Bethel Construction Inc Dba Aaa Construc
- Based in
- San Bruno
- On San Francisco permits
- Mar 2009 to Mar 2026
- Last 24 months
- 2 permits filed
50 permits since 2000: 42 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 9, 2026 | Completed final sign-off May 2026 | 1001 Pine St | unit 1104: replace shower wall and floor tiles, repace shower door, and hand sink, replace light fixtures.Details
unit 1104: replace shower wall and floor tiles, repace shower door, and hand sink, replace light fixtures. | $14,000 |
| Jun 18, 2025 | Completed final sign-off Nov 2025 | 16 Knollview Wy | window replace on front side (2ea) st facing.Details
window replace on front side (2ea) st facing. | $4,500 |
| Apr 20, 2023 | Completed final sign-off Jul 2023 | 1159 Hyde St | unit# 5: kitchen remodeling as kind.Details
unit# 5: kitchen remodeling as kind. | $14,000 |
| Dec 20, 2022 | Completed final sign-off Mar 2023 | 166 Hearst Av | change counter top, back splash, and floor tiles.(e) kitchen cabinets to remainDetails
change counter top, back splash, and floor tiles.(e) kitchen cabinets to remain | $10,000 |
| Mar 10, 2022 | Completed final sign-off Sep 2022 | 1227 Divisadero St | replace rear building siding approx 300 sqft. repair damaged rear deck and stair in kind. < 50% repair back yard fence 25 ftDetails
replace rear building siding approx 300 sqft. repair damaged rear deck and stair in kind. < 50% repair back yard fence 25 ft | $12,000 |
| Mar 3, 2022 | Completed final sign-off Mar 2022 | 1818 Great Hy | rev to pa202012020116: update to structural plans regarding beam sizes and framing changes, foundation defects.Details
rev to pa202012020116: update to structural plans regarding beam sizes and framing changes, foundation defects. | |
| Feb 14, 2022 | Completed final sign-off Feb 2022 | 321 Castro St | revision to bpa#201908269779. revise cost by adding $60,000 by inspection.Details
revision to bpa#201908269779. revise cost by adding $60,000 by inspection. | |
| Feb 10, 2022 | Completed final sign-off Oct 2022 | 317 Lexington St | down stairs unit kitchen remodel; no removal of wallsDetails
down stairs unit kitchen remodel; no removal of walls | $8,000 |
| Feb 9, 2022 | Never finaled issued Feb 2022, no final | 34 Sola Av | replacing termite infested studs in kind. living room exterior wall 45' of studs. including 4 windowsDetails
replacing termite infested studs in kind. living room exterior wall 45' of studs. including 4 windows | $6,000 |
| Dec 3, 2021 | Completed final sign-off Jul 2022 | 21 Isis St | unit 201. kitchen remodeling in kindDetails
unit 201. kitchen remodeling in kind | $10,000 |
| Sep 24, 2021 | Completed final sign-off May 2022 | 415 Cornwall St | inteiror renovation on 3rd fl master bedroom suite, inlcuding, lighting,plumbing fixtures, relocate one rear facade sling door.no expansion of envelope or added sqft.Details
inteiror renovation on 3rd fl master bedroom suite, inlcuding, lighting,plumbing fixtures, relocate one rear facade sling door.no expansion of envelope or added sqft. | $55,000 |
| Sep 7, 2021 | Completed final sign-off Sep 2022 | 34 Sola Av | 1st & 2nd fl: remodel bathroom 1: replace w/c, lav, shower, tub, & add lav, new finishes, new door. remodel bath 2: replace w/c, lav & shower, new finishes. remove 1/2 bath: w/c & lav.Details
1st & 2nd fl: remodel bathroom 1: replace w/c, lav, shower, tub, & add lav, new finishes, new door. remodel bath 2: replace w/c, lav & shower, new finishes. remove 1/2 bath: w/c & lav. | $35,000 |
| May 28, 2021 | Never finaled issued May 2021, no final | 243 32nd Av | remodel kitchen 7 change 1/2 bathroom's door swing from in-swing to reverse swing at same location same size.Details
remodel kitchen 7 change 1/2 bathroom's door swing from in-swing to reverse swing at same location same size. | $14,000 |
