Michael Rane Downey
- Listed as
- architect, authorized agent-others, designer
- Firm
- Gensler &L Associates
- Based in
- San Ramon
- On San Francisco permits
- Jul 2002 to Jan 2020
14 permits since 2000 (architect on 11 permits, authorized agent-others on 2 permits, designer on 1 permit): 11 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 14, 2020 | Completed final sign-off Oct 2021 | 633 Folsom St | Principal Builders Inc. | demo and removal of slab on levels 1-8 shown on plans. structural work for level 2 slab reinforcement and support in areas where portions of slab proposed to be removed. stallation of new service elevatorDetails
demo and removal of slab on levels 1-8 shown on plans. structural work for level 2 slab reinforcement and support in areas where portions of slab proposed to be removed. stallation of new service elevator | $500,000 |
| Dec 13, 2017 | Never finaled issued Dec 2017, no final | 4638 Mission St | Clune Construction Company L P | voluntary accessibility barrier removal project to relocate (e) interior atm to provide proper turning radius for wheelchair. no work on exterior.Details
voluntary accessibility barrier removal project to relocate (e) interior atm to provide proper turning radius for wheelchair. no work on exterior. | $26,065 |
| Sep 15, 2017 | Completed final sign-off May 2018 | 315 Montgomery St | G Swanson Constr. Inc. | 1/f- t.i. modifications to include relocated access ramp and stairs, new financial and client advisor rooms & client meeting rooms, new ceilings. (e) restrooms and breakrooms to remain. new furniture and finishes. n/a ordinance #155-13Details
1/f- t.i. modifications to include relocated access ramp and stairs, new financial and client advisor rooms & client meeting rooms, new ceilings. (e) restrooms and breakrooms to remain. new furniture and finishes. n/a ordinance #155-13 | $700,000 |
| Mar 31, 2015 | Completed final sign-off Jul 2015 | 433 Cortland Av | G Swanson Constr. Inc. | conversion of (e) traditional bank to express type. demo (e) teller line, vault, coupon booth, restrooms and elec rm. new accessible restroom, (n) interior finishes (n) 24 hour ata vestibule, (n) open and enclosed offices. exterior to be repaired to match existingDetails
conversion of (e) traditional bank to express type. demo (e) teller line, vault, coupon booth, restrooms and elec rm. new accessible restroom, (n) interior finishes (n) 24 hour ata vestibule, (n) open and enclosed offices. exterior to be repaired to match existing | $1,100,000 |
| Apr 11, 2013 | Completed final sign-off Mar 2014 | 55 Cyril Magnin St | Newland Interiors | renovate (e) fitness center into 6 guestrooms.(5th floor) renovate (e) concrete lounge into 3 additional guestrooms.(31/f) no soil disturbaqnceDetails
renovate (e) fitness center into 6 guestrooms.(5th floor) renovate (e) concrete lounge into 3 additional guestrooms.(31/f) no soil disturbaqnce | $513,290 |
| Sep 21, 2012 | Completed final sign-off Jan 2014 | 1811 19th Av | Merbrink Construction Inc | interior remodel of existing bank including new offices, new cubicles, new finishes and new bank equipment.Details
interior remodel of existing bank including new offices, new cubicles, new finishes and new bank equipment. | $123,771 |
| Sep 21, 2012 | Completed final sign-off Dec 2013 | 5655 Geary Bl | Gidel & Kocal Construction Co Inc | interior 1st floor remodel of existing bank including new finishes, new ada teller and coupon booths, new elevator, new private offices on 2nd floor, new restrooms, new cubiclesDetails
interior 1st floor remodel of existing bank including new finishes, new ada teller and coupon booths, new elevator, new private offices on 2nd floor, new restrooms, new cubicles | $400,000 |
| Dec 6, 2011 | Expired or cancelled expired Oct 2013 | 303 02nd St | Turner Construction Co | 3rd floor-revision to pa# 2011-0803-1668-change the exiting due to problems in the fieldDetails
3rd floor-revision to pa# 2011-0803-1668-change the exiting due to problems in the field | $14,000 |
| Aug 16, 2011 | Completed final sign-off Nov 2011 | 200 Paul Av | Dpr Construction | 4th floor: demo (e) non structural walls, doors. remove & store (e) fences & gates. remove & store (e) mechanical equipment. remove electrical, plumbing, duct work, associated with equipmentDetails
4th floor: demo (e) non structural walls, doors. remove & store (e) fences & gates. remove & store (e) mechanical equipment. remove electrical, plumbing, duct work, associated with equipment | $66,000 |
| Sep 8, 2010 | Completed final sign-off Jun 2011 | 303 02nd St | Turner Construction Co | 5th floor t.i. , demolition of paritions etc, new non-load bearing partitions, carpet paint, finishes, existing ceiling system to remain in place. mep's under separate permit /submitted later, no structural work.Details
5th floor t.i. , demolition of paritions etc, new non-load bearing partitions, carpet paint, finishes, existing ceiling system to remain in place. mep's under separate permit /submitted later, no structural work. | $300,000 |
| Jul 8, 2010 | Completed final sign-off May 2011 | 501 Castro St | Hathaway Dinwiddie Co. | install bandit barrier (ballistic fiberglass) on top of existing tellerline. modify safe deposit area to comply with code.Details
install bandit barrier (ballistic fiberglass) on top of existing tellerline. modify safe deposit area to comply with code. | $84,000 |
| Apr 7, 2008 | Completed final sign-off Oct 2008 | 575 Market St | Gci, Inc | partial floor tenant improvement to cinstruct doors, walls and partitions on the 29th floor. mep and fire prevention under separate permitsDetails
partial floor tenant improvement to cinstruct doors, walls and partitions on the 29th floor. mep and fire prevention under separate permits | $150,000 |
| Jan 11, 2005 | Completed final sign-off Jan 2005 | 180 Montgomery St | Hathaway Dinwiddie Co. | interior demolition of the 14th floorDetails
interior demolition of the 14th floor | $17,000 |
| Jul 22, 2002 | Expired or cancelled expired Feb 2003 | 848 Battery St | demolition of interior partitions on 1st flr-full title 24 disabled access to be under ti build outDetails
demolition of interior partitions on 1st flr-full title 24 disabled access to be under ti build out | $5,000 |