Michael Harris
- Listed as
- architect, engineer
- Firm
- Michael Harris Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jun 2003 to May 2022
39 permits since 2000 (architect on 37 permits, engineer on 2 permits): 25 completed, 8 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 13, 2022 | Expired or cancelled cancelled Jan 2026 | 5815 03rd St | construct accessible ramp and stair in prw sidewalkDetails
construct accessible ramp and stair in prw sidewalk | $15,000 | |
| Aug 15, 2018 | Completed final sign-off Apr 2019 | 655 Kansas St | Doherty Restoration, Inc. | revision to 201703010446 2nd floor corridor forDetails
revision to 201703010446 2nd floor corridor for | |
| Jul 13, 2018 | Completed final sign-off May 2019 | 785 14th St | P Jordan Builders Inc | add one adu (studio) bathroom & kitchen per ordinance 162-16. all structural work done under #2016-0808-4468 & #2016-1014-0343. 3 adu's to be added under #2016-1014-0343.Details
add one adu (studio) bathroom & kitchen per ordinance 162-16. all structural work done under #2016-0808-4468 & #2016-1014-0343. 3 adu's to be added under #2016-1014-0343. | $75,000 |
| Apr 9, 2018 | Never finaled issued Apr 2018, no final | 600 Stanyan St | Cannon General Contracting Inc | revision to 201510200259 in bedroom of apt 001 omit add operable 45 min window of fusible link as rescue window. omit windows on east side if livingDetails
revision to 201510200259 in bedroom of apt 001 omit add operable 45 min window of fusible link as rescue window. omit windows on east side if living | |
| Jan 5, 2018 | Completed final sign-off Jun 2019 | 3169 California St | add (1) adu per ord 162-16 at ground level. (1) kitchen, (1) bathroom, (1) bedroom at ground level. soft story work under permit #2016/0803/4048. sprinklers and alarm under separate permits.Details
add (1) adu per ord 162-16 at ground level. (1) kitchen, (1) bathroom, (1) bedroom at ground level. soft story work under permit #2016/0803/4048. sprinklers and alarm under separate permits. | $75,000 | |
| Sep 11, 2017 | Completed final sign-off Mar 2023 | 200 Arguello Bl | Flanagan Construction | revision to pa 201506300363 - revise bike parking.Details
revision to pa 201506300363 - revise bike parking. | |
| Aug 30, 2017 | Completed final sign-off Nov 2018 | 246 Missouri St | Custom 6 Builders | raise rear roof 2 feet. relace rear windows, not visible from street.Details
raise rear roof 2 feet. relace rear windows, not visible from street. | $50,000 |
| Aug 4, 2017 | Never finaled issued Aug 2017, no final | 1938 Bush St | M H M Construction | unit #3 interior remodel - remodel kitchen & bathroom, add bathroom, relocate interior non-bearing walls.Details
unit #3 interior remodel - remodel kitchen & bathroom, add bathroom, relocate interior non-bearing walls. | $50,000 |
| Apr 4, 2017 | Completed final sign-off Apr 2017 | 317 Los Palmos Dr | revision to 201509177319, omit all work 2nd flr - permit changes at kitchen and bath - omit those changesDetails
revision to 201509177319, omit all work 2nd flr - permit changes at kitchen and bath - omit those changes | ||
| Nov 23, 2016 | Never finaled issued Dec 2016, no final | 740 Rhode Island St | P Jordan Builders Inc | interior remodel kitchen and remodel one bathroom, add one bathroom. add walls to add bedrooms. replace rear windowsDetails
interior remodel kitchen and remodel one bathroom, add one bathroom. add walls to add bedrooms. replace rear windows | $50,000 |
| Oct 7, 2016 | Expired or cancelled withdrawn Apr 2017 | 600 Stanyan St | change of designation of confomring units (17). n/a for maher ordinance no.155-13.Details
change of designation of confomring units (17). n/a for maher ordinance no.155-13. | ||
| Dec 17, 2015 | Expired or cancelled expired Sep 2017 | 101 Sanchez St | P Jordan Builders Inc | to clarify unit addresses on pa #201511041772. addresses are to match the issued addresses - unit #305 is changed to 107 sanchez st; #301 is changed to 781 - 14th street; #102 is changed to 787 - 14th street. n/a maher ordinanceDetails