| May 11, 2021 | Completed final sign-off Sep 2021 | 300 03rd St | kitchen remodeling & retiling bathroom floor. replacing cabinet & countertop.Details
kitchen remodeling & retiling bathroom floor. replacing cabinet & countertop. | $14,000 |
| Dec 2, 2020 | Completed final sign-off Mar 2022 | 1818 Great Hy | renovation of 2/f kitchen with minor int. wall change. raise ceiling 2/f living/kitchen max 12ft; new struct per plans. replace 2/f tub with walk-in shwr, curbed; no envelope expansion.Details
renovation of 2/f kitchen with minor int. wall change. raise ceiling 2/f living/kitchen max 12ft; new struct per plans. replace 2/f tub with walk-in shwr, curbed; no envelope expansion. | $40,000 |
| Nov 24, 2020 | Completed final sign-off Sep 2021 | 29 Parker Av | interior remodel including cabinetry reconfiguration and relocation of appliances and new finishes. no change in number of fixtures or appliances. rear yard replacement in kind. no horizontal or vertical extensions. no work visible from the streetDetails
interior remodel including cabinetry reconfiguration and relocation of appliances and new finishes. no change in number of fixtures or appliances. rear yard replacement in kind. no horizontal or vertical extensions. no work visible from the street | $25,000 |
| Aug 26, 2020 | Completed final sign-off Dec 2020 | 118 Noriega St | 1st floor: kitchen and bathroom remodelingDetails
1st floor: kitchen and bathroom remodeling | $34,000 |
| Aug 13, 2020 | Completed final sign-off Dec 2020 | 2450 Quintara St | remodel 1 kitchen and 1 bathroom. no wall movingDetails
remodel 1 kitchen and 1 bathroom. no wall moving | $25,000 |
| Jul 22, 2020 | Completed final sign-off Jan 2021 | 3367 21st St | remodeling.Details
remodeling. | $14,000 |
| Jul 17, 2020 | Completed final sign-off Apr 2022 | 321 Castro St | replace existing footing, reinforce existing settled bay windowDetails
replace existing footing, reinforce existing settled bay window | $15,000 |
| Mar 3, 2020 | Never finaled issued Mar 2020, no final | 44 Midcrest Wy | stucco part of front and side of house. replace in-kind. total square feet is 960 ft2. ref pa#2019.0424.8805Details
stucco part of front and side of house. replace in-kind. total square feet is 960 ft2. ref pa#2019.0424.8805 | $9,000 |
| Jan 21, 2020 | Completed final sign-off Mar 2020 | 813 Cole St | bathroom: replace bath tub, tile, toilet, vanity, replace receptacles (gfci)Details
bathroom: replace bath tub, tile, toilet, vanity, replace receptacles (gfci) | $5,000 |
| Nov 19, 2019 | Completed final sign-off May 2020 | 40 Jersey St | work at unit 40 only, includes removing (e) entry door and relocating engry to existing garden door. existing bedroom to be enlarged by removal oe (e) non-load bearing wallDetails
work at unit 40 only, includes removing (e) entry door and relocating engry to existing garden door. existing bedroom to be enlarged by removal oe (e) non-load bearing wall | $1,000 |
| Oct 25, 2019 | Completed final sign-off Dec 2019 | 405 Arguello Bl | in master bathroom: change tiles, remove (e) vanity cabinet and install new one at same placeDetails
in master bathroom: change tiles, remove (e) vanity cabinet and install new one at same place | $15,000 |
| Aug 26, 2019 | Completed final sign-off Feb 2022 | 321 Castro St | rearrange room layout @ 2nd flr & 3rd flr. add family rm & full bathroom at grnd flr w/ spiral stair connected to 2nd flr. extend 1 parking in front of (e) parking (interior)Details
rearrange room layout @ 2nd flr & 3rd flr. add family rm & full bathroom at grnd flr w/ spiral stair connected to 2nd flr. extend 1 parking in front of (e) parking (interior) | $120,000 |
| Aug 21, 2019 | Completed final sign-off Nov 2019 | 645 Santiago St | revision to pa 2018-1009-2555 modification to permit drawings adu kitchenette, minor interior modification to the upper unit. adding a new deck.Details
