22 permits since 2000 (architect on 21 permits, engineer on 1 permit): 19 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 25, 2026 | In progress issued Mar 2026 | 1483 Sutter St | Alpha Restoration & Wateproof | common area: replace seismic joint waterproofing west side of buiding on the 3/f & 4/f. remove plants & planter wallers to make area part of the deck.Details
common area: replace seismic joint waterproofing west side of buiding on the 3/f & 4/f. remove plants & planter wallers to make area part of the deck. | $75,000 |
| Jun 5, 2025 | Completed final sign-off Oct 2025 | 2001 Mcallister St | Bigo Construction Inc. | deck repair per plans (balcony repairs in kind) remove & replace damaged beam per plans. remove & redo waterproofing per plans. remove & redo stucco where needed & cedar shingles. install temporary scaffold & shoringDetails
deck repair per plans (balcony repairs in kind) remove & replace damaged beam per plans. remove & redo waterproofing per plans. remove & redo stucco where needed & cedar shingles. install temporary scaffold & shoring | $44,000 |
| Nov 26, 2024 | In progress issued Feb 2025 | 5175 Diamond Heights Bl | Alp Construction & Painting Inc | 44 units: each unit: balcony dry-rot repair & railing replacement.Details
44 units: each unit: balcony dry-rot repair & railing replacement. | $440,000 |
| Jul 21, 2023 | Completed final sign-off Dec 2024 | 2001 Mcallister St | Saarman Construction,Ltd. | unit 329: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,installDetails
unit 329: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,install | $38,200 |
| Jul 21, 2023 | Completed final sign-off Dec 2024 | 2001 Mcallister St | Saarman Construction,Ltd. | unit 254: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,installDetails
unit 254: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,install | $38,200 |
| Jul 20, 2023 | Completed final sign-off Dec 2024 | 2001 Mcallister St | Saarman Construction,Ltd. | unit 333: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,installDetails
unit 333: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,install | $38,200 |
| Jul 20, 2023 | Completed final sign-off Dec 2024 | 2001 Mcallister St | Saarman Construction,Ltd. | unit 246: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,installDetails
unit 246: close decks barricading the doors to the decks, remove railings and store, demo flashing,trim & siding @ doors as needed and dispose of debris, demo deck including siding, sufficient to install new flashing & waterproofing per plans. repair joists,shearwall & framing as required,install | $38,200 |
| Jul 20, 2023 | Completed final sign-off Dec 2024 | 2001 Mcallister St | Saarman Construction,Ltd. | unit 255: close decks barricading the doors to the decks, remove railings and store, demo flashing, trim and siding at doors as needed and dispose of debris, demo deck including siding sufficient to install new flashing and waterproofing per plans, repair joists, shear wall and framing as requiredDetails
unit 255: close decks barricading the doors to the decks, remove railings and store, demo flashing, trim and siding at doors as needed and dispose of debris, demo deck including siding sufficient to install new flashing and waterproofing per plans, repair joists, shear wall and framing as required | $38,200 |
| Jun 12, 2023 | Completed final sign-off Jul 2024 | 143 Maiden Ln | Alpha Restoration & Wateproof | re-attach loose terra cotta and repair cracked terra cotta on top of 8thg fl geary st elevator. per nov 202306628 and building facade inspection ab110 by ferrari moe llc dated 5/10/23Details
re-attach loose terra cotta and repair cracked terra cotta on top of 8thg fl geary st elevator. per nov 202306628 and building facade inspection ab110 by ferrari moe llc dated 5/10/23 | $10,000 |
| May 19, 2022 | Completed final sign-off Aug 2023 | 1100 Sacramento St | Alpha Restoration & Wateproof | structural repairs to the concrete columns, beams, joise + slabs. removal & replacement of the waterproofing membrane and overlaying finishes at the viewing garden.Details
structural repairs to the concrete columns, beams, joise + slabs. removal & replacement of the waterproofing membrane and overlaying finishes at the viewing garden. | $480,000 |
| Sep 23, 2020 | Completed final sign-off Jun 2022 | 2412 Polk St | Bigo Construction Inc. | voluntary strengthening repair per plans. new foundation, new shear walls, new steel beam (replacement)Details
voluntary strengthening repair per plans. new foundation, new shear walls, new steel beam (replacement) | $60,000 |
| Dec 19, 2016 | Completed final sign-off Mar 2018 | 301 Bryant St | Alpha Restoration & Wateproof | all units: replace (e) electric heaters with ducted electric fan coils in same location. replace (e) exhaust fans. other various mechanical repairs. ref pa#201606099587 for exterior repair work.Details
all units: replace (e) electric heaters with ducted electric fan coils in same location. replace (e) exhaust fans. other various mechanical repairs. ref pa#201606099587 for exterior repair work. | $300,000 |
| Oct 25, 2016 | Completed final sign-off Mar 2017 | 1 Montgomery St | Rainbow Waterproofing & Restor | 3rd floor - to comply with complaint #201613126. install 6 ornamental column shells to replace extg cracked ornamental column shells surrounding extg tube steel columns.Details