to clarify unit addresses on pa #201511041772. addresses are to match the issued addresses - unit #305 is changed to 107 sanchez st; #301 is changed to 781 - 14th street; #102 is changed to 787 - 14th street. n/a maher ordinance | |
| Nov 30, 2015 | Expired or cancelled withdrawn Oct 2017 | 1500 Mcallister St | reference structural under soft story permt#201505216944. work includes adding a dwelling unit @ ground level (per ordiance 30-15)includes slab excavation, lowering exterior entarance door w/level landing, adding 3 new windows in kind @ (e) locations. new egress @ unit, directly to public right awayDetails
reference structural under soft story permt#201505216944. work includes adding a dwelling unit @ ground level (per ordiance 30-15)includes slab excavation, lowering exterior entarance door w/level landing, adding 3 new windows in kind @ (e) locations. new egress @ unit, directly to public right away | $100,000 | |
| Oct 27, 2015 | Completed final sign-off Dec 2016 | 946 Ashbury St | Peter Harris Construction Inc | interior remodeling at 3rd level including replacing existing bathroom finishes, fixtures, & plumbing. add dormer & skylights @ bathroom.Details
interior remodeling at 3rd level including replacing existing bathroom finishes, fixtures, & plumbing. add dormer & skylights @ bathroom. | $10,000 |
| Mar 12, 2015 | Completed final sign-off Mar 2017 | 1100 Sacramento St | Stephenson Construction Co | interior remodel at unit 608. remodel includes replaceing (e) kitchen and 2 bathrooms. replacing all windows in kind. demo of non bearing interior partitions and finishes.Details
interior remodel at unit 608. remodel includes replaceing (e) kitchen and 2 bathrooms. replacing all windows in kind. demo of non bearing interior partitions and finishes. | $50,000 |
| Jan 29, 2015 | Completed final sign-off Oct 2015 | 1100 Sacramento St | Stephenson Construction Co | work to unit #902. interior remodel including bathrooms and kitchen; move interior entry door to unit; replace existing wood windows with new double-glazed, aluminum-clad wood. window profiles to match existing.Details
work to unit #902. interior remodel including bathrooms and kitchen; move interior entry door to unit; replace existing wood windows with new double-glazed, aluminum-clad wood. window profiles to match existing. | $250,000 |
| Feb 4, 2014 | Never finaled issued Jun 2014, no final | 248 Fillmore St | Wolfe Painting Co | change of use of one commercial space at 248 fillmore to limited service restaurant. new finishes, cabinets and sinks - compliance with mahner ordinance no.155-13 not requiredDetails
change of use of one commercial space at 248 fillmore to limited service restaurant. new finishes, cabinets and sinks - compliance with mahner ordinance no.155-13 not required | |
| Dec 31, 2013 | Never finaled issued Dec 2013, no final | 1100 Sacramento St | Stephenson Construction Co | correction to app #201312113945- the description of work on the submitted drawings include units 602 and 908 - but these units were left off on application and is not in computer - permit to add units 602 and 908Details
correction to app #201312113945- the description of work on the submitted drawings include units 602 and 908 - but these units were left off on application and is not in computer - permit to add units 602 and 908 | |
| Nov 22, 2013 | Never finaled issued Nov 2013, no final | 250 Fillmore St | erect indirect electric double faced projecting signDetails
erect indirect electric double faced projecting sign | $4,000 | |
| Oct 30, 2013 | Completed final sign-off Feb 2016 | 1 Gladeview Wy | Cannon's Gen. Constracting | rear deck at 2nd level with stair. add bathroom and family room on ground level per plan.Details
rear deck at 2nd level with stair. add bathroom and family room on ground level per plan. | $15,000 |
| Jul 15, 2013 | Never finaled issued Oct 2013, no final | 1100 Sacramento St | Stephenson Construction Co | tenant improvement in partial basement only , not related to pa #2013.03.06.1631. remodel kitchen & bath in existing apt #006. convert bldg storage to exercise room for tenant only. sprinklers and fire alarm on separate permit.Details