revision to pa 2018-1009-2555 modification to permit drawings adu kitchenette, minor interior modification to the upper unit. adding a new deck. | $5,000 |
| Apr 30, 2019 | Completed final sign-off Jan 2020 | 360 Somerset St | revision to 201901301571. to do backyard retaining wall, new footing on front shoring, new footing below entry stairs. change of header at garage door.Details
revision to 201901301571. to do backyard retaining wall, new footing on front shoring, new footing below entry stairs. change of header at garage door. | $80,000 |
| Apr 24, 2019 | Completed final sign-off Nov 2020 | 44 Midcrest Wy | interior remodeling at ground fl and 2nd fl kitchen, dining, living area, including the addition of front, side and rear windows and a rear exit door. replacement interior stair as a convenience stair (the ground fl exiting will be to the backyard safe dispersal area).Details
interior remodeling at ground fl and 2nd fl kitchen, dining, living area, including the addition of front, side and rear windows and a rear exit door. replacement interior stair as a convenience stair (the ground fl exiting will be to the backyard safe dispersal area). | $190,000 |
| Apr 2, 2019 | Completed final sign-off Feb 2021 | 152 Evelyn Wy | remove (e) backyard stair/porch, int remodel both flrs w/new habitable space. hall & bath at grnd flr. replacement foundation/slab at reportion of grnd flr. new/replacement windows at sides/rear/porch. new side doors & 2 new skylights. no proposed work at facadeDetails
remove (e) backyard stair/porch, int remodel both flrs w/new habitable space. hall & bath at grnd flr. replacement foundation/slab at reportion of grnd flr. new/replacement windows at sides/rear/porch. new side doors & 2 new skylights. no proposed work at facade | $210,000 |
| Oct 9, 2018 | Never finaled issued Jun 2019, no final | 645 Santiago St | convert (e) ground level study & family rm to (n) accessory dwelling unit per ordinance 162-16. (590 sf). (e) internal staircase to be removed & add (n) kitchenette. (e) door to garage to be removed & add (n) laundry.Details
convert (e) ground level study & family rm to (n) accessory dwelling unit per ordinance 162-16. (590 sf). (e) internal staircase to be removed & add (n) kitchenette. (e) door to garage to be removed & add (n) laundry. | $10,000 |
| Apr 24, 2018 | Completed final sign-off Jul 2018 | 1675 Turk St | replace kitchen appliances, replace stove/microwave, remodel cabinets & kitche counter in kind. replace bathroom vanity & sink in kind. no structural work. nno wall removalDetails
replace kitchen appliances, replace stove/microwave, remodel cabinets & kitche counter in kind. replace bathroom vanity & sink in kind. no structural work. nno wall removal | $20,000 |
| Nov 10, 2017 | Completed final sign-off Jan 2018 | 1829 08th Av | bath remodel, new fixture/tiling. adding a toilet and a sink to change from one full bath to 1 and 1/2 bath on 2nd fl.Details
bath remodel, new fixture/tiling. adding a toilet and a sink to change from one full bath to 1 and 1/2 bath on 2nd fl. | $30,000 |
| Oct 25, 2017 | Expired or cancelled expired Jan 2020 | 838 47th Av | replace in-kind front stairs (less than 50% replacement). revision to 201709299941.Details
replace in-kind front stairs (less than 50% replacement). revision to 201709299941. | $13,000 |
| Oct 12, 2017 | Completed final sign-off Nov 2017 | 1829 08th Av | kitchen remodel - replace ounter top & appliances in kind.Details
kitchen remodel - replace ounter top & appliances in kind. | $13,000 |
| Sep 29, 2017 | Completed final sign-off Nov 2017 | 834 47th Av | repair/replace dryrot wood siding on south side of house in kind. no bbn no notice required.Details
