18 permits since 2000 (engineer on 17 permits, architect on 1 permit): 12 completed, 6 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 19, 2022 | Never finaled issued Oct 2022, no final | 1065 Baker St | Modern Craft Construction | revision to bpa#202209303544, shear wall revisions due to field conditionsDetails
revision to bpa#202209303544, shear wall revisions due to field conditions | |
| Jul 25, 2022 | Never finaled issued Aug 2022, no final | 579 19th Av | C&N Construction Group Inc | revision to bpa# 201904228558. show footing and detail for permitted stairs. rear stairs requires footing not shown in originally permitted plans.Details
revision to bpa# 201904228558. show footing and detail for permitted stairs. rear stairs requires footing not shown in originally permitted plans. | $1,000 |
| Sep 10, 2021 | Never finaled filed Sep 2021, never issued | 70 Montezuma St | A L V Construction Inc | voluntary structural improvement to (e) front balcony, new steel beams.Details
voluntary structural improvement to (e) front balcony, new steel beams. | $10,000 |
| Mar 7, 2019 | Completed final sign-off Nov 2019 | 48 Coventry Ct | C G Adams Construction | interior remodel; kitchen, stairway, 2 bath rooms, bedroom remodel, laundry closet, new fav & tankless water heaterDetails
interior remodel; kitchen, stairway, 2 bath rooms, bedroom remodel, laundry closet, new fav & tankless water heater | $200,000 |
| Feb 13, 2019 | Completed final sign-off Feb 2020 | 654 15th Av | Modern Craft Construction | remodel kitchen and bath at 2nd fl add powder rm. 2nd fl add 2nd full bath, remodel master bath. voluntary seismic upgrade.Details
remodel kitchen and bath at 2nd fl add powder rm. 2nd fl add 2nd full bath, remodel master bath. voluntary seismic upgrade. | $75,000 |
| Aug 23, 2018 | Never finaled issued Aug 2018, no final | 453 Douglass St | Duffin Construction | kitchen remodel and bearing wall removed at 2nd floor.Details
kitchen remodel and bearing wall removed at 2nd floor. | $25,000 |
| Dec 1, 2017 | Completed final sign-off Dec 2018 | 1750 29th Av | Colvin Construction Dba A A Construction, Modern Craft Construction | replace existing site retaining walls w/new concrete retaining walls at rear yard.Details
replace existing site retaining walls w/new concrete retaining walls at rear yard. | $50,000 |
| Dec 1, 2017 | Completed final sign-off Oct 2018 | 166 Bridgeview Dr | voluntary strengthening on top floor trace holddowns to foundation.Details
voluntary strengthening on top floor trace holddowns to foundation. | $10,000 | |
| Oct 10, 2017 | Completed final sign-off Nov 2018 | 350 Teresita Bl | Modern Craft Construction | changing storage into acclimated space including bedroom, full bath & 1/2 bath, study room and mudroom at 1st story; reconfigure interior stairs, relocated kitchen & bath & add (n) bath; new wood deck off rear yard, new windows & skylightsDetails
changing storage into acclimated space including bedroom, full bath & 1/2 bath, study room and mudroom at 1st story; reconfigure interior stairs, relocated kitchen & bath & add (n) bath; new wood deck off rear yard, new windows & skylights | $65,000 |
| Sep 15, 2017 | Completed final sign-off Sep 2018 | 2313 Webster St | De Brus Construction Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $30,000 |
| Jan 31, 2017 | Completed final sign-off Jul 2017 | 278 Randall St | Modern Craft Construction | 2nd floor - interior remodel of (e) kitchen, bearing wall removal and bath addition on 2/f. lighting to comply with cec 150(k).Details
2nd floor - interior remodel of (e) kitchen, bearing wall removal and bath addition on 2/f. lighting to comply with cec 150(k). | $60,000 |
| Dec 13, 2016 | Completed final sign-off Oct 2017 | 459 Teresita Bl | Bethel Construction Inc Dba Aaa Construc | convert (e) ground floor storage platform into 3 bedrooms, 3 baths, a dressing area and a closet. add a hall to the existing garage for egress from the ground floor to the exterior. habitable space addition of 298 sq. ft.Details
convert (e) ground floor storage platform into 3 bedrooms, 3 baths, a dressing area and a closet. add a hall to the existing garage for egress from the ground floor to the exterior. habitable space addition of 298 sq. ft. | $130,000 |
| May 6, 2016 | Completed final sign-off Aug 2016 | 2562 21st Av | new sunken patio & retaining wall in rear yardDetails
new sunken patio & retaining wall in rear yard | $20,000 | |
| Jan 29, 2016 | Never finaled filed Jan 2016, never issued | 369 Oak St | infill (e) overhanging 2nd floor (371 oak street) for horizontal expansion into rear yard on 1st floor (369 oak street). remodel interior of 369 oak street. adding an additional full master bathroom. kitchen & bath remodel. new lighting, electrical & hvac. reconfig (e) rear deck.Details
infill (e) overhanging 2nd floor (371 oak street) for horizontal expansion into rear yard on 1st floor (369 oak street). remodel interior of 369 oak street. adding an additional full master bathroom. kitchen & bath remodel. new lighting, electrical & hvac. reconfig (e) rear deck. | $210,000 | |
| Jan 29, 2016 | Never finaled filed Jan 2016, never issued | 371 Oak St | relocate door to rear yard.Details
relocate door to rear yard. | $15,000 | |
| Dec 30, 2015 | Completed final sign-off Sep 2016 | 775 Guerrero St | Ryan Construction | soft story retrofit per sfbc ch 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc ch 34b, 2012 iebc appendix a-4 | $60,000 |
| Jul 23, 2015 | Completed final sign-off May 2016 | 140 Clarendon Av | A L V Construction Inc | remove existing exterior stairs, not a required means of egress, add new deck at side light court, less than 10 feet above gradeDetails
remove existing exterior stairs, not a required means of egress, add new deck at side light court, less than 10 feet above grade | $8,000 |
| Jul 2, 2015 | Completed final sign-off Jun 2017 | 367 Oak St | addendum/detail to permit 2015-03-03-9864. include architectural & structural detail drawing for parking pad. 1 new plumbing outlet and lights for parking.Details
addendum/detail to permit 2015-03-03-9864. include architectural & structural detail drawing for parking pad. 1 new plumbing outlet and lights for parking. |