tenant improvement in partial basement only , not related to pa #2013.03.06.1631. remodel kitchen & bath in existing apt #006. convert bldg storage to exercise room for tenant only. sprinklers and fire alarm on separate permit. | $12,000 |
| May 28, 2013 | Completed final sign-off Oct 2013 | 378 Golden Gate Av | M H M Construction | bldg has fire damage a 2nd-5 flr #241,341,441,541- roof scope of damages is limited to a lightwell, bldg storages rm & apartment adjacent to light well, work inc repl of damages surfaces, framing & fixtures, no walls will be added or move, replace all fixture & windows in e location, wallsDetails
bldg has fire damage a 2nd-5 flr #241,341,441,541- roof scope of damages is limited to a lightwell, bldg storages rm & apartment adjacent to light well, work inc repl of damages surfaces, framing & fixtures, no walls will be added or move, replace all fixture & windows in e location, walls | $50,000 |
| May 10, 2013 | Completed final sign-off Jan 2014 | 1100 Sacramento St | Stephenson Construction Co | #208 - replace fixtures & finishes in one bathroom, add bathroom, interior remodeling, no structural or exterior work.Details
#208 - replace fixtures & finishes in one bathroom, add bathroom, interior remodeling, no structural or exterior work. | $75,000 |
| May 10, 2013 | Completed final sign-off Jul 2013 | 1100 Sacramento St | Stephenson Construction Co | #1008 - revision to appl #2012.09.04.8879 - change guardrail at stair from 42" above nose of tread to 36".Details
#1008 - revision to appl #2012.09.04.8879 - change guardrail at stair from 42" above nose of tread to 36". | |
| Sep 4, 2012 | Completed final sign-off Sep 2013 | 1100 Sacramento St | Stephenson Construction Co | units #202/302/304/904 - remodel 4 bathrooms at each unit. units #304 & #904 - remodel 2 bathrooms & kitchen at each unit, new finishes, fixtures, & cabinets at each. 2 kitchens at 160 sf ea. 6 baths at 50 sf ea, 2 baths at 110 sf ea, 2 baths at 30 sf ea.Details
units #202/302/304/904 - remodel 4 bathrooms at each unit. units #304 & #904 - remodel 2 bathrooms & kitchen at each unit, new finishes, fixtures, & cabinets at each. 2 kitchens at 160 sf ea. 6 baths at 50 sf ea, 2 baths at 110 sf ea, 2 baths at 30 sf ea. | $75,000 |
| Sep 4, 2012 | Completed final sign-off Apr 2014 | 1100 Sacramento St | Stephenson Construction Co | 10th floor unit #1008 - revision to appl #2012.0416.8335 - remvoe additoinal non-bearing walls, omit half bath, revise guardrail at stair, revise guardrail at 11th floor, revise bracing at chimneys, structural upgrade at portion of living room ceiling.Details
10th floor unit #1008 - revision to appl #2012.0416.8335 - remvoe additoinal non-bearing walls, omit half bath, revise guardrail at stair, revise guardrail at 11th floor, revise bracing at chimneys, structural upgrade at portion of living room ceiling. | |
| Feb 7, 2012 | Never finaled issued Feb 2012, no final | 1351 Masonic Av | correct permit application #200909187197, third floor was incorrectly listed as storage, third floor consisted of three habitable rooms - corrected square footage from 314 sf to 40 sf of addition. no work to be performed at this permit.Details
correct permit application #200909187197, third floor was incorrectly listed as storage, third floor consisted of three habitable rooms - corrected square footage from 314 sf to 40 sf of addition. no work to be performed at this permit. | ||
| Dec 6, 2011 | Completed final sign-off Apr 2012 | 417 Stockton St | Gotham Bay Construction | expansion of (e) kitchen of restaurant on 2nd floor. work includes remodeled bathrooms, removal of raised seating area, new booth seating, partition walls & dropped ceiling. fire protection under seperate permitDetails
expansion of (e) kitchen of restaurant on 2nd floor. work includes remodeled bathrooms, removal of raised seating area, new booth seating, partition walls & dropped ceiling. fire protection under seperate permit | $115,000 |