repair/replace dryrot wood siding on south side of house in kind. no bbn no notice required. | $3,500 |
| Sep 29, 2017 | Completed final sign-off Jan 2018 | 838 47th Av | repair stucco wall in kind at front of house. 12 sq foot area. no bbn no notice required.Details
repair stucco wall in kind at front of house. 12 sq foot area. no bbn no notice required. | $1,700 |
| Jun 1, 2017 | Completed final sign-off Oct 2019 | 55 Sequoia Wy | infill of (e) 2nd floor lightwell, 4 new skylights, 2 parapet walls (not visible from street), interior remodeling at 2nd flr w/new stair to ground floor. int remodel at ground flr to add a bedroom, family room, bath, & laundry room. no facade changes.Details
infill of (e) 2nd floor lightwell, 4 new skylights, 2 parapet walls (not visible from street), interior remodeling at 2nd flr w/new stair to ground floor. int remodel at ground flr to add a bedroom, family room, bath, & laundry room. no facade changes. | $140,000 |
| May 26, 2017 | Completed final sign-off Apr 2018 | 1013 De Haro St | r&r countertops, add backsplash,r&r sink,faucets, add bar height countertop extension (wood) add ceiling hung cabinets about island,add integrated led lgihting under cabinets, swich dimmer,wine storage,wall mounted dining bench,move 2 electrical outlets,rr appliances,electrical for oven,microwaveDetails
r&r countertops, add backsplash,r&r sink,faucets, add bar height countertop extension (wood) add ceiling hung cabinets about island,add integrated led lgihting under cabinets, swich dimmer,wine storage,wall mounted dining bench,move 2 electrical outlets,rr appliances,electrical for oven,microwave | $25,000 |
| Dec 29, 2016 | Expired or cancelled cancelled Oct 2022 | 44 Midcrest Wy | rear (1)story addition w/ roof deck, rear replacement stair from proposed deck to rear yard w/ bottom concrete landing, interior remodel @ both floors (including (n) full bath & half bath), & (n) windows, doors & a skylight.Details
rear (1)story addition w/ roof deck, rear replacement stair from proposed deck to rear yard w/ bottom concrete landing, interior remodel @ both floors (including (n) full bath & half bath), & (n) windows, doors & a skylight. | $170,000 |
| Dec 13, 2016 | Completed final sign-off Oct 2017 | 459 Teresita Bl | convert (e) ground floor storage platform into 3 bedrooms, 3 baths, a dressing area and a closet. add a hall to the existing garage for egress from the ground floor to the exterior. habitable space addition of 298 sq. ft.Details
convert (e) ground floor storage platform into 3 bedrooms, 3 baths, a dressing area and a closet. add a hall to the existing garage for egress from the ground floor to the exterior. habitable space addition of 298 sq. ft. | $130,000 |
| Nov 7, 2016 | Completed final sign-off Jan 2017 | 320 Garfield St | reroofingDetails
reroofing | $8,000 |
| Nov 2, 2016 | Completed final sign-off Nov 2017 | 320 Garfield St | rear deck at second floor, door to deck, rear stair from ground floor to rear yard with firewall, guardrails at existing rear yard patio retaining walls and handrail at existing rear yard concrete stair and proposed stairDetails
rear deck at second floor, door to deck, rear stair from ground floor to rear yard with firewall, guardrails at existing rear yard patio retaining walls and handrail at existing rear yard concrete stair and proposed stair | $10,000 |
| Sep 23, 2016 | Completed final sign-off Feb 2017 | 320 Garfield St | revision to 201609157827 to add a closet at the entry hall, remove the (e) closet at bedroom 3, recinfigure the (e) bedroom 2 closet, and add a second floor hall closet adjacent to bedrooms 2 and 3. all changes are clouded with delta 2. see the related pre application findings #6 & 7 on sht a-0.1Details
