | 3252 19th St | vertical addition of two (2) stories to (e) two story structure, renovate (e) warehouse/office w/ (n) stairs, bathrms & elevatore & finishes (n) 3rd fl will be arts & entertainment assembly space. (n) 4th flr will be a 2-bedroom res'd unit w/roof deck.Details
vertical addition of two (2) stories to (e) two story structure, renovate (e) warehouse/office w/ (n) stairs, bathrms & elevatore & finishes (n) 3rd fl will be arts & entertainment assembly space. (n) 4th flr will be a 2-bedroom res'd unit w/roof deck. | $750,000 | |
| Oct 1, 2013 | Completed final sign-off Dec 2013 | 2184 Greenwich St | change of use from retail to personal service fitness studio. accessibility upgrades and misc finishes. removeal of exterior door and infill windowDetails
change of use from retail to personal service fitness studio. accessibility upgrades and misc finishes. removeal of exterior door and infill window | $9,000 | |
| Sep 19, 2013 | Completed final sign-off Jun 2014 | 3360 20th St | Stellalux Construction | for change of use (s1 to b occupancy) not an e occup. t.i w/in an (e) conc + wood framed bldg. work includes a community workshop for children's education (parents remain with children at all times), support area w/desk + casework, employee break room & updated electrical thruout. no exterior work.Details
for change of use (s1 to b occupancy) not an e occup. t.i w/in an (e) conc + wood framed bldg. work includes a community workshop for children's education (parents remain with children at all times), support area w/desk + casework, employee break room & updated electrical thruout. no exterior work. | $45,000 |