| Jul 12, 2011 | Completed final sign-off Dec 2011 | 43 Clifford Tr | substitute metal clad wood windows for wood windows approved per pa #201103252859. revise pa#201103252859. (11 replacement windows total).Details
substitute metal clad wood windows for wood windows approved per pa #201103252859. revise pa#201103252859. (11 replacement windows total). | ||
| Mar 25, 2011 | Completed final sign-off Dec 2011 | 43 Clifford Tr | replace extg wood windows with new duel glazed wood windows per plan. rebuild rear deck and stair st existing location.Details
replace extg wood windows with new duel glazed wood windows per plan. rebuild rear deck and stair st existing location. | $30,000 | |
| Mar 25, 2011 | Completed final sign-off Feb 2012 | 2470 Broadway | Peter Harris Construction Inc | to replace (e) rear decking, guardrail & to replace structure as required.Details
to replace (e) rear decking, guardrail & to replace structure as required. | $50,000 |
| Feb 4, 2011 | Completed final sign-off Feb 2012 | 2534 47th Av | Bill Walsh Construction | vertical extension at two levels of 20 ft, width of 25 ft. extension iwll include 2 bedrooms, 2 bathrooms, and family room & 1/2 bath, laundry room / storage.Details
vertical extension at two levels of 20 ft, width of 25 ft. extension iwll include 2 bedrooms, 2 bathrooms, and family room & 1/2 bath, laundry room / storage. | $150,000 |
| Jun 2, 2010 | Completed final sign-off Jan 2011 | 1270 Valencia St | R J M Properties | add 2 restrooms, 2 sinks, electrical work; ref pa for existing compliance #2007.12.10.0140Details
add 2 restrooms, 2 sinks, electrical work; ref pa for existing compliance #2007.12.10.0140 | $38,000 |
| Dec 24, 2009 | Completed final sign-off Feb 2010 | 1270 Valencia St | R J M Properties | tenant improvment for retail space. to include employee breakroom, drywall, and lighting fixtures. ref app 200712100140Details
tenant improvment for retail space. to include employee breakroom, drywall, and lighting fixtures. ref app 200712100140 | $25,000 |
| Feb 7, 2008 | Completed final sign-off May 2009 | 230 Pacheco St | Area Development Inc. | 3 story addition, 155 sf per floor. ground floor: exercise room, 1st floor music room, 2nd flr: dressing room. remodel/reconfigure master bath 2nd fl.Details
3 story addition, 155 sf per floor. ground floor: exercise room, 1st floor music room, 2nd flr: dressing room. remodel/reconfigure master bath 2nd fl. | $80,000 |
| Sep 26, 2007 | Completed final sign-off Feb 2009 | 2199 Mission St | Bryce C B Construction Inc | replace 2nd restore store front in original openings, add accessible bathroom,replace non conforming bathroom, add coutner and cafe equipment,remodel storage mezzanine, replace exist stair to mezzanine, interior surfaces,mechanical & fire safety under seperate permit.Details
replace 2nd restore store front in original openings, add accessible bathroom,replace non conforming bathroom, add coutner and cafe equipment,remodel storage mezzanine, replace exist stair to mezzanine, interior surfaces,mechanical & fire safety under seperate permit. | $50,000 |
| May 4, 2007 | Expired or cancelled cancelled Sep 2011 | 3150 18th St | build out of new space - kitchen, interior finishes for cafe change of use b1 to a-3. add 2 hr glazing. extg permit appl for new bldg 200405214487.Details
build out of new space - kitchen, interior finishes for cafe change of use b1 to a-3. add 2 hr glazing. extg permit appl for new bldg 200405214487. | $100,000 | |
| Feb 7, 2005 | Completed final sign-off Aug 2005 | 60 Mountain Spring Av | remove structural (vertical concrete column with horizontal steel beam.Details
remove structural (vertical concrete column with horizontal steel beam. | $4,000 | |
| Jun 22, 2003 | Expired or cancelled expired Sep 2008 | 535 Florida St | occupancy classification remains a-3 based on removal of pool tables and dining table. new women's restroom @ 1st level under this permit & upgrade building 1 hour rated.Details
occupancy classification remains a-3 based on removal of pool tables and dining table. new women's restroom @ 1st level under this permit & upgrade building 1 hour rated. |