revision to 201609157827 to add a closet at the entry hall, remove the (e) closet at bedroom 3, recinfigure the (e) bedroom 2 closet, and add a second floor hall closet adjacent to bedrooms 2 and 3. all changes are clouded with delta 2. see the related pre application findings #6 & 7 on sht a-0.1 | |
| Sep 15, 2016 | Completed final sign-off Feb 2017 | 320 Garfield St | conversion of (e) ground floor social room into bedrm 4. interior remodeling at ground floor to add an entry closet and a walk-in closet and expand bath for bedroom 4. interior remodeling at 2nd floor to adjust the layout and remove the (e) wall between the living room and kitchen/dining room area.Details
conversion of (e) ground floor social room into bedrm 4. interior remodeling at ground floor to add an entry closet and a walk-in closet and expand bath for bedroom 4. interior remodeling at 2nd floor to adjust the layout and remove the (e) wall between the living room and kitchen/dining room area. | $90,000 |
| Sep 2, 2016 | Completed final sign-off Aug 2017 | 459 Teresita Bl | rear yard access stair from ground floor and door to stair at existing rear wall window location.Details
rear yard access stair from ground floor and door to stair at existing rear wall window location. | $15,000 |
| May 31, 2016 | Completed final sign-off Jul 2016 | 118 Noriega St | to comply with # 201619991, kitchen , countertop, sink, cabinets, to be installed , floor to be tiled in bathroom & kitchen , bathroom tub vanity, sink to be replaced, & toilets, wires to be reused back door replaced & repairing stairs <50% yard ,(e) siding to be repaced, all work on top unit onlyDetails
to comply with # 201619991, kitchen , countertop, sink, cabinets, to be installed , floor to be tiled in bathroom & kitchen , bathroom tub vanity, sink to be replaced, & toilets, wires to be reused back door replaced & repairing stairs <50% yard ,(e) siding to be repaced, all work on top unit only | $18,000 |
| Oct 20, 2015 | Completed final sign-off Apr 2016 | 5934 Fulton St | develop part of gr fl non habitable space. add full bath and storage rooms. drywall existing garage. install storage cabinets, closet with hookup for washing machine.replace 3 rear windows (2 in storage room 1 in new bathroom). install (2) 20 minute rated doors.Details
develop part of gr fl non habitable space. add full bath and storage rooms. drywall existing garage. install storage cabinets, closet with hookup for washing machine.replace 3 rear windows (2 in storage room 1 in new bathroom). install (2) 20 minute rated doors. | $50,000 |
| Jun 24, 2014 | Never finaled issued Jun 2014, no final | 5934 Fulton St | repair existing bathroom water closet & tub / shower sink. drywall at brick underground plumbing, replace drywall.Details
repair existing bathroom water closet & tub / shower sink. drywall at brick underground plumbing, replace drywall. | $10,000 |
| Dec 6, 2013 | Never finaled issued Dec 2013, no final | 745 Gough St | replace (e) 2 x 4 of stair landing which has rotten with pressure treated ones; remove (e) attachment of 4x12, replace new; all work is of less than 50%Details
replace (e) 2 x 4 of stair landing which has rotten with pressure treated ones; remove (e) attachment of 4x12, replace new; all work is of less than 50% | $8,000 |
| Mar 17, 2009 | Completed final sign-off Apr 2009 | 1025 Powell St | provide a 1 hour fire resistant surface to the ceiling (north garage) by install 5/8" type x drywall per ga file no. 5420. comply with nov 200991661, items 4,5, and 6. also, provide 1-hour fire resistant construciton @ tradesman's alley.Details
provide a 1 hour fire resistant surface to the ceiling (north garage) by install 5/8" type x drywall per ga file no. 5420. comply with nov 200991661, items 4,5, and 6. also, provide 1-hour fire resistant construciton @ tradesman's alley. | $1,500 |