3rd floor - to comply with complaint #201613126. install 6 ornamental column shells to replace extg cracked ornamental column shells surrounding extg tube steel columns. | $25,000 |
| Jun 9, 2016 | Never finaled issued Nov 2016, no final | 301 Bryant St | Alpha Restoration & Wateproof | full replacement of cement plaster including new exterior sheathing.wet seal all non-fire rated window systems in place, remove & replace all fire rated windows,apply(n)top coat on decks.installed(n)overlay roof system membrane &skylight & other roof repair.Details
full replacement of cement plaster including new exterior sheathing.wet seal all non-fire rated window systems in place, remove & replace all fire rated windows,apply(n)top coat on decks.installed(n)overlay roof system membrane &skylight & other roof repair. | $64,500 |
| Jan 27, 2016 | Completed final sign-off May 2018 | 3995 Alemany Bl | Andrew Chekene Enterprises/ Dba Ac Enter | bldg 1 & 4: courtyard/podium level waterproofing, podium level private deck waterproofing, private use decks above podium level, elevated workway waterproofing repairs, siding and trim replacement, stucco repairs, guard rail repairs, windows replacements, no interior work. all repairs to be in-kind.Details
bldg 1 & 4: courtyard/podium level waterproofing, podium level private deck waterproofing, private use decks above podium level, elevated workway waterproofing repairs, siding and trim replacement, stucco repairs, guard rail repairs, windows replacements, no interior work. all repairs to be in-kind. | $3,500,000 |
| Oct 29, 2015 | Completed final sign-off Sep 2017 | 50 Fremont St | Swinerton Builders | demo of (e) sidewalk topping and pavers to replace with new concrete and pavers. removal of (e) waterproofing and replace with new water proofing. please refer to coversheet for a more detailed breakdown at 'project descript/scope of work". in kind replacement. n/a ordinance #155-13Details
demo of (e) sidewalk topping and pavers to replace with new concrete and pavers. removal of (e) waterproofing and replace with new water proofing. please refer to coversheet for a more detailed breakdown at 'project descript/scope of work". in kind replacement. n/a ordinance #155-13 | $2,000,000 |
| Jul 13, 2015 | Completed final sign-off Aug 2016 | 1160 Mission St | Alpha Restoration & Wateproof | various floors: caulking repairs, recoating water tables & balcony decks, podium level @ 5th floor water proofing at base of building & under the store front windows. n/a maher ordinanceDetails
various floors: caulking repairs, recoating water tables & balcony decks, podium level @ 5th floor water proofing at base of building & under the store front windows. n/a maher ordinance | $400,000 |
| Mar 11, 2015 | Completed final sign-off Nov 2016 | 3911 Alemany Bl | Andrew Chekene Enterprises/ Dba Ac Enter | bldg 2 & 3 common area- courtyard/podium level waterproofig, podium level private deck waterproofing, private use decks above podium level, elevated walkway waterproofing repairs, siding & trim replacement, stucco & guardrail repairs, window replacements in kind, w/at siding only. maher - not req'dDetails
bldg 2 & 3 common area- courtyard/podium level waterproofig, podium level private deck waterproofing, private use decks above podium level, elevated walkway waterproofing repairs, siding & trim replacement, stucco & guardrail repairs, window replacements in kind, w/at siding only. maher - not req'd | $2,450,000 |
| Nov 8, 2013 | Completed final sign-off Dec 2014 | 1 Crescent Wy | Andrew Chekene Enterprises/ Dba Ac Enter | common area- remove & replace stucco, flashing and waterproofing inside courtyards. remove & replace decayed framing where found with like.remove and replace concrete topping at walkway to perform repairs.no structural work.Details
common area- remove & replace stucco, flashing and waterproofing inside courtyards. remove & replace decayed framing where found with like.remove and replace concrete topping at walkway to perform repairs.no structural work. | $750,000 |
| Jan 24, 2013 | Completed final sign-off Jan 2017 | 845 Montgomery St | Alpha Restoration & Wateproof | for common area. replace wall tiles at 4 & 5/f. restore wood windows. repoint brick walls at montgomery st facade & courtyard at ne courtyard & lightwell. replace glass panels.Details
for common area. replace wall tiles at 4 & 5/f. restore wood windows. repoint brick walls at montgomery st facade & courtyard at ne courtyard & lightwell. replace glass panels. | $200,000 |
| Feb 1, 2012 | Completed final sign-off May 2013 | 650 Delancey St | Alpha Restoration & Wateproof | work @ unit# 101 only. revision to pa# 2011/10/20/7232. add paint stripping & painting of historic sign spec.Details
work @ unit# 101 only. revision to pa# 2011/10/20/7232. add paint stripping & painting of historic sign spec. | $5,000 |
| Jun 1, 2011 | Completed final sign-off Nov 2011 | 400 Montgomery St | repairs to facade-include water-proofing measures, sandstone restoration & painting of window trim. all repairs to be done in kind & extensive care to be taken to pressure mistoric contentDetails
repairs to facade-include water-proofing measures, sandstone restoration & painting of window trim. all repairs to be done in kind & extensive care to be taken to pressure mistoric content | $168,000 |