Kleytman Construction Company Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Jun 2021
- Last 24 months
- 0 permits filed
16 permits since 2000: 14 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2021 | Completed final sign-off Sep 2021 | 4628 Anza St | condo conversion correction, minor code correction per physical inspection report #8505. patch ceiling, replace duct/common area, repair groundingDetails
condo conversion correction, minor code correction per physical inspection report #8505. patch ceiling, replace duct/common area, repair grounding | $1,000 |
| Nov 20, 2019 | Completed final sign-off Dec 2019 | 650 Mission St | revison to pa# 2019-0919-2112: install washer and dryer on ground floorDetails
revison to pa# 2019-0919-2112: install washer and dryer on ground floor | |
| Nov 13, 2019 | Completed final sign-off Jun 2021 | 2226 22nd Av | reduce extg garage/laundry area & convert into media room and office. add new bathroom & laundry room at ground floor. convert extg family room into bedroom. replace extg windows and add new door at rear. relocate stairs. enclose 2 exstg lighwells. add nw bathroom & closet @ 2nd fl.Details
reduce extg garage/laundry area & convert into media room and office. add new bathroom & laundry room at ground floor. convert extg family room into bedroom. replace extg windows and add new door at rear. relocate stairs. enclose 2 exstg lighwells. add nw bathroom & closet @ 2nd fl. | $180,000 |
| Sep 19, 2019 | Never finaled issued Sep 2019, no final | 650 Mission St | install sump pump w/d in the basement equipment roomDetails
install sump pump w/d in the basement equipment room | $2,000 |
| Sep 5, 2019 | Completed final sign-off Dec 2019 | 650 Mission St | to erect 1 electric single faced sign 18'x 2.3' (performforlife)Details
to erect 1 electric single faced sign 18'x 2.3' (performforlife) | $2,000 |
| Aug 28, 2019 | Completed final sign-off Dec 2019 | 650 Mission St | sheetrock a room in basement only. no framing workDetails
sheetrock a room in basement only. no framing work | $1,000 |
| Aug 12, 2019 | Completed final sign-off Sep 2019 | 905 Columbus Av | correct nov 201964911, only item #3a & 3b. less than 50% of the stairs. install guardrain at rear & roof exits.Details
correct nov 201964911, only item #3a & 3b. less than 50% of the stairs. install guardrain at rear & roof exits. | $300 |
| Jul 24, 2019 | Completed final sign-off Nov 2019 | 650 Mission St | change of use from office to gym. bathroom remodel & replacement of existing lightsDetails
change of use from office to gym. bathroom remodel & replacement of existing lights | $30,000 |
| Jun 27, 2018 | Completed final sign-off Feb 2019 | 3161 16th St | to correct his nov#201863611 dated 5/15/2018, door hinges, door hardware, floor tiles repair, window repair, smoke detector replacement, leak repair.Details
to correct his nov#201863611 dated 5/15/2018, door hinges, door hardware, floor tiles repair, window repair, smoke detector replacement, leak repair. | $500 |
| Jun 27, 2018 | Completed final sign-off Feb 2019 | 3161 16th St | to correct his nov#201870127 dated 6/7/2018, repair floor tiles, ceiling, adjust hardware, repair windowDetails
to correct his nov#201870127 dated 6/7/2018, repair floor tiles, ceiling, adjust hardware, repair window | $500 |
| Jun 25, 2018 | Expired or cancelled expired Feb 2025 | 660 Naples St | reroofingDetails
reroofing | $9,000 |
| Apr 17, 2018 | Completed final sign-off Jun 2018 | 908 Post St | bathroom remodel, replace toilet & sinkDetails
bathroom remodel, replace toilet & sink | $5,200 |
| Sep 18, 2017 | Completed final sign-off Dec 2017 | 545 Mission St | (2) bathrooms remodel: replace faucets, toilet with water efficient, replace lights with energy efficient, replace wall tile (partial), replace counter tops with sinks, replace mirrors. no walls re-configuration. all existing layouts to remain unchanged.Details
(2) bathrooms remodel: replace faucets, toilet with water efficient, replace lights with energy efficient, replace wall tile (partial), replace counter tops with sinks, replace mirrors. no walls re-configuration. all existing layouts to remain unchanged. | $15,600 |
| Jun 14, 2017 | Completed final sign-off Aug 2017 | 2489 Harrison St | revision to pa 2017-0322-2077 shearwall revisionsDetails
revision to pa 2017-0322-2077 shearwall revisions | |
| Mar 22, 2017 | Completed final sign-off Aug 2017 | 2489 Harrison St | revision to pa#201702109192, revise kitchen pantry & closet, revise 3/f & 4/f framing plans. n/a ordinance #155-13Details
revision to pa#201702109192, revise kitchen pantry & closet, revise 3/f & 4/f framing plans. n/a ordinance #155-13 | |
| Feb 10, 2017 | Completed final sign-off Aug 2017 | 2489 Harrison St | units #2489 & 2491: interior renovation only of the (e) lower unit (#2489) on 2nd flr & (e) middle unit (#2491) on 3rd lfr - including removal of interior walls and remodel of the kitchens, bathrooms & closets. convert 1 car garage into 2 car garage. n/a maherDetails
units #2489 & 2491: interior renovation only of the (e) lower unit (#2489) on 2nd flr & (e) middle unit (#2491) on 3rd lfr - including removal of interior walls and remodel of the kitchens, bathrooms & closets. convert 1 car garage into 2 car garage. n/a maher | $120,000 |